Download Presentation The PPT/PDF document "ACEC Annual Meeting" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
ACEC Annual Meeting
Bellevue,
WA
June 11, 2015
Lynn PetersonSecretary of Transportation
Moving Washington Forward
WSDOT
Linea Laird,
PE
Chief
EngineerSlide2
WSDOT / Consultant Delivery
Nickle and TPA366 /421projects , 87% on time and 91% on budgetBaseline = $6.167 B, Current = $6.049, 1.9% under budget
Private sector helped with over 50% of the delivery efforts. 338 Open Agreements163 Different Prime Consultants332 Agreements totally $155 Million Authorized, $500 M on-callGEC Agreements for $748 Million,
Avg 50% of work to sub-consultants 2Slide3
New Revenue Project Delivery Business Practices
Design BuildStrongly encouraged to use Design Build procedures for Public Works projects over ten millionJTC convenes design-build contracting review panel to examine WSDOT’s design build contracting.
Construction Business PlanSustainable StaffingStrong OwnerTeam (WSDOT, AGC, Local 17, ACEC)Practical Design Legislative Oversight
Community EngagementPotential Budget ProvisoWSDOT Interim Staffing 3Slide4
4
Source: WSDOT Capital Program Development and Management
11-3-2014_sr
2015 agency proposed budget highway construction programProgram expenditures and workforce projection* 2015–2017 and beyond: Maximum workforce will be maintained at or below 2,000 FTE’s (Engineering & Technical Core Competency Level), dependent on work load.1866 May 2015Slide5
WSDOT Business
DBE Update Least Cost Planning & Practical DesignTraining Value based
Community EngagementOperation FocusIntegration of Modes Succession Planning
New Recruitments ( Deputy Secretary, RA’s, DBELO)Director Transition PlansTraining5Slide6
Thank you & Questions?
For more information contact:
Linea Laird,
P.E.Chief EngineerWSDOT360-705-7032lairdl@wsdot.wa.govSlide7
Back-pocket Slides
:Slide8
* Based on 2014 Legislative Project ListSlide9
9
Highway preservation investment levels expected to drop significantlySlide10
10Slide11
11
Transportation budget is large, but most of the budget is already committedSlide12
12Slide13
13
3,233 Structures-Avg. Age = 45 yrs.
75+ yrs. old = 310 bridges
50+ yrs. old = 1,339 bridgesSlide14
14Slide15
Structurally-Deficient Bridges
15