/
Mobility Initiatives Mobility Initiatives

Mobility Initiatives - PowerPoint Presentation

celsa-spraggs
celsa-spraggs . @celsa-spraggs
Follow
388 views
Uploaded On 2016-05-27

Mobility Initiatives - PPT Presentation

in Metro Manila Department of Transportation and Communications 12 March 2014 Line 1 Cavite Extension Construction of 117 km of rail to connect Baclaran terminal station to Niyog in Bacoor Cavite ID: 337638

manila line metro rail line manila rail metro station 000 construction quezon improvement city commuter cost project connect description cavite initiatives extension

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Mobility Initiatives" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Mobility Initiatives

in Metro ManilaDepartment of Transportation and Communications

12

March 2014Slide2

Line 1 Cavite Extension

Construction

of 11.7 km of rail to connect Baclaran terminal station to Niyog in Bacoor, Cavite

Project Cost:

Php

64.9

BIncludes construction of 3 intermodal facilities and 1 satellite depotWill serve an additional 500,000 to 700,000 riders dailyProject rebid ongoingSlide3

Line 2 East Extension

Construction of 4.19 km of rail from Santolan terminal station to Masinag, Antipolo

Project Cost: Php 9.76 B

Will

serve an additional 120,000 riders daily

Consultancy for Detailed Engineering Design (DED) awarded;

Consultancy for Electro-

Mechinical Systems undergoing bid evaluationSlide4

North-South Commuter Rail

Description

Design and construction of a standard gauge commuter rail line for

approx. 90 km

from

Malolos

,

Bulacan to Calamba, LagunaInvolves procurement of rolling stock and installation of electro-mechanical systemsAlso passes through Cavite, Batangas, Metro Manila, Rizal, and QuezonCost: USD 6.307 B

After ProjectExpected a

nnual demand of 750,000 in 2020; and over 1 M in 2030

Status

For NEDA Board approval

AlignmentSlide5

Mass Transit System

Description

Aims to connect the cities of Makati, Pasay and

Taguig

via a rail-based mass transit system

Estimated Cost:

USD 3.2 BStatusFeasibility Study ongoing,for completion by June 2014MakatiBonifacio Global City

Pasay

Manila

ParaƱaque

Slide6

Common Station, BRT

ProjectDescription

Common

Station

Establishment of an

elevated

station to connect the following lines: LRT 1, MRT 3, and MRT 7For biddingManila (Quezon Ave) BRTDevelopment of bus-based corridor improvement initiatives between Fairview and Manila City Hall Involves establishment of 31 stations along Quezon Avenue

Involves improvement of ancillary structures for pedestrians For submission to NEDASlide7

Initiatives for NCR

Line 1 Metro Line 2 Metro

Line 3 Metro

PNR Commuter

PNR Inter-City

Line 7

ITS

Bus SystemsC5 Corridor Improvement Manila (Quezon Ave) BRTFerry

bus

MRT7Slide8

Thank you.