Planning Commission Workshop March 22 2016 Jennifer Campos Senior Planner Evergreen Corridor Management Plan Roadway Maintenance P athway I mprovements Presentation Overview Evergreen Highway Corridor ID: 645207

corridor evergreen update highway evergreen corridor highway update road city 100th asphalt ellsworth pathway plan design roadway cost complete

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Evergreen Highway Corridor Update" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Evergreen Highway

Corridor Update

Planning Commission Workshop

March

22,

2016

Jennifer Campos,

Senior PlannerSlide2

Evergreen Corridor Management Plan

Roadway Maintenance

P

athway

I

mprovements

Presentation Overview

Evergreen Highway Corridor

Update

-

2Slide3

Project context

Evergreen Highway Corridor

Update

- 3Slide4

Project purpose

Evergreen Highway Corridor Update

- 4

The purpose of the Evergreen Corridor Management Plan (CMP) is to provide

guidance, direction and documentation

for future decisions and actions

along

SE

Evergreen

HighwaySlide5

Scope

Evergreen Highway Corridor Update-

5

Traffic volumes

and speeds

Local and regional access

Roadway surface and maintenance

Pathway

design

Roadway

standards

Stormwater

requirements

Historic

and scenic significance

Street lighting and utilitiesSlide6

Process and inputs

Evergreen Highway Corridor

Update- 6

Evergreen Highway CMPSlide7

Concept-level designs

Recommended changes to city code and road design standards

F

unding and implementation strategies

Final plan

presented to City Council for adoption

Outcomes

Evergreen Highway Corridor

Update-

7Slide8

Project Timeline

Evergreen Highway Corridor Update-

8

MARCH

APRIL

MAY

JUNE

JULY

Develop draft plan

P

lan adoption

AUGUST

Open House

Internal draft review

Public draft review

Open House

Finalize planSlide9

Community Outreach

Evergreen Highway Corridor Update

- 9

Presentations at two neighborhood association meetings (100+ participants)

Online community survey (321 respondents)

Eight small group meetings (61 participants)

Ongoing email and website updates

Next step:

O

pen house on April 16Slide10

Community

Outreach Findings

Evergreen Highway Corridor Update- 10

Safety for all users (motorists, people walking, people cycling) is a top priority

Focus on a short-term solution for the roadway surface condition

Completion of the pathway is more important than extra amenities (such as lighting, historic markers, or undergrounding utilities)Slide11

Current Road Conditions and Status

The City has 1,810 lane miles of streets

185

total lane miles are “failed”

Rated as a Pavement Condition Index (PCI) from 0-100*

“Failed” is a PCI < 40 for

arterials

Average PCI of Evergreen Highway

Chelsea to SE 164

th

Ave. = 34

SE 164

th

Ave to City Limits =

46

*

PCI does not measure ride quality

Evergreen Highway Corridor Update-

11Slide12

Current Road Conditions and Status

Thin asphalt repairs

Pothole repairs

Milling of thin asphalt

Test treatment

Enhanced cape seal

Evergreen Highway Corridor Update-

12Slide13

2016 Pavement Work

Continued milling of asphalt

Asphalt repairs

Concrete grinding (new)

Enhanced cape seal

Re-striping and reflective markers

Evergreen Highway Corridor Update-

13Slide14

Treatment Options and Cost

Complete

Reconstruction

Current Regulations

$515 /SY

2017 Regulations

$355 /SY

Evergreen Highway Corridor Update-

14Slide15

Treatment Options and Cost

Reconstruction of Roadway

Estimated total cost: $27.0M - $39.5M

Includes entire corridor from Chelsea to City limits (192

nd

Ave)

Cost is for replacement with asphalt

Assumes that road width remains the same

Phased construction

Pathway built as a separate project

Evergreen Highway Corridor Update-

15Slide16

Treatment Options and Cost

Develop a detailed pavement rehabilitation plan for the corridor

Interim measures to improve ride quality

Continue enhanced cape seal along corridor

Areas of asphalt overlay

Concrete slab repairs

Evergreen Highway Corridor Update-

16Slide17

Update on pathway improvements

Evergreen Highway Corridor Update -

17Evergreen Highway

Pathway SegmentsSlide18

Update on pathway improvements

Evergreen Highway Corridor Update-

18Segment

Begins/EndsLength

Status

Funding Gap

A

Chelsea to Image

1.1

Design in

progress.

$1,275,000

B

Image to 100th

0.4

Design

75% complete

$900,000

C

100th to Ellsworth

0.4

Complete (2015)

--

D

Ellsworth to Columbia Springs

0.7

Complete (2001)

--

E

Columbia Springs to 164th

2.3

Community fundraising effort enabled preliminary design work

to be completed by

BergerABAM

To be determined

F

164th to City Limits

1.8

Conceptual design

complete as part of overall east segment study

$3,000,000+

Row height = relative length of segmentSlide19

Evergreen Highway Corridor

Update- 19

SE 100th Court to SE Ellsworth Road

Pervious ConcreteSlide20

Evergreen Highway Corridor

Update- 20

SE 100th Court to SE Ellsworth Road

Walls and Pervious ConcreteSlide21

Evergreen Highway Corridor

Update- 21

SE 100th Court to SE Ellsworth Road

Pervious PaversSlide22

Questions and Discussion

Jennifer Campos, Senior Planner, City of Vancouver

jennifer.campos@cityofvancouver.us

(360)

487-7728

www.cityofvancouver.us/

evergreenSlide23

Evergreen Highway Corridor

Update- 23

Evergreen Trail – 100th Ct. to Ellsworth