Tenaris has invested in Romania USD 60 million to build a dedicated line for 31nishing between free 30oating mandrel mill and stretch reducing mill determines homogeneous and The intermediate g ID: 846353

line tenaris tubes 149 tenaris line 149 tubes boiler finishing nishing tons dedicated information 000 tolerances meters pressure furnace

Share:

Link:

Embed:

Download Presentation from below link

Download Pdf The PPT/PDF document "Boiler tubes31nishing line" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

1 Boiler tubesnishing line Tenaris
Boiler tubesnishing line Tenaris has invested in Romania USD 60 million to build a dedicated line for nishing between free oating mandrel mill and stretch reducing mill, determines homogeneous and The intermediat

2 e gas furnaceXxxxxxx ThefurnaceTHE FURNA
e gas furnaceXxxxxxx ThefurnaceTHE FURNACE IN NUMBERS 140 tons of refractories 950 tons of steel 38,000 man hours 30 km of cables 6 weeks of installation, 24 h/day Xxxxxxx Thanks to the improvements of process control and through

3 ultrasonic test Tenaris The finishing l
ultrasonic test Tenaris The finishing linewith a Thefinishing lineTHE FINISHING LINE IN NUMBERS a heat treatment furnace for normalizing & tempering, izothermal annealing, in order to obtain improved a straightening machinemarki

4 ng and packaging 15 months, from green g
ng and packaging 15 months, from green grass to start-up55,000 square meters total surface800 tons of equipment Xxxxxxx With this investment Tenaris is able to offer:• the longest tubes in the world: 26 meters, • the mo

5 st stringent length tolerances: –0/
st stringent length tolerances: –0/+5mm allowing to save costs for pressure • tighter wall thickness and outside diameter tolerances: allowing to reduce the weight of • reduced roughness: decreasing pressure drop i

6 nside the tubes, thus improving the Wide
nside the tubes, thus improving the Wider offer,more benefitsCUSTOMER BENEFITS Better products100% dedicated boiler finishing lineto respond timely to product customization requirementsImproved lead timegiven its geographical pos

7 itioning to serve Fully dedicated teamsp
itioning to serve Fully dedicated teamspecialized in Power generation including For further information www.tenaris.com/Romania The new nishing line for boiler tubes at TenarisSilcotub / January 2019This brochure has been

8 written by Tenaris only for informationa
written by Tenaris only for informational purposes. Every effort was made to ensure the accuracy of the all liability and responsibility for any loss, damage or injury resulting from use of information and data provided in this b