/
TPC Field Cage Bo Yu DUNE Engineering Meeting TPC Field Cage Bo Yu DUNE Engineering Meeting

TPC Field Cage Bo Yu DUNE Engineering Meeting - PowerPoint Presentation

pasty-toler
pasty-toler . @pasty-toler
Follow
346 views
Uploaded On 2019-02-19

TPC Field Cage Bo Yu DUNE Engineering Meeting - PPT Presentation

Sept 8 2015 Requirements Assumptions Provide the nominal drift field of 500Vcm Withstand 180kV near the cathode Define the drift distance between the APAs and CPAs to lt1cm Use materials with comparable CTEs to that of stainless steel along the length of the TPC minimal CTE in t ID: 752608

cage field status 2015 field cage 2015 status divider voltage copper ground tpc strip strips capacitance electric cathode lar 180kv discharge clearance

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "TPC Field Cage Bo Yu DUNE Engineering Me..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript