IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO ENMME EDMS 1486468 BRIFFAUD On behalf of ENMME design team LIUPLI Meeting 25022015 LIU PSB BTBHZ10 amp BTMBHZ10 ID: 920022
Download Presentation The PPT/PDF document "POTENTIAL EN-MME DESIGN JOBS" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
POTENTIAL EN-MME DESIGN JOBSIDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MMEEDMS 1486468
B.RIFFAUDOn behalf of EN-MME design teamLIU-PLI Meeting – 25/02/2015
Slide2LIU - PSBBT-BHZ10 & BTM-BHZ10Owner : J.Hansen.Request : Design of new Y and V chambers.
Design kick-off : 2rd quarter 2015.Estimated MME resources : to be defined.BR-16L1 (kicker)
Owner
:
J.Hansen.Request : Design of a new chamber.Design kick-off : 2rd quarter 2015.Estimated MME resources : to be defined.
LIU-PLI Meeting – 25/02/2015
2
Slide3LIU - PSBMP42 (bumper) & SMH42 (septum)Owner : M.Hourican.Request : Design of a new bumper/septum system + vacuum device.
Design kick-off : 3rd quarter 2015.Estimated MME resources : 2015 (1 FTE), 2016 (0.5 FTE).MSIV (septum)
Owner
: M.Hourican
.Request : Design of a new MSIV magnet.Design kick-off : 3rd quarter 2015.Estimated MME resources : to be defined.
LIU-PLI Meeting – 25/02/2015
3
Slide4LIU - SPSZSOwner : B.Balhan.Request : Beam losses at high energy level (electron cloud and electrical issues).
Improvement of pumping system, impedance reduction, improvement of ion trap connections, short-circuiting of anodes.Design kick-off :
Inter-tank definition : 1
st
/2nd quarters 2015.BI integration : 3rd quarter 2015.ZS4 preliminary design : 2nd quarter 2015.Estimated MME
resources : to be defined.
LIU-PLI Meeting – 25/02/2015
4
Slide5LIU - SPSTPSG4 & TPSG6Owner : B.Balhan.Request : Replacement of TPSG4 & 6 by more robust versions for MSE protection (increase of length, similar version as TCDQ for TPSG6).
Design kick-off : to be defined.Estimated MME resources : 2015 (0.5 FTE / TPSG4, 0.5 FTE / TPSG6)TPST
Owner : B.Balhan.
Request :
to be clarified.Design kick-off : not before 2017.Estimated MME resources : to be defined.LIU-PLI Meeting – 25/02/2015
5
Slide6LIU - SPSTIDVG (new core)Owner : O.Aberle.Request : Replacement of present TIDVG core with improved version (robust enough for present and future LHC beams).
Design kick-off : 2nd quarter 2015Estimated MME resources : to be defined.
Vacuum sectorization LSS1
Owner
: P.Chiggiato.Request : Addition of sector valves around TIDVG and MKP/D in order to reduce personnel dose, to protect sensitive equipment and to reduce pump-down time. Design kick-off : to be defined.
Estimated MME resources : to be defined.
LIU-PLI Meeting – 25/02/2015
6
Slide7LIU - SPS200 MHz power upgradeOwner : E.Montesinos.Request : Design of supports (to be confirmed).
Design kick-off : to be defined.Estimated MME resources : to be defined.
SPS and TI2/TI8 protection devices
Owner
: R.Losito.Request : Replacement or extension of present TCDI system, with more robust collimators and improved protection. Displacement upstream in TI2/8 in order to reduce losses in LHC injection region.Design
kick-off : to be defined.Estimated
MME resources : to be defined.
LIU-PLI Meeting – 25/02/2015
7
Slide8LIU - SPSNew external High Energy DumpOwner : B.Goddard, R.Losito.Request : New dump block based on TED design in existing
beam line, using existing extraction and new switching magnets (objective : dumping of high intensity LHC beam during setup).Design kick-off : to be defined.
Estimated
MME resources :
to be defined.LIU-PLI Meeting – 25/02/20158
Slide9LIU - SPS50ns (100ns ?) rise time kickers for ionsOwner : B.Goddard, J.Uythoven, T.Kramer,, R.Folch, B.Holzer, J.Hansen, M.Hourican.Request : Addition of new
kicker MKP (PFL in parallel to PFN), thin in-vacuum septum MSIV, dump, beam instrumentation and vacuum devices in order to allow injection of ions with 50ns rise time.
Design kick-off : to be defined.
Estimated MME
resources : to be defined.LIU-PLI Meeting – 25/02/20159
Slide10LIU - IonsLINAC3 Oven test standOwner : D.Kuchler.Request : Increase knowledge on oven behaviour.
Design kick-off : to be defined.Estimated MME resources : to be defined.
LINAC3 LBS
Owner
: ?Request : Energy measurement of LINAC3 beam : new spectrometer line after BHZ20 (modification or new spectrometer).Design kick-off : to be defined.
Estimated MME resources :
to be defined.
LIU-PLI Meeting – 25/02/2015
10
Slide11LIU - IonsLINAC3 LEBTOwner : J.Bellodi.Request : Increase intensity in
LINAC3/LEAR : Rematch optic in Low Energy Beam Transport. Design of new magnets to be confirmed.Design kick-off : to be defined.
Estimated MME
resources :
to be defined.LINAC3 Source test stand (to be approved)Owner : D.KuchlerRequest : New spare source. Source test stand for validation, tuning and Training
.Design kick-off :
to be defined.Estimated MME resources
:
to be defined.
LIU-PLI Meeting – 25/02/2015
11
Slide12LIU - IonsLEIR Beam StopperOwner : I.V.Leitao.Request : New
Dump and Y vacuum chamber.Design kick-off : 3rd quarter 2015.
Estimated MME
resources : 0.3 FTE (0.1 for dump, 0.2 for chamber).
LIU-PLI Meeting – 25/02/201512
Slide13ConclusionNo official requests were sent to EN-MME for
these jobs.0.3 FTE are already booked in EN-MME provisional planning (first half 2015) for
PSB-BT-BHZ10, various
BE-BI jobs
& various LIU jobs. 2.3 FTE are planned in 2015 (second half) and 0.5 FTE are planned in 2016 for BPM42/SMH42/TPSG4/TPSG6 and LEIR Beam Stopper, but resources are not included in EN-MME provisional planning yet.Since EN-MME provisional planning is almost full for 1st
and 2nd quarters 2015 (main activity for HL-LHC, AD/ELENA & LIU projects),
it is really important to anticipate your request to EN-MME in order to get the best service possible in 2015.
Request =
Detailed Specification
+
Deadlines
.
LIU-PLI Meeting – 25/02/2015
13
Slide14Thank you for your attention