/
Maintenance management Maintenance management

Maintenance management - PowerPoint Presentation

myesha-ticknor
myesha-ticknor . @myesha-ticknor
Follow
513 views
Uploaded On 2016-11-16

Maintenance management - PPT Presentation

Maintenance Management Loop FMEAFMECA Failure Mode Criticality and Effects Analysis A Failure Mode and Effects Analysis is often the first step in a systems reliability study It involves reviewing as many components assemblies and subsystems as possible to identify possible failure modes a ID: 489554

failure maintenance work analysis maintenance failure analysis work database management inspection failures system tasks effects mode cmms grouping information

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Maintenance management" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Maintenance managementSlide2

Maintenance Management LoopSlide3

FMEA/FMECA

Failure Mode, (Criticality) and Effects Analysis

A Failure Mode and Effects Analysis is often the first step in a systems reliability study

It involves reviewing as many components, assemblies and subsystems as possible to identify possible failure modes and the causes and effects of such failuresFor each component, the failure modes and their resulting effects on the rest of the system are written onto a specific FMCEA form FMECA is an important element of RCMSlide4

Maintenance and inspection types and intervals

The main objective of this step is to determine the type and frequencies of maintenance and inspection tasks

In principle each failure mode/failure cause in the FMECA should be combated by a maintenance task

The RCM logic of an RCM analysis will be a starting point for identifying relevant maintenance tasksTo determine optimal frequencies of maintenance tasks it is usually required to establish a cost model to optimizeSlide5

Grouping of maintenance and inspection work

When the maintenance tasks are identified, and frequencies set it will usually be natural to group these activities into maintenance packages, each package describing what to do, and when to do it

It is a challenge to establish such an optimal grouping strategy

Why groupingSave “set-up” costConvenienceSlide6

Maintenance and inspection plan

A maintenance program shall be established, which includes written procedures for maintaining, testing, and repairing the various components

Such a program is often implemented by a computerized maintenance management system (CMMS)

A main task of the CMMS is to manage all work orders for preventive maintenance Slide7

Failures need corrective maintenance

Failures represent technical component failures (e.g. rail breakage, defect breaks etc), and deviations (e.g. geometrical deviations of the track)

Failures and deviations require repair, overhaul etc

Typically a work order for corrective maintenance (CM) is issuedThe CMMS will also manage these work orders Slide8

Reporting of result from maintenance and inspection

All maintenance work (functional testing, preventive maintenance, and corrective maintenance) shall be reported into an electronic maintenance database

The information to report depends on the type of maintenance work

Important information to reportExact description of failed/maintained unitFailure mode (CM)Component state (PM)

Failure cause (CM)Effect of failure (CM)Direct cost of maintenance actionSlide9

Database

The database used in the maintenance management loop is a conceptual term

A RAMS database may be realized as a part of the CMMS

It is essential that the database system contains necessary information for a proper data analysis Slide10

Data analysis and improvement analysis

A proper failure cause analysis (FCA), or root cause analysis (RCA)

Investigation into the failure reports to identify common cause problems (CCF)

Updated reliability data that was used in quantitative risk analyses/maintenance optimization modelsVerification of assumption related to safety critical functions/safety barriersSlide11

Restrictions

When maintenance comes out of control (large backlog) it is important to initiate operational restrictions

Closing a railway line

Reducing speedStop productionUse of compensating measuresRestrictions will also be necessary when the system integrity is threatened by weather conditions such as rain, frost, snow, high temperature etc. Slide12

Exercise

What is meant by “the maintenance management loop is NOT closed”