M anufacturing p lanning 27 FEVRIER 2013 ESAC Revue Maria Durante 26 février 2013 OUTLINE 26 février 2013 PAGE 2 CEA 27022013 Procurements FOR M1 34 coils Procurements FOR ID: 920401

2013 coil winding copper coil 2013 copper winding foreseen tooling cea page 13lun cc3401 components vrier nb3sn lun smmar

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "E u CARD 7.3 FRESCA 2 DIPOLE" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

EuCARD 7.3 FRESCA 2 DIPOLEManufacturing planning

27 FEVRIER 2013

ESAC Revue | Maria Durante

26 février 2013

Slide2

OUTLINE26 février 2013| PAGE 2

CEA | 27/02/2013

Procurements FOR M1: 3-4 coils

Procurements FOR

M1: 1-2 coils

Schedule

of one coil

manufacturing

First magnet schedule

Second

magnet schedule

Slide3

Procurements FOR M1: 3-4 coils26 février 2013| PAGE 3

CEA | 27/02/2013

3-4

COIL

TOOLS

Winding

tooling

:

DELIVERED, WINDING SPOOLS

UNDER

MODIFICATION

Reaction tooling :

DELIVERED

Instrumentation and splice

tooling : AVAILABLE AT CERNImpregnation tooling : FORESEEN FOR END OF MARCHFIRST COPPER COIL COMPONENTS - CC3401Insulated Copper cable : 270 m UNIT LENGTH AVAILABLE AT CEACoil components: DELIVERED, WITH Al2O3 COATINGInterlayer insulation : UNDER REALIZATION (BINDER APPLICATION) AT CERN Copper CC3401 coil winding is foreseen for end of March/beginning of April 2013.Nb3Sn COILS : CR3401 and CR3402RRP Nb3Sn strand: AVAILABLE AT CERNCoil components : DELIVERED, TO BE ALUMINA COATEDInterlayer insulation : TO BE PROVIDED First Nb3Sn 3-4 type coil is foreseen after 1-2 copper coil, for September 2013.

Slide4

Procurements FOR M1: 1-2 coils26 février 2013| PAGE 4

CEA | 27/02/2013

1-2 COIL

TOOLS

Winding tooling :

UNDER REALIZATION,

WINDING TABLE FORESEEN FOR END OF APRIL 2013

Reaction

tooling :

CALL FOR TENDER STARTED

Instrumentation and splice tooling :

AVAILABLE AT CERN

Impregnation

tooling :

CAO DETAILED DESIGN UNGOINGSECOND COPPER COIL COMPONENTS – CC1201Coil components: FORESEEN FOR MID MAY 2013ALUMINA COATING 5 WEEKS LATERInsulated Copper cable : BARE CABLE AVAILABE AT CERN, TO BE INSULATED Copper CC1201 coil winding is foreseen for end of June.Nb3Sn COILS : CR1201 and CR1202RRP Nb3Sn strand: AVAILABLE AT CERNCoil components for CR1201: FORESEEN FOR MID MAY 2013, ALUMINA COATING 5 WEEKS LATERCoil components for CR1202 : CALL FOR TENDER TO BE LAUNCHED First 1-2 Nb3Sn coil winding is foreseen after 3-4 Nb3Sn coil, for November 2013;

Slide5

schedule of one coil manufacturingFebruary 26, 2013| PAGE 5

CEA | 27/02/2013

Schedule of one coil manufacturing : first copper coil

Nom de la tâche

Durée

Début

Fin

Copper 3-4 type coil manufacturing - CC3401

Lun 25/03/13

Lun 24/06/13

Coil winding - Copper coil CC3401

3 sm

Lun 25/03/13

Ven 12/04/13

Reaction mold assembly - Copper coil CC3401

1 sm

Lun 15/04/13

Ven 19/04/13

Expédition au Transfer from CEA to CERN - Copper coil CC3401

1 sm

Lun 22/04/13

Ven 26/04/13

Heat treatment preparation - Copper coil CC3401

1 sm

Lun 29/04/13

Ven 03/05/13

Coil heat treatment - Copper coil CC3401

10 joursécVen 03/05/13Lun 13/05/13 Reaction mold opening - Copper coil CC34011 smMar 14/05/13Lun 20/05/13 Coil Splices - Copper coil CC34011 smMar 21/05/13Lun 27/05/13 Coil Instrumentation - Copper coil CC34011 smMar 28/05/13Lun 03/06/13 Transfer into impregnation mold - Copper coil CC34011 smMar 04/06/13Lun 10/06/13 Coil Impregnation - Copper coil CC34012 smMar 11/06/13Lun 24/06/13 Transfer from CERN to CEA - 3-4 winding and reaction tooling1 smMar 11/06/13Lun 17/06/13

Slide6

First magnet schedule26 février 2013| PAGE 6

CEA | 27/02/2013

Slide7

Second magnet schedule26 février 2013| PAGE

7CEA | 27/02/2013

Slide8

DSM IRFUSACMCommissariat à l’énergie atomique et aux énergies alternativesCentre de Saclay |

91191 Gif-sur-Yvette CedexT. +33 (0)1 69 08 71 27 | F. +33 (0)1 69 08 69 49

Etablissement public à caractère industriel et commercial | RCS Paris B 775 685 019

26 février 2013

| PAGE

8

CEA | 10 AVRIL 2012

THANKS FOR YOUR ATTENTION