/
The SAE G-22 Aerospace Engine Supplier Quality (AESQ) Committee was established as a Technical The SAE G-22 Aerospace Engine Supplier Quality (AESQ) Committee was established as a Technical

The SAE G-22 Aerospace Engine Supplier Quality (AESQ) Committee was established as a Technical - PowerPoint Presentation

pasty-toler
pasty-toler . @pasty-toler
Follow
342 views
Uploaded On 2019-11-05

The SAE G-22 Aerospace Engine Supplier Quality (AESQ) Committee was established as a Technical - PPT Presentation

The SAE G22 Aerospace Engine Supplier Quality AESQ Committee was established as a Technical Committee under the SAE Aerospace Council to develop specify maintain and promote quality standards specific to the aerospace engine supply chain The Aerospace Standards in the AS130XX series are inte ID: 763404

aesq standards quality amp standards aesq amp quality aerospace process requirements as9145 sae ppap design production industry product engine

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "The SAE G-22 Aerospace Engine Supplier Q..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

The SAE G-22 Aerospace Engine Supplier Quality (AESQ) Committee was established as a Technical Committee under the SAE Aerospace Council to develop, specify, maintain and promote quality standards specific to the aerospace engine supply chain. The Aerospace Standards in the AS130XX series are intended to be used together and in conjunction with other key industry quality standards to provide a comprehensive suite of interrelated quality standards that reduce customer specifics and integrate industry best practices with aerospace engine unique elements. Given the stringent quality requirements and advanced manufacturing processes and technologies inherent to the complexity and criticality of the components involved, it is essential for organizations to integrate each specific standard into their Quality Management System with a clear understanding of how each relates to other industry standards in order to implement it efficiently and effectively. SAE G-22 AESQ Technical Committee - User Feedback Appendix AAESQ Standard Interconnection Overview The SAE G-22 AESQ Technical Committee welcomes and encourages every user to provide feedback with any comments, questions, and/or suggestions concerning G-22 AESQ Aerospace Standards through the following link:

AESQ VisionTo establish and maintain a common set ofQuality Requirements that enable theGlobal Aerospace Engine Supply Chainto be truly competitive throughlean, capable processesand a culture of Continuous Improvement

AESQ Guiding PrinciplesSimplify & Standardize supplier requirements Build on existing industry standards Common language for QualityStandards are simple, prescriptive & auditable Promote standardized 3rd party training Easy to adopt within existing process/systems Deliver results rapidly, through focused activities

Product Life Cycle & Document Interaction AS9145 (APQP/PPAP) & AESQ Standards AS9145 PPAP Element Timing Design Records & DRA Process Flow Diagram PFMEA Control Plan Packaging, Preservation & Labelling MSA ICS FAI 1. Planning Initial Prod. Approval AS9145 Key PPAP Events Design Release (CDR) End of Concept (PDR) Kick Off Production Launch AS9145 (PDP) AS9145 APQP Phases AS9102 FAIR Production Process Run PPAP Approval 4. Product & Process Validation 3. Process Design & Development 2. Product Design & Development 5. Ongoing Production, use and Post Delivery Service Production Readiness Review AESQ 2 nd Level Documents AS13005 – Quality Audit Requirements AESQ Systems Documents AS13007 – Supplier Management AS13001 – Delegated Product Release Verification Training Requirements AS13004 – PFMEA & Control Plans AS13003 – Measurement Systems Analysis AS13002 – Inspection Frequency AS13006 – Process Control Methods AS13000 – Problem Solving Requirements for Suppliers - 8D

AS13001 Standards Relationships

AS13004 Standards Relationships

AS13006 Standards Relationships

AESQ WEBSITE - aesq.saeitc.org Questions, Suggestions & Feedback