1 Implications for the 11T +TCLD relocation at cell 9 (IP7 1 Implications for the 11T +TCLD relocation at cell 9 (IP7

1 Implications for the 11T +TCLD relocation at cell 9 (IP7 - PowerPoint Presentation

faith
faith . @faith
Follow
343 views
Uploaded On 2022-06-20

1 Implications for the 11T +TCLD relocation at cell 9 (IP7 - PPT Presentation

initial thoughts WP15 observations with contributions from WP10 R Garcia Alia WP11 Delio Duarte Ramos Following presentation of C Bahamonde at the 2018 annual meeting Remark The following lines shall NOT be intended as considerations against a possible TCLD and therefore 11T r ID: 921105

tcld 11t barrier cell 11t tcld cell barrier vac edit speaker insert header amp footer apply title slides location

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "1 Implications for the 11T +TCLD relocat..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

1

Implications for the 11T +TCLD relocation at cell 9 (IP7

)

initial thoughts

WP15 observations

with contributions from WP10 (R. Garcia Alia)

WP11 (

Delio

Duarte Ramos )

Following presentation of C. Bahamonde at the 2018 annual meeting

Slide2

Remark

The following lines shall NOT be intended as considerations against a possible TCLD (and therefore 11T) relocation in point 7. They are a list of activities to be carried out.

It is imperative that the TCLD and 11 T system are installed in the most effective point in order to have the best return over this large investment

To edit speaker name go to Insert > Header & Footer and apply to all slides except title page

2

Slide3

11T +TCLD

at

cell 9 (IP7

)  Implications I

Preparatory work and data needed to evaluate change Update

machine models for cells 9L7 and 9R7 to LS2 levels

Perform scans of the

for cells 9L7 and 9R7 (TS3 and if not possible LS2. Point 7 limited access. Already ordered for tomorrow. To see if possible. Cost paid by WP15)Check services in cell 9 (cable trays, supports, derivation boxes… etc) and add to the 3D modelNeed of new dose (to electronics) level graphics in the DS after LS2 (profile may significantly change with new position, R. Alia private communications) Identification of racks installed underneath the cryostats in the zone and their related radiation hardnessConfirmation from WP11 and WP9 that the He release valves are unchanged (or new scheme) in number and positions Analysis to be performed againRelocation of racks because of the above mentioned radiationIdentification of cabling work in the areaBLM location/number/relocationsPossible needed re-routing of the nQPS cablesRe-simulate TCLD installation in the new position. Change of position lead to change of possible interference to be managed or dismantled from the tunnel in order to allow installation If He release valves change of positon and number → impact on access area and maintenance area of the TCLD, impact on the 11T cryostat and impact on the survey line of sight

To edit speaker name go to Insert > Header & Footer and apply to all slides except title page

3

Slide4

11T +TCLD

at

cell 9 (IP7

)  Implications II

Evident consequences

Distance increased from «11T area» to RR caverns  quench detection system cabling, current leads cables…

Distance increased from «11T area» to TZ76 gallery  TCLD cabling : BPM , motorization control system

TYCHL05)+ 20m (if MB.A9R7)+ 40m (if MB.B9R7)New location for electrical boxes for baking out purposesNew location connection on LHC water pipes (for TCLD water cooling)Documentation Update layout drawings (x2) : LHCLSSH_0013 and LHCLSSH_0014 Update differential layout drawings (x2) : LHCLJ_7U0079 and LHCLJ_7U0080 → no approval ECR until ready at least 3-4 months before we are there Update Integration Reports: 11T full assembly (EDMS 1904620) and TCLD collimator (EDMS 1903950)

To edit speaker name go to Insert > Header & Footer and apply to all slides except title page

4

Slide5

11T +TCLD at

cell 9 (IP7

)

 ImplicationsTo edit speaker name go to Insert > Header & Footer and apply to all slides except title page

5

RR77 exit

R7

+23m

+38m

MB.A9R7

MB.B9R7

11T

(

replacing

MB.B8R7)

Cell

9

Cell

8

Slide6

11T

+TCLD

at

cell 9 (IP7)  Implications

To edit speaker name go to Insert > Header & Footer and apply to all slides except title page

6

Present

BLMs at cell 9R7MB.A9R7MB.B9R7

BLMTI (TCLD)

BLMBI (MB11T)

BLMBI (MB11T)

BLMBI (MB11T)

In the

present

integration

: 4 new

BLMs

per IP

side

,

1 for TCLD and 3 for 11T

magnets

Slide7

Q11

LEP

LEN

LEP

MB

MB

Q10

MB

MB

Q9

MB

MB

Q8

MB

MB

Q7

Q7

MB

MB

Q8

MB

MB

Q9

MB

MB

Q10

MB

MB

LEP

LEN

LEP

Q11

DN200 spring loaded

4

1

1

2

1

2

1

2

1

2

1

2

1

2

1

1

1

4

DN200 non-spring loaded

1

1

1

1

DN90

1

1

1

1

Vac. barrier

Vac. barrier

Vac. barrier

Vac. barrier

Flow Restr.

Flow Restr.

Q11

LE

MB

MB

Q10

MB

MB

Q9

MB

MBH

LENMBHQ8MBMBQ7Q7MBMBQ8MBHLENMBHMBQ9MBMBQ10MBMBLEQ11DN200 spring loaded111212121211121111DN200 non-spring loaded1111DN901111

Vac. barrier

Vac. barrier

Vac. barrier

Vac. barrier

Flow Restr.

Flow Restr.

Present LHC Dispersion SuppressorCERN/ATS/Note/2010/057 (TECH)2010-12-01

LHC IR2 Dispersion Suppressor after LS2

LHC IR7 Dispersion Suppressor after LS2

Changes in the insulation vacuum protection scheme with WP11 cryostats installed Option of 11T in cell A9 (to be confirmed by TE/CRG)

2018-10-24

Delio

Duarte Ramos

Slide8

Process recall

The integration of the 11T and TCLD was approved in the integration meeting number 90 of the 3/11/2017

It was approved by the ICL on the 6/12/2017

In order to be

effective, WP15 had asked to the TCC to officially confirm the position of the 11T (request September 2017). This was confirmed on the

7/12/2017. TCC

endorsed this location

given the information available at that time and it stated that the location should be revisited if new information on the quench margin would become availableThe IRIA [Integration Report Installation Approval] was released in version 1.0 20/03/2018The version 1.1 with the differential lay-out was released 10/09/2018. It was the final version for installation In someway we should re-think how ECR process and technical advancement could re-brought on line in order to minimize work repetitionTo edit speaker name go to Insert > Header & Footer and apply to all slides except title page8