EiC Vijay Narayanan DEiC CEDA BoG Meeting November 2011 Number of pages 2010 2128 used of 2145 2011 2016 allocated expect to be within 5 pages of this Backlog stable at 5 months ID: 935320

time special mos days special time days mos 2010 pages ceda sections 2011 process tcad board

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "TCAD Report Sachin S. Sapatnekar" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

TCAD Report

Sachin S. Sapatnekar, EiCVijay Narayanan, DEiCCEDA BoG MeetingNovember 2011

Slide2

Number of pages

2010: 2128 used of 21452011: 2016 allocated: expect to be within +/-5 pages of this

Backlog stable at ~5 monthsNew-look TCAD newsletterImpact: 15 of 25 top accessed articles from 2011; 4 from 2010

Key statistics

Impact factor: 1.252

Submissions up 8%

Acceptance rate

In the last 12

mos: 39.0%Average review cycle: time to first decisionIn the last 12 mos: 61 daysAverage: 55 days

Slide3

Keynote papers/special sections

AprilCong et al.: High-Level Synthesis for FPGAs: From Prototyping to DeploymentJulyRivers et al.: Error Tolerance in Server Class ProcessorsOctoberJanapa Reddi

/Brooks: Resilient Architectures via Collaborative Design: Maximizing Commodity Processor Performance in the Presence of VariationsJanParallel CAD special sectionUpcoming quarterly – several in the pipe

Data center power management (Pedram)CNT technologies (Mitra

)

Reliability (Cao)

Litho

(Pan)

Special sections in processPhysical design3D (coming soon)Timing/software incl. repository (need CEDA support)Special initiatives

Slide4

Maintain turnaround time statsAverage time to first decision brought down from ~75 days to 61 days

Best Paper process 2012Refine new process, include involvement of communityInstitute best reviewer awardNeed to sync with CEDA ExComNew editorial board for 2012Several new AEs on board in areas of needWang (UCSB), Ziv (IBM), Seshia (UCB)

Routine updates for next yearPlease feel free to suggest good candidates

To-do items for 2012