Backgroundto the ECA1ECAOis a notforprofit2is committed to addressing the needsof the industryby providing a variety ofdirectlyto the membership and by making representations on behalf of the ID: 854478

energy board ontario act board energy act ontario construction 2006 work market competition framework hydro connection proceeding power electricity

Share:

Link:

Embed:

Download Presentation from below link

Download Pdf The PPT/PDF document "EB2006020Ontario Energy Board Act 1998 S..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

1 EB-2006-020Ontario Energy Board Act, 199
EB-2006-020Ontario Energy Board Act, 1998, ScB, as amendedAND IN THE MATTER OF the Application of Great LakesRobert FranTelephoneEmailHeather LandymoreTel

2 ephoneEmail.landymore@macleoddixonMacleo
ephoneEmail.landymore@macleoddixonMacleod Dixon LLToronto-Dominion Centre, Canadian Pacific Tower Backgroundto the ECA1.("ECAO")is a not-for-profit2.is co

3 mmitted to addressing the needsof the in
mmitted to addressing the needsof the industryby providing a variety ofdirectlyto the membership, and by making representations on behalf of theindustryto

4 government and regulatory bodies3.'sria
government and regulatory bodies3.'srial, residential and electrical utility construction and maintenance marketplaceECAO'srvices,; the construction ando

5 f powergeneration equipment and faciliti
f powergeneration equipment and facilities (powerhouses and all related4.'sricalfiliated with, regulatedECAO's Issues5.submits that(I)'sCustomerConnection

6 s Process work should be amended toclari
s Process work should be amended toclarifythatworkon existingGLPL-ownedstation sites and existingright-of-waysis contestableContestable Work and Section71

7 (1) of the Ontario Energy Board Act,6.su
(1) of the Ontario Energy Board Act,6.submitsthat inaccordance with section71(1) of theOntario Energy Board Act,GLPL can only undertakeconnection construc

8 tionwork throughan affiliate7.Ontario En
tionwork throughan affiliate7.Ontario Energy Board Act, 1998provides that "[s]ubject tosubmits that connectionconstructionis a businessactivity that falls

9 outside of thescope of thetransmissionof
outside of thescope of thetransmissionof electricityConnection Construction Work Outside Scope of Transmitting Electricit9A Framework for Competition,the

10 Advisor2 \tthe time when demand was incr
Advisor2 \tthe time when demand was increasing as Ontario was electrifiedA Framework for CompetitionCommittee on Competition inElectricity System tothe On

11 tarioMinister ofEnvironment and Energyat
tarioMinister ofEnvironment and Energyat page2410(i)(Tr12Competitive Connection Construction Market Currently Exist\t3 14.Electricity Actpermitted Ontario

12 Hydro Networks Company"[t]he Board reco
Hydro Networks Company"[t]he Board recognizes that theElectricity Actdoes not provide definitive." (para15.The Board based its findings on the practical

13 realities of the electricity market at t
realities of the electricity market at the time,and the concern that a competitive connection construction market had not yet developedconcern€Paragraph 5

14 of the affidavit of Eryl Roberts sworn
of the affidavit of Eryl Roberts sworn on December 15, 2006 at page 217.Ontario Energy Board Act, 1998is in place inOntario Energy Board Act, 1998t As no

15 ted in the evidenceof ErylRoberts in the
ted in the evidenceof ErylRoberts in the Hydro One proceeding combined with this proceeding (EB-2006-field Power, Five Nations Energy Inc. and NB Power (N