JKSERC Page 233 Schedule 9 HT Industrial SupplyApplicability The Commission has de ID: 960683
Download Pdf The PPT/PDF document "MYT Order for 2nd MYT Control Period FY ..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
MYT Order for 2nd MYT Control Period FY 2016-17 to FY 2020-21 and retail tariff for FY 2016-17 JKSERC Page 233 Schedule 9: HT Industrial SupplyApplicability The Commission has decided that HT industrial supply shall be applicable to all units registered with the Industries department, Government of J&K, and covered under the Factories Act. The list of entities covered shall include various industrial installations and workshops with manufacturing facilities, where raw materials are converted to finished goods. This shall mean and include all energy consumed in factory, offices, stores, canteen, compound lighting, etc. and residential use therein, excluding power intensive industries. Character of Services (a)AC, 3 phase; 50 Hz on 11 KV with sanctioned load above 100 kW upto 1 MVA AC, 3 phase; 50 Hz, 33 KV and above for sanctioned load of 1 MVA and above Rate of Charge Table 192: Approved Tariff for HT Industrial Category Particulars Approved Tariff for FY 2016-17 11 KV Supply Energy Charge (Rs./ KVAh) * 2.95 Demand Charge (Rs./ kVA/ Month) *^ 136.5 * For Connections with sanctioned load above 100 kW metered on LT, Additional 5% Surcharge on Demand & Energy Charges at 11 KV tariff shall be chargeable ; ^ Or part thereof on Billing Demand 33 KV Supply# Energy Charge (Rs./ KVAh)** 2.86 Demand Charge (Rs./ kVA/ month) ^ 136.50 #ToD tariff applicable ** Rebate to Connections at higher voltages: For 66 kV 1.5% on the Energy Charge for 33 kV Supply; ^ Or part thereof on Billing Demand (a)The billing demand for any month shall be taken to be the higher of the actual maximum recorded demand or 75% of the Contract Demand. (b) The demand in excess of contracted load shall be billed in accordance with para nos. 11.10, 11.11 and 11.12 of the Chapter 11: Terms and Conditions of Tariff /Definitions of this Order.