2015 NUCA March 19 2015 Colorado Springs Utilities Projects in solicitation phase Tesla Reservoir Liner Rehabilitation RFP documents on RMEPS proposals due 0401215 Solicitations 2 nd ID: 379493
Download Presentation The PPT/PDF document "Projects Preview" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
Projects Preview
2015
NUCA
March 19, 2015
Colorado Springs UtilitiesSlide2
Projects in solicitation phase
Tesla Reservoir Liner Rehabilitation
– RFP documents on RMEPS, proposals due 04/01/215
Solicitations 2
nd
quarter
Homestake
Suction Pipeline Replacement – Design
RFP, 66-inch PCP along Arkansas River, repair/selective replacement of 5,830 feet
Rampart Dam Low Level Seepage – Design RFP, mitigation of seepage at toe of Dam
Solicitations 3
rd
quarter
Homestake
Suction Pipeline Replacement – Industry Day followed by RFP for CM/GC
Rampart Dam Low Level Seepage – RFP for CMAR
Sanitary Sewer Directional Drill – IFB
Woodmen Valley Tank – 2.0
MG – IFB for repairs
Ute Pass Tank –
IFB for repairs
Biological Nutrient Removal Improvements at the
LVWWTP Treatment Plant – SOQ/IFBSlide3
Solicitations 4
th
quarter
Little Mesa Tank Replacement – 5.0 MG, new tank
Nichols Dam and Spillway
Modifications - SOQ/IFB Solicitation
Projects
schedule
TBD
Cheyenne Mountain 24” Directional
Drill 24” 400 feet
Wilson
Tank – 5.0 MG – Repairs
Upper Woodmen
Tank - .50 MG - RepairsSlide4
Questions
?