/
DOM integration meeting Daan van Eijk DOM integration meeting Daan van Eijk

DOM integration meeting Daan van Eijk - PowerPoint Presentation

greyergy
greyergy . @greyergy
Follow
342 views
Uploaded On 2020-08-06

DOM integration meeting Daan van Eijk - PPT Presentation

1 October 2015 Introduction My apologies for the late notice for this meeting Ill be on holidays next week October 411 Urgent matters Marco The week after is the week of the Collaboration Meeting ID: 800096

integration dom naples doms dom integration doms naples test catania fiber type nikhef testing meeting waiting mark proposal components

Share:

Link:

Embed:

Download Presentation from below link

Download The PPT/PDF document "DOM integration meeting Daan van Eijk" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

DOM integration meeting

Daan van Eijk

1

October 2015

Slide2

Introduction

My apologies for the late notice for this meeting

I’ll be on holidays next week (October 4-11)Urgent matters: Marco

The week after is the week of the Collaboration MeetingI hope to see many of you!

2

Slide3

Issues from previous meeting

Default fiber to splice on PAVE penetrator: the black one

Proposal to mark the spliced fiber outside of the DOMThe mark can be positioned very close to the exit of the fiber protection

tube. That position is the less handled during the BEOC mounting so we can assume the mark will not fade out with handling.

If default (black): with Tipp-Ex

If white: with pen/ink

DOM integration procedure:

Irene didn’t have time to work on it as she’s working on the base container

DOM integration review:

Date?Help needed?

3

Slide4

DOM Integration Status: DU-2

DOM production for DU-2:

18 DOMs finished in Amsterdam (CH56C down to CH22C)

All DOMs connected to DU-2 VEOC!3 DOMs ready for acceptance test in Naples (CH32C down to CH28C)

I hope to hear from Daniele about the status of their test setup

3 DOMs finished in Catania (CH26C down to CH22C

)

4

Slide5

DU-3 and onwards

Amsterdam: type B (CH55H-CH21H)12 DOMs on assembly

benches in Amsterdam Filled PMT structures are ready for at least 10 more DOMs

Erlangen: type B (CH55H-CH21H)

Catania: type C

(

CH55C-CH21C)Naples: type D

(

CH54H

-CH20H)These DOMs are (pre-)registered in the DB. The UPI’s have been distributed to you.

5

Slide6

DOM components

DOM integration goal

18 DOMs to be built at each integration site (Catania, Naples, Erlangen) before the end of the year

DOM component situation improved since last meeting64 PAVE penetrators arrived at Nikhef

Testing will start as soon as possible

20 new fiber trays have arrived

Re-design including a holder for the A/D filter QR code

A

vailability of DOM components remains a problem

(Except for Nikhef)I prepared a shipment for Naples:

All components needed to complete 18 DOMsExcept PMT’s, penetrators (coming soon after testing) and grounding cables

The boxes will be included in shipment of DU-2 to Naples

I will prepare similar shipments for Catania and Erlangen soon

6

Slide7

Current issues

ELOG usage:

Every individual DOM is now defined as “Type”This makes it easy to collect all information about one particular DOM

We started using the elog as placeholder for functionality and acceptance test sheets

P

lease do the same for your DOM tests!

Please have a look and

use

the

elog!CLB/AHRS statistics at Nikhef:Waiting for more news/info from GiorgioAt next Steering Committee?

Firmware and embedded software versions to be flashed on CLB’sFor now: use latest revision as advertised on

http://wiki.km3net.de/index.php/Electronics/

CLB_firmware_versions

Waiting for more news/info from Giorgio/

Tommaso

/Diego

At next Steering Committee.

7

Slide8

Current issues

DOM testing

Waiting for a calibration procedure for the AHRSOnly when this is defined, we can start measuring meaningful values to be filled out on the acceptance test sheet

Waiting for input from Calibration GroupPMT threshold

In ALL setups (i.e.

DarkBox

, Green Box, Blue Box, anything!) the PMT threshold should be set to “2F”, translating in 1113 mV

That’s the value at which the PMTs were calibrated in the

DarkBox

Analysis software: We need to define a standard, which can then be centrally distributed

Ideas?Dark storage of DOMs before testing

Proposal for integration sites without dark room to store DOMs in light-tight bags

Suggestions?

8

Slide9

DOM test results

9

DOM

Accepted

PROMiS

ID

Pressure

I

Boot

time

FPGA T

WR

T

Humidity

Piezo

noise

Piezo

line

# PMTs

[N] DC

#PMTS

[N]

ToT

40

N

N

N

NN/AN/A152941NNN181242NNNN/AN/A43NNN92626NNN/AN/A12227NN/A32528NN52929NNNNN/AN/A101430NN1531NN62632NNN62733NNN/ANN464NNNN152935NNNN82837NNN132663NN31339N62938N32465NNN52666N41770NN2471NN3572NN219

Notes:Catania DOMsUnderlined: DOM31 and DOM38 have new PMT structure: improvement in dark count?New HV caps: no effect observable in DC’sNo compass calibrations performed on any DOM (no procedure defined, excluded from this table)

Slide10

Collaboration meeting

There is a DOM integration time slot of half an hourWho will be there from the DOM integration leaders?

Can I ask you to present the status (max. 6 minutes each)?

For the people who are not present: will you present remotely or find someone else to replace you?Emanuele asked to have a tour around the Nikhef DOM integration site

A very good opportunity to exchange experience!

Invite all DOM integration team leaders + others interested

Proposal

: Tuesday 13/10, 14:00 – 16:00

10

Slide11

BACKUP

11

Slide12

DB: Red-tagging

12