2015 NUCA March 19 2015 Colorado Springs Utilities Projects in solicitation phase Tesla Reservoir Liner Rehabilitation RFP documents on RMEPS proposals due 0401215 Solicitations 2 nd ID: 379493

rfp tank dam ifb tank rfp ifb dam repairs replacement quarter solicitations projects seepage level suction pipeline design soq homestake 2015 directional

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Projects Preview" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Projects Preview

2015

NUCA

March 19, 2015

Colorado Springs UtilitiesSlide2

Projects in solicitation phase

Tesla Reservoir Liner Rehabilitation

– RFP documents on RMEPS, proposals due 04/01/215

Solicitations 2

nd

quarter

Homestake

Suction Pipeline Replacement – Design

RFP, 66-inch PCP along Arkansas River, repair/selective replacement of 5,830 feet

Rampart Dam Low Level Seepage – Design RFP, mitigation of seepage at toe of Dam

Solicitations 3

rd

quarter

Homestake

Suction Pipeline Replacement – Industry Day followed by RFP for CM/GC

Rampart Dam Low Level Seepage – RFP for CMAR

Sanitary Sewer Directional Drill – IFB

Woodmen Valley Tank – 2.0

MG – IFB for repairs

Ute Pass Tank –

IFB for repairs

Biological Nutrient Removal Improvements at the

LVWWTP Treatment Plant – SOQ/IFBSlide3

Solicitations 4

th

quarter

Little Mesa Tank Replacement – 5.0 MG, new tank

Nichols Dam and Spillway

Modifications - SOQ/IFB Solicitation

Projects

schedule

TBD

Cheyenne Mountain 24” Directional

Drill 24” 400 feet

Wilson

Tank – 5.0 MG – Repairs

Upper Woodmen

Tank - .50 MG - RepairsSlide4