/
UC3: Complications Related to Unscheduled performed instead UC3: Complications Related to Unscheduled performed instead

UC3: Complications Related to Unscheduled performed instead - PowerPoint Presentation

karlyn-bohler
karlyn-bohler . @karlyn-bohler
Follow
396 views
Uploaded On 2016-08-06

UC3: Complications Related to Unscheduled performed instead - PPT Presentation

Raw visit number VISITNUM LBDY LBDTC 2 missing 99 17 20140317 3 3 28 20140328 VISIT VISITNUM SVDY SVDTC SVUPDES Week 1 2 14 20140314   Week 1 Unscheduled 17 20140317 ID: 434480

unscheduled performed scheduled visit performed unscheduled visit scheduled day measurement visits planned result results lab

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "UC3: Complications Related to Unschedule..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

UC3: Complications Related to Unscheduled performed instead scheduled (TK)

Raw visit numberVISITNUMLBDYLBDTC2missing99172014-03-1733282014-03-28

VISITVISITNUMSVDYSVDTCSVUPDESWeek 12142014-03-14 Week 1 Unscheduled172014-03-17Lab TestWeek 23282014-03-28 

LB

SV

Planned lab measurement not performed at day 14, Instead of this measurement on day 17 is performed

Is it still unscheduled visit?Slide2

UC3: Complications Related to Unscheduled performed instead scheduled (TK) option 1

Raw visit numberVISITNUMLBDYLBDTC2missing2172014-03-1733282014-03-28

VISITVISITNUMSVDYSVDTCSVUPDESWeek 12142014-03-14 Week 1 Unscheduled172014-03-17Lab TestWeek 23282014-03-28 

LB

SV

Planned lab measurement not performed at day 14, Instead of this measurement on day 17 is performed

Is it still unscheduled visit?Slide3

UC3: Complications Related to Unscheduled performed instead scheduled (TK) option 2

Raw visit numberVISITNUMLBDYLBDTC2missing2.1172014-03-1733282014-03-28

VISITVISITNUMSVDYSVDTCSVUPDESWeek 12142014-03-14 Week 1 Unscheduled2.1172014-03-17Lab TestWeek 23282014-03-28 

LB

SV

Planned lab measurement not performed at day 14, Instead of this measurement on day 17 is performed

Is it still unscheduled visit?Slide4

Why do we need the result for uscheduled instead of result for scheduled

To use results for analysis as results for scheduled visits (e.g. In summary statistics) => decision and derivation of stats >ADAMTo use results as Baseline (e.g. Set up of Baseline flag) => Company decision >SDTM IGSlide5

UC2 Pros & Cons

ProsConsArguments as scheduled visitsno lost informationCould overlap with the next visitDifficulty in creation of SV domainSDTM programming and mapping more challenging (e.g. need to include additional result identifier)Potential issue with Open CDISCArguments as unscheduled visitsSV is cleanerdata traceabilityMultiple unscheduled visits possible, including SVDTC populated with the same dateChallenges in further analysis