Jeremy Fienhold Don Kranz Introductions Don Kranz Lead Architect for AMF amp AWB Jeremy Fienhold Lead Analyst on a project using AWB 2 Analysis amp Management Framework Provides a high level assurance based ontology that allows information to be shared between IVampV tools ID: 1001346

project amp version management amp project management version technical design developer future ipep level based process

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Supporting Project Management with AMF" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

1. Supporting Project Management with AMFJeremy FienholdDon Kranz

2. IntroductionsDon KranzLead Architect for AMF & AWBJeremy FienholdLead Analyst on a project using AWB2

3. Analysis & Management FrameworkProvides a high level assurance based ontology that allows information to be shared between IV&V tools.Too much decomposition reduces flexibility, modularity and portability of design.At the simplest level we deal with:ProjectsParticipants3ArtifactsAssessmentsActions

4. IVV 09-1 Manage Responsibilities“A continual review of the IV&V effortRevision of the IPEP as necessary based upon updated Mission Project schedules and development statusCoordination of the IV&V results with the developer and other appropriate management groupsPromotion of technical exchange between IV&V and the developer (to improve technical knowledge transfer and increase IV&V effectiveness) Identification of process improvement opportunities in the conduct of IV&V”4

5. Project Organization5

6. Superior Tracing6

7. Scoping7BehaviorsScopingModules

8. Scoping8

9. Coverage9

10. Assessing Completion10

11. Change Impact11Modified Artifact(s)Previous Assessment(s)

12. Tasking ground work12

13. Future of Architecture13

14. Future FunctionalityImprove ORBIT integrationAdd reporting capabilitiesAdd Admin UI for project configurationImprove support of EBA & TRIntegration with COMPASS14

15. 15Thank You

16. ReferencesIVV 09-1 Version O: Independent Verification and Validation Technical Framework, June 06, 2012IVV 09-4 Version AF: Project Management, May 2, 2013T2103 Version D: Project Execution Plan (IPEP) Template, May 15, 2013S3106 Version D: PBRA and RBA Process, October 4, 2012AWB User’s GuideAMF Architecture & Design document16