11 2015 Update to COPS RMSCOPS Workshop III Update IDR Meter Protocol Requirement Threshold 1 013015 WebEx Only IDR Required Workshop III was held on Friday 013015 33 MPs were in attendance via WebEx included CRs TDSPs ID: 249095

threshold workshop webex idr workshop threshold idr webex 2015 ercot cops requirement busidrrq http www protocol forecasting raised meter load 4cp iii

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "February" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

February 11, 2015 Update to COPS

RMS/COPS Workshop III Update: IDR Meter Protocol Requirement Threshold

1Slide2

01.30.15 WebEx Only

IDR Required Workshop III was held on Friday 01/30/15 : 33 MPs were in attendance via WebEx included CRs, TDSPs, PUCT and ERCOT Staff members.

The Workshop Team reviewed and discussed:

ERCOT’s follow-up action items from Workshop II concerning:

Options that may support Load Forecasting requirements: http://www.ercot.com/content/meetings/cops/keydocs/2015/0130/03.__Load_Forecasting_Review_for_BUSIDRRQ_Discussion_2015011.pptCurrent Number of ESI IDs assigned with BUSIDRRQ Load Profile, displayed in 500kW increments :http://www.ercot.com/content/meetings/cops/keydocs/2015/0130/03.__BUSIDRRQ_Counts_IDR_Threshold_Workshop_20150130.ppt TDSPs’ specific Tariff language for IDR Meter(s) and the application of 4CP http://www.ercot.com/calendar/2015/1/30/32022-WORKSHOPS

2Slide3

01.30.15 WebEx Only

Based upon Workshop III’s Market discussions, we have come to: Conclusion: We have removed elimination of the protocol requirement as an option based upon several issues that were identified that it would create for Market Participants and ERCOT.

Discussion

: A Threshold requirement is still being debated because of:

ERCOT’s need to maintain forecasting integrity, CR’s need to continue 867_03 back-end billing processes for BUSIDRRQ profiles and;TDSPs’ Tariff language in relationship to 4CP application, rates and invoicing of IDR metered premises. 3Slide4

01.30.15 WebEx Only

Workshop III Action Items: TDSPs: Investigate IF

IDR Threshold is raised what are the impacts to TDSP’s current and future 4CP application, billing systems and/or rate structure.

Workshop Attendees

: IF Threshold is raised what is the adequate threshold limit? Workshop Attendees: IF Threshold is raised would the change be effective on a going forward basis? K. Scott: Schedule next IDR Meter Protocol Requirement Threshold Workshop IV WebEx Only. Scheduled: Tuesday, February 24, 2015 at 1:30 PM – 4:00 PM WebEx information posted at: http://www.ercot.com/calendar/2015/02/24/54890-cops-rms

4Slide5

Questions?