Download Presentation The PPT/PDF document "Condenser supply contract report" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
Condenser supply contract report
Jose Botelho Direito EN/CV/DCThermosyphon cooling workshop §5Thursday, October 20, 2011Slide2
Outline
Technical RequirementsRequest for QuotationDesign from D.A.T.E. Construction Schedule
20/10/2011
Thermosyphon cooling workshop §5
2Slide3
Technical Requirements
Thermal Requirements:Total
Condenser cooling power: 170kWDe-superheating: 28.7 kW
Condensing: 135.8 kWSub-cooling: 5.5 kW
DO-26673/EN-CV – EMDS document number 1134974
20/10/2011
Thermosyphon cooling workshop §5
3Slide4
Technical Requirements
Stainless Steel Shell and Cupronickel or SSt cooling tubesFOAMGLAS InsulationStorage capacity of 2.5m3Pressure: PN25Design temperature from -70°C to 63°C
Leak tightness of 10-4mbar.lt/s
Standards:Pressure Equipment Directive 97/23 (PED)Leak tightness: BS EN13184:2001Cleaning: ASTM A380Earthquake loading: EUROCODE 8
20/10/2011
Thermosyphon cooling workshop §5
4Slide5
Request for Quotation
Companies contacted (11x):AEL (de); KLIMAL (de); ALFA LAVAL (se); APPARETEBAU-CRIMMITSCHAU (de); ARSOPI (pt); BOWMAN (uk); D.A.T.E. (fr);
Novoa Equipment Limited (uk
); Onda (it); SWEP (se); GEA (de).Offers received (3x):
D.A.T.E.
ARSOPI
GEA
DO-26673/EN-CV – EMDS document number 1134974
20/10/2011
Thermosyphon cooling workshop §5
5Slide6
Design proposal from D.A.T.E.
20/10/2011Thermosyphon cooling workshop §5
6
DESUPERHEATING and CONDENSATION ZONE
SUBCOOLING ZONE
HEAT TRANSFER COEFFICIENT
299,65 W.m.
-2
°C
-1
112,8 W.m.
-2
°C
-1
HEAT TRANSFERT SURFACE
86,85 m
2
9,07 m
2
PRESSURE DROP
6 mbar
10 mbar
NUMBER OF TUBES
240 tubes
28 tubes
Thermosyphon C3F8 Liquid outlet
Thermosyphon C3F8 Vapour inlet
Brine Condenser IN
Brine Condenser OUT
Brine Sub
-
cooler IN
Brine Sub
-
cooler OUT
De-superheating & Condensing tubes (240x)
Sub-cooling tubes (28x)Slide7
Construction Schedule
Condenser Construction ScheduleOctober 2011: Contract startNovember 2011: Detailed designJanuary 2012 : Purchasing of materialMarch 2012: Condenser construction
April 2012: Final pressure testsApril 2012: Insulation of the condenser
April 2012: Delivery at CERN20/10/2011
Thermosyphon cooling workshop §5
7Slide8
Any questions?20/10/2011Thermosyphon cooling workshop §5
8