CML 23024 Technology Cabling Phase 8 eRate PreBid Meeting November 29 2023 Welcome and Introductions CML Team Design Team Architects Linden Moody Nolan 300 Spruce Street Suite 300 ID: 1043986

2024 construction late bid construction 2024 bid late bidding project estimated direct cost amp window start schooley 000 2023

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Columbus Metropolitan Libraries" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

1. Columbus Metropolitan LibrariesCML 23-024 Technology Cabling Phase 8 eRate Pre-Bid MeetingNovember 29, 2023

2. Welcome and Introductions CML TeamDesign Team ArchitectsLinden: Moody Nolan 300 Spruce Street Suite 300Columbus, OH 43215 Barnett: Schooley Caldwell300 Marconi BoulevardColumbus, OH 43215+Evoke 401 Foster StDurham, NC 27701 Marion Franklin: Schooley Caldwell300 Marconi BoulevardColumbus, OH 43215+Evoke 401 Foster StDurham, NC 27701 Canal Winchester: Bostwick Design Partnership 2729 Prospect Ave E, Cleveland, OH 44115 MEP Engineer for all Four BranchesAdvanced Engineering Consultants1405 Dublin Road, Suite 200Columbus, OH 43215Construction ManagerTurner Construction

3. OutreachContractor Participation Goal – 20%Workforce Participation Goal - 6.9% Women, 10% Minority

4. Project OverviewLinden BranchRenovation & Addition to existing branch30,000 sq. ft.Estimated direct construction cost: $13.5MArchitect – Moody NolanCurrent Bidding Window: 12/1/23–12/29/23 Construction start – late February 2024

5. Project OverviewBarnett BranchRenovation & Addition to existing branch22,000 sq. ft.Estimated direct construction cost: $10.2MArchitect – Schooley Caldwell + EvokeCurrent Bidding Window: mid-late March 2024 Construction start – late May 2024

6. Project OverviewMarion Franklin BranchNew Construction 10,300 sq. ft.Estimated direct construction cost: $6.5MArchitect – Schooley Caldwell + EvokeCurrent Bidding Window: April 2024 Construction start – late June 2024

7. Project OverviewCanal Winchester BranchNew Construction 29,000 sq. ft.Estimated direct construction cost: $16MArchitect – Bostwick + WellogyCurrent Bidding Window: late April 2024 Construction start – mid-July 2024

8. Document AvailabilityThrough CML’s Website: https://www.columbuslibrary.org/about/doing-business

9. Bid ManualBid ManualTable of contentsInstructions to BiddersSummary of Work Bid Form Sample Contract Cat 2 Bill of Materials (eRate)Additional Subcontractor RequirementsSafety ProgramDrawings + SpecificationsInformation Letters / Addenda

10. RequirementsBonds – RequiredTaxes – Tax ExemptWages – Prevailing Wage

11. Additional Bid Info + Q&ABidding Schedule: Bids due Tuesday, December 12, 2023 at 12:00 pm All bids must be submitted on the Bid Form furnished with the Contract Documents.All proposals are due via email and/or in-person by noon on 12/12/23. If emailing – the proposals can be sent to: procurement@columbuslibrary.org..Each bidder is required to have an E-Rate Service Provider Identification Number (a SPIN number)Questions during bid period – email Mona Mawalkar at mmawalkar@columbuslibrary.org AND Litany Zenz at lzenz@tcco.com All questions must be submitted by close of business, Monday, December 4, 2023 Scope Reviews will occur on 12/13 & 12/14. If this date doesn’t work, another date will be determined after bids are receivedQuestions?