12Q1 to 12Q2 Tim How Many amp What Design Why build staves We havent built many recently corrugated Need to develop stave cores designed for 130nm ASICs small bore CP2 tube ID: 249857

building stave mid programe stave building programe mid foam 2012 2011 staves material pre 130nm piece corrugated 600mm

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Stave Building Programme" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Stave Building Programme(12/Q1 to 12/Q2)

(Tim)Slide2

How Many & What Design ?

Why build staves ?

We haven’t built many recently (corrugated ?)

Need to develop stave cores designed for 130nm ASICs (small bore CP2 tube + Allcomp foam)Need to check out new toolingNeed staves for sector prototypeNeed to verify if improvements in co-curing an be translated to stavesNeed to do more prototyping to decide on final stave core (i.e. honeycomb / foam / custom corrugations) How Many4-6 ?

10/12/2011

2

Stave Building Programe to mid 2012Slide3

Suggestions

What to keep constant

Use our ‘best’ (i.e. newest) pre-

pregs K13C2U/EX-1515 at 45 and 100 gsmCo-cured face sheetsTitanium tubesKeep woven ‘C’-channels1.2m length x 12 off

End close-outs (peek)6 sets

What to vary

Fibre

gsm

Tube diameter

Stave 250 will require (at least) 1/8”130nm will most likely allow 2.275mmThermal interface foamPocofoamAllcomp foamCore material (from)3/8” CF honeycomb3/16” N636 (replacement for Korex)CorrugationsCarbon foam

10/12/2011

3

Stave Building Programe to mid 2012Slide4

Outline Plan

10/12/2011

4

Stave Building Programe to mid 2012Slide5

Material needed for new staves

Here is the list of the materials we need for 4 Staves (from Paul

Rossiter

): Pre-preg: we have enough material to make 4 planksTapes: 8 offCooling pipe: 4 offC channels: 10 off at 1.2m long or 20 off @ 60cm longPoco foam: 1 piece 52mm x 90mm x 300mmHoneycomb: 1 piece 600mm x 900mm

Corrugated CF (if to be used): 30 off 50mm x 600mm

10/12/2011

5

Stave Building Programe to mid 2012