171Appendix BJSF FACO SITE ASSESSMENT - PPT Presentation

aProvidebIs 172FACO Alternatives for the Joint Strike FighterAFMC Instruction 91101 NATOPS 0080R14 eDofHow much land is available for future expansionProduction factory ID: 827325

rate site strike faco site rate faco strike labor alternatives joint aircraft jsf production flight local facility provide final

Share:

Link:

Embed:

Download Presentation from below link

Download Pdf The PPT/PDF document "171Appendix BJSF FACO SITE ASSESSMENT" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

171Appendix BJSF FACO SITE ASSESSMENTa.
171Appendix BJSF FACO SITE ASSESSMENTa.Provideb.Is172FACO Alternatives for the Joint Strike FighterAFMC Instruction 91-101 & NATOPS 00-80-R-14)? e.Dof.How much land is available for future expansion?Production (factory)_________________Administrative (office) _________________Laboratory_________________Warehouse_________

________Total Floor Space_______________
________Total Floor Space_________________JSF FACO Site Assessment173utilized for final assembly of aircraft. Please separate high-bayCondition-Condition-Activity?Ñd.Flight Prep Facilities. Provide key attributes of hangars avail-able/utilized to prepare aircraft for flight test.Building #Dimensions(L' × W' × H')AirCondit

ioning/HumidityControl (Y/N)FireSuppress
ioning/HumidityControl (Y/N)FireSuppression?(Y/N) Type?# of Bays/Positions for174FACO Alternatives for the Joint Strike FighterPositionsEnclosed (Y/N)Is the site accessible via interstate highway? Is the site accessible via railroad? of tactical aircraft? testing? JSF FACO Site Assessment175Components Complete Aircraf

t What is the average cost per kWh?
t What is the average cost per kWh? _________of power outages? which resulted in a work stoppage? flight tests). facility. local community. If there is community pressure, what form does it take176FACO Alternatives for the Joint Strike Fighterfied data and equipment? a.Ismatter (new and old

standards)? b.Howmany air permits ex
standards)? b.Howmany air permits exist at this site? ____________c.What kind of air control technology exists at this site?d.Whate.Provideof explosives, e.g., ejection seat cartridges? JSF FACO Site Assessment177a. FACO will require workers with a variety of skills for production,labor. Please provide the number of

employees in the followingsome contracto
employees in the followingsome contractors, and is meant to serve as a template. If con-1999200020012002Total EmployeesTouch LaborSubassemblyoperationsAircraft final assemblyFinal paint and coatingsRamp, flight test, andOther Direct LaborQuality controlManufacturing andTool manufacturingIndirect Laborb.Number of n

ew production aircraft delivered (by pro
ew production aircraft delivered (by program).Program1999200020012002178FACO Alternatives for the Joint Strike FighterProgram1999200020012002a.Is this site in an Enterprise Zone and eligible for state or local taxand development incentives? b.Does the company utilize any taxes at this site? Local taxes? guarantees or

direct state aid at this site?
direct state aid at this site? Local incentives? Section 6. Financial. JSF FACO Site Assessment179199920002001LaborRate $LaborandFringeRate $LaborRate $LaborandFringeRate $LaborRate $LaborandFringeProduction*Quality AssuranceTooling*General*EngineeringProduction Laborb.Does this site have a Forward

Pricing Rate Agreement (FPRA) inplace?
Pricing Rate Agreement (FPRA) inplace? If Yes, when was it negotiated? ___________: If any of the following questions are directly answered in thed.What is the forecast business base (by program or activity) usedto develop the rates for the contractor at this facility? Please list180FACO Alternatives for the Joint Strike

FighterProgram20012002200320042005e.
FighterProgram20012002200320042005e. What is the history of the business base at this facility over thelast five years in terms of increases or decreases from the currentf. Does the facility have program specific wrap rates? If so, pleaseprovide them. If a composite wrap rate by major functionidentify each. What costs ar

e included in each pool and howwrap rate
e included in each pool and howwrap rate at this location? i. Provide the following sensitivities of the composite labor wraprate and overhead rate to changes from the current (FY 2001)JSF FACO Site Assessment181RateG&A Rate+25%+10% 0%Ð10%Ð25%j. Please explain how the composite rate is built-up, starting fromthe b

asic direct labor through the total WRAP
asic direct labor through the total WRAP rate. Which costsWhat is the base used to calculate the burden rate? Are therevalue items? If so, please provide the rates and bases. Whatthe company? by a union? 182FACO Alternatives for the Joint Strike FighterExpiration DateLast Strike Datethere a companywide union agreemen