Download Presentation The PPT/PDF document "Case Study VI – G+14 Office" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
Case Study
VI
–
G+14 Office
Building
Built-up Area 13800 m2
15% less material usage
Benefits of using Steel Tubes
8% saving in total project cost
ParticularsPEB – using Beams & PlatesPEB – using APL Apollo Steel Tubes Steel consumption (Ton)853739Raw Material (Rs/kg)6570Conversion Cost (Rs/kg)1010Transportation (Rs/kg)1.21.5Erection (Rs/kg)5.05.0Total cost (Rs/kg)81.286.5Project Cost (Rs Cr)6.926.39
Composite Design used, Concrete quantity are not included in Case study
Decking sheet quantity not considered in above BOQ