system in EHN1 JURA side M DOLE BEICSAS Date 020816 EDMS number EDMS 1710953 V1 2 EDMS 1710953 V1 Renovation of gas detection system in EHN1 JURA side 3 1 Project progress ID: 796499

edms system detection gas system edms gas detection renovation ehn1 jura cables side ics part pulling electrical eyets danger

Share:

Link:

Embed:

Download Presentation from below link

Download The PPT/PDF document "Renovation of gas detection" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Slide2

Renovation of gas detection system in EHN1, JURA side

M. DOLEBE-ICS-ASDate: 02/08/16

EDMS number : EDMS-1710953V1

2

EDMS-

1710953

V1: Renovation of gas detection system in EHN1, JURA side

Slide3

31. Project progress

2. Requirements for next stepsOutline

EDMS-1710953

V1: Renovation of gas detection system in EHN1, JURA side

Slide4

41. Project progress (1/2)

Gas detection system (supplier part) :Study validated (supplier : SIMTRONICS)Next steps : electrical drawings and fabrication of the racksGas

detection system (installation part) :Specific cables

defined :

Compliant

among

others

to: ATEX, IS23, IS41,

Fire

resistant, EMCPurchasing startedObserved in the field :Some sensors under IS37 for several years (to be verified if required in the future)Not enough danger signalisations in the areas (recommendation also by HSE)Visit the 03/08 with HSE and EN/EA for validation (proposition EDMS-1523678V3)

EDMS-1710953V1: Renovation of gas detection system in EHN1, JURA side

Danger signalisation

(

audible and

visual

)

Slide5

51. Project progress

Planning (global overview) :Dec. 2016 : control system racks at CERN [BE/ICS] Before EYETS : pulling cables part 1/2 [EN/EL] Building 909 (

Gas supply building) Communication

loop between

I/O boxes and control system rack

Electrical

power supplies of the

I/O boxes and control system rack

(ESD 230Vac)

During

EYETS

: pulling cables part 2/2 [EN/EL] Experimental zones between I/O boxes and sensors/actuatorsBefore the end of EYETS [BE/ICS] Electrical connections, tests, commissioning

EDMS-1710953V1: Renovation of gas detection system in EHN1, JURA sideEYETS

Dec. 2016

May 2017

[

EN/EL

]

Pulling

cables

(part 1/2)

[

EN/EL

]

Pulling

cables(part 2/2)

Feb

. 2017

[

BE/ICS

] Connections, tests,

commissioning

[

BE/ICS

] Racks at CERN

Slide6

62. Requirements for next steps

HSE & EN/EA :Visit on site to confirm the proposition EDMS-1523678V3 Definitive number of sensors Definitive number of danger signalisationsDeadline :

12th August 2016EN/EL :Cost

/planning estimations for electrical

supplies

Complete central to

actuators

DIC

with

GMAO

references

of AUL boxes

Deadline for pulling of cables : end of Febuary 2017BE/ICS :Electrical connections, tests, commissioningDeadline for commissioning : end of EYETS (April 2017)

EDMS-1710953V1: Renovation of gas detection system in EHN1, JURA side

Slide7

Slide8

8ANNEX

Connexion for danger signalisations in experimental zones :I/O box1 cable NGF18

Distribution box

(in the zones)

Up to 6

combined

signalisations

(

Flashing

lights/

Sirens

)

EDMS-

1710953

V1: Renovation of gas detection system in EHN1, JURA side