CONVENTIONAL FACILITIES AND SITING GROUP DESY ReBaseline Meeting Preparation V Kuchler J Osborne A Enomoto 2 CFS Proposed PointsofContact Electron Source Axel Brachman amp John Sheppard ID: 915345
Download Presentation The PPT/PDF document "1 ILC GLOBAL SYSTEMS MEETING" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
1
ILC GLOBAL SYSTEMS MEETING
CONVENTIONAL FACILITIES
AND SITING GROUP
DESY
Re-Baseline Meeting Preparation
V. Kuchler, J. Osborne, A. Enomoto
Slide22
CFS Proposed Points-of-Contact
Electron Source
Axel
Brachman
& John Sheppard
-
Tom Lackowski (supported by M+W Zander)
Positron Source
Jim Clarke
-
John Osborne
Damping Ring
Susanna Guiducci
-
Tom
Lackowski supported by M+W Zander)
Ring to Main Linac
Nikolay Solyak
-
Vic Kuchler (supported by M+W Zander)
Main Linac
Chris Adolphsen (Klystron Cluster) -
Tom Lackowski
Shigeki Fukuda (DRFS)
-
Atsushi Enomoto
Beam Delivery System
Andrei Seryi
-
John Osborne
Slide33
CFS Video Webex Meeting
Schedule
The Following CFS Video/Webex Meeting and
Topics
have
been
Set Up with Area System
Points-of-Contact
June 2 - CFS Internal Review of AD&I Meeting
June 9 - CFS and Damping Ring w/S. Guiducci
June 16 - No CFS Meeting Due to Travel
June 23 - No CFS Meeting Due to Travel
June 30 - CFS and Electron Source w/ A.
Brachman
July 7 - CFS and Positron Source w/J.
Clarke and
N. Collomb
July 14 - CFS and RTML w/N.
Solyak
Slide44
Initial CFS Efforts
Americas Team will Develop a Revised WBS Costing Spreadsheet for the Analysis of Identified Alternatives
The Spreadsheet will have Separate Columns for Each of the Three Regional Costs
Criteria for the Electron Source, Positron Source,
D
amping Ring and RTML will be Verified First with 2D and Then 3D Drawings to Follow
Initial Analysis of Cost Estimates for Alternative Configurations will then be Developed
CFS will Arrange a Meeting At SLAC in Late
July to Develop
the Combined Criteria for the New Arrangement of the Central Region w/E. Paterson
M+W Zander and
H
anson Proposals for AD&I Work are Being Developed and are Forthcoming