/
AF Systems Engineering Assessment Model AF Systems Engineering Assessment Model

AF Systems Engineering Assessment Model - PowerPoint Presentation

pasty-toler
pasty-toler . @pasty-toler
Follow
360 views
Uploaded On 2019-11-22

AF Systems Engineering Assessment Model - PPT Presentation

AF Systems Engineering Assessment Model AF SEAM Validation Assessment Training Current 14 January 2015 Overview Training Objectives AF SEAM Overview and History AF SEAM Goals Policy AF SEAM Practices and Composition ID: 766996

validation assessment seam process assessment validation process seam program engineering team practices processes systems risk project practice improvement programs

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "AF Systems Engineering Assessment Model" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

AF Systems Engineering Assessment Model(AF SEAM)Validation Assessment Training Current: 14 January 2015

Overview Training Objectives AF SEAM Overview and History AF SEAM GoalsPolicyAF SEAM Practices and CompositionAF SEAM Assessment ProcessValidation Assessment OverviewValidation Assessment Planning and ExecutionScoring Methodology and SummariesDocumenting FindingsNext Steps…Validation Assessment Reporting 2

Training Objectives Objectives Provide an overview of model Teach the validation assessment processFacilitate understanding of the validation assessment toolPreparationReview the model content, elements, and definitionsExpected OutcomesUnderstand the contents of the model and scoring methodologyBe able to develop quality validation assessment responsesUnderstand how to use the validation assessment tool 3

What is AF SEAM? Overview Single AF-wide process improvement tool used for the assessment and improvement of systems engineering processes in a project or across an organizationComposite of industry and DoD best practicesPromotes consistent understanding/application of SEFacilitates a gap analysis of an organization’s SE processesHistoryBaseline released (August 2008) – Version 1.0Became policy with AFMCI 63-1201 (October 2009)Update released ( BPDtember 2010) – Version 2.0 4

Why We Need AF SEAM Lack of disciplined system engineering application has been a major contributor to poor program performance Many problems have surfaced repeatedly with AF programs Poor requirements development and managementPoor planning fundamentalsLack of integrated risk and issue managementLack of rigorous process applicationFailure to deliver mission capabilities5

AF SEAM Goals Ensure a consistent understanding of systems engineering Ensure core SE processes are in place and being practiced at the program/project levelDocument repeatable SE “Best Practices” across AFIdentify opportunities for continuous ImprovementClarify roles and responsibilitiesImprove program performance & reduce riskAF SEAM is NOT an appraisal of product qualityAF SEAM is NOT a report card on personnel or the organization 6 The Validation Assessment has a further goal of providing an independent “audit” of process and practice usage with the additional intent of continuous process improvement

AFMC PolicyAFMCI 63-1201, Implementing OSS&E and Life Cycle Systems Engineering , Change 2 (11 February 2011) “Programs listed in the Air Force Systems Information Library (AFSIL) shall use AF SEAM as a self assessment tool to evaluate the organization’s capability to perform SE processes. AF SEAM assessments shall be conducted annually.” (Para 1.6)“Organizations are encouraged to assess their programs managed under common processes within a single assessment. The assessment of common programs shall be at the organizational Division level or lower.” (Para 1.6) 7

BES Directorate Policy AF PEO BES Policy: ALL programs required to build a BPD Tailoring Worksheet (TWS) shall complete an AF SEAM Self-Assessment annuallyFoS / SoS: If consolidated under a single TWS, perform a single AF SEAM Self-Assessment Includes all ACAT and sustainment programsValidation AssessmentsAll ACAT I/II/III programs will be subject to validation assessmentsOther programs will be selected for validation assessments by the Director of Engineering (DoE) 8 !

AF SEAM Pedigree AF SEAM Foundation: Capability Maturity Model Integration (CMMI ®)Defense Acquisition Guidebook (DAG)AFI 63-1201 – Life Cycle Systems Engineering ANSI/EIA 632 – Processes for Engineering a System IEEE/EIA 731 – Systems Engineering Capability Model ISO/IEEE 15288 – Systems Engineering-System Life Cycle Processes INCOSE – System Engineering Standards IEEE 1220 – Application and Management of the Systems Engineering Process 9

AF SEAM Practices Specific Practices Unique to each process area Informative MaterialDescriptionTypical Work ProductsOther ConsiderationsReferencesLocal ReferencesGeneric PracticesSame questions apply to all process areasInformative MaterialDescription Typical Work Products Facilitates successful achievement of specific practices and process area goals 10 GP1 – GP7

AF SEAM Practice Composition Process Areas Goals Specific Practices Generic Practices Total Practices Configuration Management (CM) 3 8 7 15 Decision Analysis (DA) 1 5 7 12 Design (D) 3 14 7 21 Manufacturing (M) 4 12 7 19 Project Planning (PP) 3 15 7 22 Requirements (R) 4 13 7 20 Risk Management (RM) 3 7 714Transition, Fielding & Sustainment (TFS)415722Tech Mgmt & Control (TMC)415722V & V (V)516723IA SE Integration (IA)410717Totals:3813077207 11

Sample Specific Practice RMG1P1 : Determine risk sources and categories Description: Establish categories of risks and risk sources for the project initially and refine the risk structure over time (e.g., schedule, cost, supplier execution, technology readiness, manufacturing readiness, product safety, and issues outside control of team), using Integrated Product Teams. Quantify the risk probability and consequence in terms of cost and schedule.Typical Work Products: Risk Management Plan; Risk MatrixReference Material: DoD Risk Management Guide, AFI 90-901Other Considerations: Consider using Acquisition Center of Excellence Risk Management Workshops when needed. For manufacturing risks consider the capability of planned production processes to meet anticipated design tolerances. Include the supplier’s capacity and capabilities in the analysis. 12

Generic Practices GP-1 : Establish and maintain the description of a defined process GP-2: Establish and maintain plans for performing the processGP-3: Provide adequate resources for performing the process, developing the work products, and providing the services of the processGP-4: Assign responsibility and authority for performing the process, developing the work products, and providing the services of the processGP-5: Train the people performing or supporting the processes neededGP-6 : Monitor and control the process GP-7 : Review the activities, status, and results of the process with higher level management and resolve issues 13

AF SEAM Assessment Process 14 START SELF ASSESSMENT CONDUCT VALIDATION POST RESULTS YES Feedback VALIDATION REQUIRED? NO Record Results Present Findings Record Results Present Findings Program Team Independent Team

Validation Assessment Overview An AF SEAM Validation Assessment is an independent assessment of a project’s/program’s self–assessed implementation of SE practices, processes and proceduresWho’s involvedThe Validation Assessment Team – led by the BES Process IPT; includes matrixed process area SMEs independent of the program officeProject/Program Office TeamPrime Contractor Team (as appropriate)The Validation Assessment is an opportunity to:Ensure existence of disciplined systems engineering processes; validate project/program office demonstrated ability to execute processes Identify strengths / best practices exercised by programs/projects Identify opportunities for program/project or process improvement 15

Validation Assessment Overview (Cont’d) Who’s involved and what’s the schedule of events? The Validation Assessment Team – led by the BES Process IPT; includes matrixed process area SMEs independent of the program officeProject/Program Office TeamPrime Contractor Team (as appropriate)16

Validation Assessment Preparation & Execution 17 Plan BPD Procedure: QAPR006 – AF SEAM Validation AssessmentScope the Validation Assessment effortIdentify and allocate resources to each process area; this is a TEAM effort (not just engineering) – BES Process IPT will resource independent team membersSchedule Validation Assessment Team Training Schedule Validation Assessment activitiesValidation Team reviews project/program Self-Assessment resultsExecute Validation AssessmentValidation Team assesses each assigned area and records results on the AF SEAM Assessment Tool (AFSAT) spreadsheetInterview project/program office personnel; review basic documentation (may include support contractors) Select the appropriate score and document findings, strengths and/or improvement opportunities on the AF SEAM Assessment Tool (AFSAT)

Scoring Methodology Same methodology as Self-Assessment Compare project/program processes (how you do things) to the practice (a process standard, or what should be done) and answer… (1) = YES – if your process completely satisfies the practice(0) = NO – if your process does not satisfy or partially satisfies the practice (Give yourself partial credit in the explanation.)N/A – if the practice does not apply either by uniqueness of the program, timing, or other circumstances Be prepared to defend N/A answers 18

Documenting Findings… Validation Team will make honest assessments of each practice All findings will be discussed before final entries are recorded Concise explanations of findings will be presented including references to the governance/guidance related to the findingPractices will only be scored YES if the project/program fully complies with the practice If a practice is partially meet and there is an opportunity to improve, it will be scored as NO and explained All findings will be adjudicated and agreed upon before preparing the final assessment report 19

20 AFSAT Sample SELECT FROM LIST OF VALUES 1, 0, or N/A

21 AFSAT Sample (Cont’d)

Specific Practices Summary

Generic Practices Summary

Combined Summary

Review each N/A score for reasonableness Prioritize each NO score into one of four categories Compliance item – we must do thisAdds great value to program – we’re going to do thisAdds value – we’d like to do this but we do not have enough resourcesNo or little value – we are not going to do this (now or later) because it brings little or no value; documentEach NO item should generate a program risk / action itemBuild handling plans (mitigation, etc.) to address highest priority items What’s Next?

Validation Assessment Reporting 26 Brief Branch/Division Leadership/Director of Engineering Formal outbrief using AFSAT Tool Summaries Highlight program strengths and improvement opportunitiesReview risks generated for practices scored NOPrepare Final Validation Assessment ReportCompile PEO Summary of Validation Assessment Results (BES Process IPT)Identify systemic and organizational strengths / improvement opportunitiesAnalyze / implement organizational process changes necessaryBrief the PEO and Senior Staff on organizational results/trends

Summary AF SEAM was designed to Promote consistent understanding/application of Systems Engineering Discipline Facilitate Continuous Process Improvement (CPI) – at the program and organizational levelsUltimately – Improve Program PerformanceUnderstanding the AF SEAM Model and Methodology is imperative to performing the validation assessmentsAF SEAM Assessments are a TEAM effort; all members of the validation team must work collaboratively for assessments to be a success – that efforts leads to improved program performance 27

Recap and FeedbackDo you have any unanswered questions? Did we meet the objectives as stated? Don’t forget to request your CLPs! Please fill out a critique so we can improve this class for those who may attend in the future; written suggestions are very helpful28