INDUSA Infrastructure updates Annual Update for 20142015 Budget Proposal 20152016 PRESENT BUILDING BEFORE THE PROJECT 20132014 INDUSA Fund Utilization Approved Rs 1210000 Individual donations for the project ID: 463858

indusa classroom 000 construction classroom indusa construction 000 hall room kitchen proper floor cost 2015 2016 1000 book proposal

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Vigyan Ashram (VA)" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Vigyan Ashram (VA)

INDUSA Infrastructure updates

Annual Update for 2014-2015

Budget Proposal 2015-2016Slide2

PRESENT BUILDING

BEFORE THE PROJECTSlide3

2013-2014 INDUSA Fund Utilization

Approved

Rs. 12,10,000

Individual donations for the project

Rs

. 19,30,355

Completed kitchen construction expenses

Rs

. 20,48,502Remaining kitchen workRs. 8,93,250

2013-2014USD 11,000 for computer practical training instituteUSD 10,000 for OER generation2013-2014USD 20,000 for kitchen construction

INDUSA Fund HistorySlide4

2013-2014 INDUSA Fund Utilization

Sr No

Head

Fund/ Donation

Expences

Balances

1

Asha/ Indusa

1210000

 

 

2

Loksatta Donation

1930355

 

 

3

Kitchen Construction

 

2048502

 

 

 

 

 

 

 

 

3140355

2048502

1091853

 

 

 

 

 

 

 

 

 

 

Sub-head wise details *

1

Kitchen meason labour charges ( Suresh Jadhav/Narsing )

294115

 

 

2

Kitchen Furniture

104125

 

3

Kitchen Construction Material Cost

1348101

 

4

Kitchen Light Fitting Cost

197944

 

5

Kitchen construction Travelling cost

13566

 

6

Kitchen Capital Material

90651

 

 

 

 

 

 

2048502

 

 Slide5

2013-2014 INDUSA Remaining work

Sr

No

Material / Work nature

Quantity (Unit Construction)

Cost / Unit

Total Cost

1

Construction of straircase

193 Sq Ft

250 Rs/ Sq Ft

48250

2

Fabrication work at First Floor

800 Sf T

450 Rs/ Sq Ft

360000

3

Side wall of hall

3 Brass (300 Sq Ft)

500 Rs Sq Ft

150000

4

Floor tiles

8 Brass

5000 Rs/ Brass

40000

5

Windows and door

 

 

60000

6

Electrification

Aprox

 

10000

7

Coloring

Aprox

 

15000

8

fall-ceiling

200 Rs/ Sq Ft

 

160000

9

Other Misc

 

 

50000

 

 

 

 

893250

 

 

 

Cost

Rs

/ Unit area

1117Slide6

INDUSA Proposal 2015-2016Construction

new classroom and open hall at

Vigyan

Ashram; 2000 sq. ft. in a two story building with ground and first floors (each 1000 sq. ft

.).Existing room which VA uses as a classroom was old Poultry shed having an area of 630sq. feet. VA uses this room as a multipurpose room like classroom, hall for cultural events, etc.

The existing structure is now beyond the repair and at depleting stage so needs reconstruction.

As it was old poultry; the height of structure is much low and ventilation is not proper. In summer season when temperature rises up, we are unable (uncomfortable) to use the room.

Due to low structural height, windows are inefficient to provide sunlight and fresh air.

We are unable to fix our LCD projector permanently due to unavailability of proper space. We don’t have proper door and storage at current room, therefore always need to carry LCD projector from office when it requires. The room is not designed as classroom hence backbenchers could not see the presenter and presentation.Slide7

INDUSA Proposal 2015-2016We

are unable to fix our LCD projector permanently due to unavailability of proper space. We don’t have proper door and storage at current room, therefore always need to carry LCD projector from office when it requires.

The room is not designed as classroom hence backbenchers could not see the presenter and presentation.

We celebrate different festivals

and on these

occasions students use different musical instruments like Dhol

, drum,

zanj

, lezim, tabla, mrudang, and harmonium - pump organ, and many more. All these instruments are stored on the backside of the classroom. We do not have proper storage room for those. VA believes in ‘Learning while doing’ philosophy and organizes different training programs and workshops. So we need a hall to organize the program/workshops. Currently we need to move the benches from the classroom to get it converted into the hall. In order to overcome the problem we are proposing ground floor + 1 building. In the reconstructed building classroom will be at the ground floor and on first floor will be a hall plus some storage space for musical instruments (total 2000 sq ft.) At present, we also use the existing 630 sq. ft. classroom as a dormitory for 30-35 people by removing benches outside.Slide8

INDUSA Proposal 2015-2016

Existing classroomSlide9

INDUSA Proposal 2015-2016

The costing is based on our experience of construction of kitchen. We will get the actual drawing from architect and then will make final costing.

Like our entire previous project, we wish to involve our students in execution of project

.

Construction work will

begin: 6 – 8 months from receipt of the funds.

We

estimate that approx. 60 students will benefit 2

hrs daily basis of the facility.It will be useful for number of workshops, cultural programs and common assembly of VA throughout the year. Approx. 200 students for 7 days in a year will use it as a dormitory facility.Slide10

INDUSA Budget 2015-2016

Specifications

Existing Structure

Proposed Structure

Height

Low

Appropriate

Area

630 sq. ft.

1000 sq. ft.+ 1000 sq. ft.+1000* sq. ft. (* provision is made for future)

Material

Ferro- cement fabricated roof

R.C.C. double floor (ground+2)

Ventilation

Improper (for poultry)

Proper

Solar System

No

Yes

Rain water harvesting

No

Yes – underground tank

Sunlight

Improper- dim

Proper and clear

Classroom and hall

630 sq. ft. classroom cum hall

Classroom : 1000 sq. ft. at ground flour

Hall: 1000 sq. ft. at first flour

Second floor:

Second Floor: Provision is made in the designing of construction but will not be constructed immediately. Hence funds are not asked for the second floor in this proposal.

Dormitory

Need to relocate the furniture like benches tables and then we place beds

As hall is going to be a dormitory no need to relocate the furniture

LCD projector

Need to carry

Fixed

Audio visual system and musical instruments

Don’t have proper storage room

Will have proper storage room

Seating Arrangement

At single platform

Properly as classroom

Washroom

Combined

separate for ladies and gents at each floorSlide11

INDUSA Budget 2015-2016

Sr. No.

Item

Per unit * Quantity

Total Cost

1

Construction cost for new Classroom construction

Rs.1100 per sq. ft * 2000 sq. ft.

22,00,000

2

Furniture, light fitting, cupboards, sound and LCD

 

3,00,000

3

Design / Architect consultancy

 

50,000

4

Travel / admin / miscellaneous

6%

1,53,000

 

TOTAL

 

27,03,000Slide12

INDUSA Funds – Intended Utilization

KKB family trust

grant of

USD 25000 (INR

16,75,000

.)

INDUSA-VA

Library

Fund - INR

  50,000

Hybrid

Fitness Therapy book publishing

costs - INR

1,00,000

Construction

of Classroom and Assembly Hall

building – INR 15,25,000

Remaining amount is to be raised from other sources.Slide13

Hybrid Fitness Training bookA book titled, "A Guide to Positive Health with Hybrid Fitness Training by Kishan Bhatia" based on a

draft

submitted

to VA for copy editing as well as adding original graphics. Book rights will rest with VA and all revenues generated from the sale of this book be used for student activities. Book should interest mixed audience (Americans, Europeans and Indians).