B2GM Summary 1 Blacksburg, VA, July 4-7 B2GM Summary 1 Blacksburg, VA, July 4-7

B2GM Summary 1 Blacksburg, VA, July 4-7 - PowerPoint Presentation

RockOn
RockOn . @RockOn
Follow
344 views
Uploaded On 2022-08-04

B2GM Summary 1 Blacksburg, VA, July 4-7 - PPT Presentation

Executive changes Spokesperson Peter Krizan gt Tom Browder IB Chair Eunil Won gt Zdenek Dolezal Aihara san will remain as EB chair Masa Yamauchi Yoshihide Sakai Belle II Project Manager ID: 935319

production batch processing emcm batch production emcm processing metal july wafers days started report ready belle 2013 finished rvc

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "B2GM Summary 1 Blacksburg, VA, July 4-7" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

B2GM Summary

1

Blacksburg, VA, July 4-7

Executive changes

Spokesperson: Peter

Krizan

-> Tom Browder

IB Chair:

Eunil

Won -> Zdenek Dolezal

Aihara

-san will remain as EB

chair

Masa

Yamauchi

Yoshihide

Sakai (Belle II Project Manager)

SVD

detector co-leaders (T.

Tsuboyama

, M.

Friedl

)(K. Hara, C.

Irmler

)

Computing/software

position will be modified:

Computing” T. Hara

,

“Software”, T.

Kuhr

New

physics co-coordinator (

Bostian

Golob

->(

P.

Urquijo

, K.

Trabelsi

)

Slide2

New Belle II Members

2

Slide3

Statistics

3

Slide4

DEPFET Production

4

Sensor production started in July 2012

2 batches with 13 and 18 wafers

Batch 1: FOL finished,

Metal layers waiting for EMCM

Batch 2: started Feb. 2013, 18 wafers

Batch was split in 9 + 9 wafers processing fine (ahead by 21 days)

Batch 3: tailing (~ 7 steps behind)

Slide5

Batch 1

faster than planned (300d/360d, can be done in 220 days) Wait for EMCM test before start of metal layer processing: 8.7.2013

Batch 2/3

another 100/120 days for FOL, will be finished well before end of 2013

Expect the first sensors to be ready in July 2014, as scheduled!

PXD9

Production

5

Calender

Days

Production steps

Split

Slide6

EMCM

6

Electrical dummy: Metal layers only, to be complemented with ASICs

tests electrical functionality of the module

routing

cross talk, voltage drops, RC-delays

processing issues (shorts, interruptions)

Absolutely mandatory to test EMCM before metal processing is started.

1

st

batch of EMCMs failed because of a processing error 2

nd batch (wafers for process development) => 3 good EMCMsThey are now at IZM, Berlin for ASIC bonding.

New batch with EMCMs in production (8 x 7 ready soon)

Plan is to achieve ‘production go’ by end of September

Despite the setbacks the EMCM productions turned out to be extremely useful in order to improve our design and technology

We still have enough contingency in to meet our schedule

(first sensors ready in July 2014)

Slide7

TC report (Ushiroda

-san)

7

Slide8

TC Report: RVC

8

Slide9

TC report: Background

9

Slide10

Conclusions

10

PXD: Attendance low, finished our session in < 3h

lack of discussion on RVC and Assembly/Installation

=> need to be well prepared for BPAC

(VXD hat ~ 8h session!)

Background becomes acceptable but not enough safety margin Factor 2 is suggested

Do we have to increase the gold layer in the beam pipe ?

Belle II: change in management

collaboration still growing TOP on the critical path