SDD 15Design NotesThese details are applicable only when there is a signed and markedbike lane or when a 5146 or wider paved shoulder providefor bicycle accommodations Refer to the Wisconsin Bicycle F ID: 867207
Download Pdf The PPT/PDF document "Stop Line and Crosswalk Pavement Marking..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
1 SDD 15 Stop Line and Crosswalk Pavement
SDD 15 Stop Line and Crosswalk Pavement Marking is required. Design Notes:These details are applicable only when there is a signed and markedbike
2 lane or when a 5 or wider paved sh
lane or when a 5 or wider paved shoulder providefor bicycle accommodations. Refer to the Wisconsin Bicycle Facility Design Handbook, Chapter
3 STSPNUMBERTITLE NONE In addition to tho
STSPNUMBERTITLE NONE In addition to those listed on SDD158 sheets "a" and "b", SDD 15and sheet "e" of this SDD:Bid items associated with this draw
4 ing if permanent signing is to be includ
ing if permanent signing is to be included in the contract: VersionStandard Detail Drawing (sheet a)May 2020 Bicycle Lane Marking References:FDM 11