Agenda Summary Update Current ActivitiesUpdates Startup Schedule Highlights Upcoming Talks Reports Meetings UpdatesTalks Salah Chaurize Booster Notcher Installation Ken Domann RLSUpdates ID: 629348
Download Presentation The PPT/PDF document "PIP Update Feb 20 th 2013" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
PIP Update
Feb 20
th
2013Slide2
Agenda
Summary Update
Current Activities/Updates
Startup Schedule Highlights
Upcoming Talks, Reports, Meetings
Updates/Talks:
Salah Chaurize - Booster
Notcher
Installation
Ken
Domann
– RLS/Updates
Kiyomi Seiya – Aperture scans & magnet movesSlide3
Update
General Info
Booster
SS
: Up and operating
SS Spares still in production – waiting for ANU to finish using anode supply
Booster Absorber (Talk Today – for sure this time)
Booster Aperture Scans and magnet moves (Kiyomi Talk)
Booster
RF cavity rework – Cavity 3 being installed today and RF15 removal
Cavity 1 work - tuner work has begun (two tuners off – no surprises)
Booster Ferrites – Dennis has started physical measurements (tester back)
Physical Measurements, Low Power Testing, High Power Testing (Pat S. will help)
RFQ – Running (still sparking) – waiting on trim magnet/building source B
Modifications to source
magnetics
, Changed Buncher tube (8kw)
HLRF –mostly still waiting (putting together new PR) soon will place order
Linac Modulator – work continues – No news
?
Linac Notch -
Safety permission to operate seed source and fiber amplifiers
preliminary work on beam shaping optics
Cogging – Software work continues – but waiting for Kiyomi time
Booster Shielding –detectors placed, connected to VME, Scans on Thursday!
Booster Cavity modeling – Mohamed is using new ferrite curves
MI Startup: Word is May – not sure why not official yet?
Startup
comments (Fernanda, Todd, Mary) Studies forthcoming?Slide4
RFQ Injector
Changed sources (added magnets) sparking
Bucher power up to 8kw
LINAC
7835 replacement for 5 today
Retuning Linac – to match Injector
BOOSTER
Disconnect corrector leads at L24Install re-furbished cavity that was originally removed from L15 (a.k.a. BRF3)Align L24 long straight, all elementsRepair several BLMs in MI8 line not showing losses, document locationsLM802A,LM803B,LM803C,LM803D,LM804Repair MW804Hose replacement for V803 psInvestigate IP13-1 on half ion pumpReplace VB21 VVHTQ4 replace regulatorPG20 and PG21 replace penning gaugesBuilding 3rd NotcherPreparing Transverse Pickup for installation
Insatall
RF3Slide5
Proton Improvement Plan Projection
NOvA
Shutdown
g-2
Mu2e
8
GeV
120
GeV
LBNESlide6
Upcoming Talks
Future Meetings:
Feb/Mar
Dave Augustine - Vacuum Installations Finished and in Planning
Jean-Paul
Carneiro
-
TraceWin 3D Simulations of the Fermilab Linac Dave Johnson - Progress with Linac Notcher Amplifiers Elliot McCrory - Linac BPM Upgrades Pellico – Shielding TestingJohn Reid - Solid State Installation - Final Report Pat Sheahan - Tuner Bias Supplies Leonid Vorobiev - ORBIT Simulations on Booster Injection and Acceleration Slide7
Upcoming
Reports (upcoming)
Update of PIP Design Report – Yearly update work
PIP talks/Special Meetings
Budget Issues –
Working to address cost of spares
Additional Overhead Cost – impact still being looked at
- Please use the E-Log to put general work in progress updates/photos – weekly would be nice – if progress is being made in task