Builtup Area 47042 m 2 17 less material usage Benefits of using Steel Tubes 12 saving in total project cost Particulars PEB using Beams amp Plates PEB using APL Apollo Steel Tubes ID: 926496

steel cost tubes material cost steel material tubes

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Case Study V – G+20 Commerical Buildin..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Case Study V – G+20 Commerical Building

Built-up Area 47042

m

2

17% less material usage

Benefits of using Steel Tubes

12% saving in total project cost

Particulars

PEB – using Beams & PlatesPEB – using APL Apollo Steel Tubes Steel consumption (Ton)35432930Raw Material (Rs/kg)6570Conversion Cost (Rs/kg)1010Transportation (Rs/kg)1.21.5Erection (Rs/kg)5.05.0Total cost (Rs/kg)81.286.5Project Cost (Rs Cr)28.7725.34