Environmental Issues BIOWAT short for Biomedical Waste Water Treatment An improvised facility for the treatment amp disposal of liquid waste Biomedical waste water generated at Primary Health Center ID: 1037922

waste cost treatment biowat cost waste biowat treatment rupees biomedical water health bed demand operated vitamin chlorine ascorbic acid

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "The BIOWAT Problem Statement" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

1. The BIOWAT

2. Problem Statement

3. (Environmental Issues)

4. BIOWAT- short for Biomedical Waste Water TreatmentAn improvised facility for the treatment & disposal of liquid waste (Biomedical waste water) generated at Primary Health Center, Nartiang West Jaintia Hills Meghalaya.At BIOWAT, following a simple primary, liquid waste undergoes four stages of treatment before disposal viz.,Intermittent/Demand operated Slow sand filtrationChlorine DisinfectionCarbon AdsorptionDe-chlorination with Vitamin-C(ascorbic acid) Description

5. SSF (Demand Operated)Flow Meter-1Chlorine contact TankGAC Bed-1GAC Bed-2GAC Bed-3

6. At BIOWAT, dechlorination with Vitamin-C(ascorbic acid) is the final stage of treatment of biomedical waste water. Free residual chlorine is neutralized based upon a reaction by M.W.Tikkanen et al., in 2001.

7. Outcome (Discharge parameters of effluent) Free Chlorine : 0mg/LpH: 7-7.5Fish survival 100%>96hrsTurbidity: < 5NTU

8. Estimated cost:Initial Start cost: Rs.200000/- (rupees two lac only).Daily running (logistic support)cost:Rs.20/-(rupees twenty only)Annual (cost of GAC): Rs.10000(rupees ten thousand only)Partners:Health Engineering wing

9. Benefits:Simple operation and maintenanceEfficient removal of chlorineZero energy consumption for daily operationLow cost – start up and runningScalability: Health Department in the process of replication at PHCs & CHCs