Download The PPT/PDF document "Renovation of gas detection" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
Slide2Renovation of gas detection system in EHN1, JURA side
M. DOLEBE-ICS-ASDate: 02/08/16
EDMS number : EDMS-1710953V1
2
EDMS-
1710953
V1: Renovation of gas detection system in EHN1, JURA side
Slide331. Project progress
2. Requirements for next stepsOutline
EDMS-1710953
V1: Renovation of gas detection system in EHN1, JURA side
Slide441. Project progress (1/2)
Gas detection system (supplier part) :Study validated (supplier : SIMTRONICS)Next steps : electrical drawings and fabrication of the racksGas
detection system (installation part) :Specific cables
defined :
Compliant
among
others
to: ATEX, IS23, IS41,
Fire
resistant, EMCPurchasing startedObserved in the field :Some sensors under IS37 for several years (to be verified if required in the future)Not enough danger signalisations in the areas (recommendation also by HSE)Visit the 03/08 with HSE and EN/EA for validation (proposition EDMS-1523678V3)
EDMS-1710953V1: Renovation of gas detection system in EHN1, JURA side
Danger signalisation
(
audible and
visual
)
Slide551. Project progress
Planning (global overview) :Dec. 2016 : control system racks at CERN [BE/ICS] Before EYETS : pulling cables part 1/2 [EN/EL] Building 909 (
Gas supply building) Communication
loop between
I/O boxes and control system rack
Electrical
power supplies of the
I/O boxes and control system rack
(ESD 230Vac)
During
EYETS
: pulling cables part 2/2 [EN/EL] Experimental zones between I/O boxes and sensors/actuatorsBefore the end of EYETS [BE/ICS] Electrical connections, tests, commissioning
EDMS-1710953V1: Renovation of gas detection system in EHN1, JURA sideEYETS
Dec. 2016
May 2017
[
EN/EL
]
Pulling
cables
(part 1/2)
[
EN/EL
]
Pulling
cables(part 2/2)
Feb
. 2017
[
BE/ICS
] Connections, tests,
commissioning
[
BE/ICS
] Racks at CERN
Slide662. Requirements for next steps
HSE & EN/EA :Visit on site to confirm the proposition EDMS-1523678V3 Definitive number of sensors Definitive number of danger signalisationsDeadline :
12th August 2016EN/EL :Cost
/planning estimations for electrical
supplies
Complete central to
actuators
DIC
with
GMAO
references
of AUL boxes
Deadline for pulling of cables : end of Febuary 2017BE/ICS :Electrical connections, tests, commissioningDeadline for commissioning : end of EYETS (April 2017)
EDMS-1710953V1: Renovation of gas detection system in EHN1, JURA side
Slide7Slide88ANNEX
Connexion for danger signalisations in experimental zones :I/O box1 cable NGF18
Distribution box
(in the zones)
Up to 6
combined
signalisations
(
Flashing
lights/
Sirens
)
EDMS-
1710953
V1: Renovation of gas detection system in EHN1, JURA side