By Nawal Kishor Dwivedi MTech Structural Engineering MNIT Jaipur GENERAL FACTS 6 RD TALLEST BUILDING IN THE WORLD MARCH 2014 TALLEST BUILDING IN WORLD FROM 1998 TO 2004 PRECEEDED BY INTERNATIONAL COMMERCE ID: 749970

column tower wind concrete tower column concrete wind steel core floor storey beams bridge pinnacle columns sky height span

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "PETRONAS TWIN TOWER, KUALA LUMPUR, MALA..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

PETRONAS TWIN TOWER, KUALA LUMPUR, MALAYSIA

By-

Nawal

Kishor

Dwivedi

M.Tech

Structural Engineering , MNIT

JaipurSlide2

GENERAL FACTS

6

RD

TALLEST BUILDING IN THE WORLD , MARCH 2014

TALLEST BUILDING IN WORLD FROM 1998 TO 2004

PRECEEDED BY INTERNATIONAL COMMERCE

CENTER , HONG KONG ,CHINA

SURPASSED BY NANJING GREENLAND FINANCIAL

COMPLEX ,CHINA

LOCATION : KLLC , JALAN AMPANG , KUALA LUMPUR ,

MALAYSIASlide3

TYPE : COMMERCIAL , TOURIST ATTRACTION

CONSTRUCTON STARTED ON 1

ST

MARCH 1993

AND COMPLETED ON 1

ST

MARCH 1996

COST : US$ 1.6 BILLION

OWNER : KLLC HOLDINGS

NUMBER OF STOREY: 88 (+ 4 BASEMENT FLOORS)

TOTAL HEIGHT : 451.9 m (Architectural )

378.6 m ( Roof )

LIFTS/ELEVATORS : 78Slide4

FLOOR AREA : 395000 m sq

MATERIAL : CONCRETE , STEEL

ARCHITECT : CESAR PELLI

STRUCTURAL ENGINEER : THORNTON THORMASETI

CONTRACTORS : TOWER 1 : HAZAMA CORPORATION

TOWER 2 : SAMSUNG ENGG.& CO.Slide5

PROJECT DATA

EACH TOWER : 88 STOREYS

TOWER 1 :PETRONAS HEAD QUARTERS

TOWER 2 :

LOCAL AND INTERNATIONAL PRIVATE

TENANTS, KLCC HOLDINGS

SMALLER CIRCULAR BUSTLE OR ANEXX ADDED

TO EACH TOWER RISING 44 STOREY

TOWERS CONNECTED BY SKY BRIDGE AT 41

ST

& 42

ND

STOREYSlide6

SKY BRIDGE: CENTRE-LINE SPAN: 58.44 METRES; WIDTH, 5.29 METRES

HEIGHT, 9.45 METRES

FINISHED CEILING HEIGHT: 2.65 METRES

HEIGHT OF PINNACLES: 73.5 - 75 METRES

FLOOR AREA VARRIES AS TOWER ACCENDS

CENTRAL CORE GROSS AREA :510 m sq approx

FACILITIES : 3 LEVEL CONCERT HALL

6 STOREY RETAIL AND ENTERTAINMENT PARK

PETROLEUM RESEARCH CENTRE

4 STOREY BASEMENT PARKING etc.Slide7

FOUNDATION

EARLY EXCAVATION PROBLEM : LIMESTONE BEDROCK

300000 METRIC TON WEIGHT OF EACH TOWER

TO BE SPREAD ON MAT FOUNDATION

PRESSURE EXERTED BY EACH TOWER : 1140 K-Pa (more than twice bearing cap. of soil available)

ALSO BED ROCK WAS SLOPING – MAY LEAD TO FAILURE

CONSTRUCTION SITE SHIFTED 60 m AWAY

FINALLY RESTED ON CONCRETE MAT ANCHORED WITH

CONCRETE FRICTION PILES

4.5 M THICK RAFT SUPPORTED ON 45-105 M RECTANGULAR PILESSlide8

LONGER PILES WHERE DEEP BED ROCK- TO AVOID DIFFERENTIAL SETTLEMENT

M45 CONCRETE USED FOR PILES

13200 cu m OF M60 CONCRETE USED IN RAFT

CHILLED WATER USED- MINIMIZE DIFFRENTIAL

TEMPERAURESlide9
Slide10

CENTRAL CORE

CENTRAL CORE IN EACH TOWER

ACCOMMODATE – LIFTS, EXIT STAIRS, MECHANICAL

SERVICES

TWO SOLID WALLS RUNNING N-S AND E-W- WEB

CANTILEVER BEAMS PROJECTING-MAKES IT STIFF

TAKES MORE THAN HALF THE TWISTING MOMENT

HIGHLY REINFORCED THICK CORNER WALLS- RESIST

WIND

CORE VARRIES FROM 22 sq m TO 19 X 22 m IN FOUR

STEPS

OUTER WALLS 750 TO 350 mm

INNER WALLS COSTANT 350 mm- TO AVOID COMPLICATION

WITH LIFT SHAFT

CONCRETE GRADE DROPS FROM 80 -40

Mpa

AS IT ACCENTS

Slide11

FLOOR PLANSlide12

CORE WALL LAYOUTSlide13

COLUMNS

COLUMNS CAST IN REUSABLE STEEL FORMS

FINELY FINISHED COLUMNS OPEN TO VIEW AT

MOST OF THE FLOORS

16 TOWER COLUMN- VARRY ALONG HIGHT IN DIA.

2.4 m TO 1.4 m DIA

CONCRETE VARRIED FROM M80 TO M30 IN 3 STEPS

12 BUSTLE COLUMS – 1.4m TO 1m

SETBACKS AT 60, 73 AND 82

SLOPING COLUMS OVER 3 STOREY HEIGHTS

ABOVE FLOOR 84 – HIGH SLOPE – STEEL COLUMN

USED TO AVOID COMPLICATIONSlide14

COLUMN SIZE AND COLUMN GRADESlide15

SLOPING COLUMNSlide16

BEAMS

TAPERED RING BEAMS ALL AROUND

DEPTH 1.15 m AT COLUMN TO 725 mm AT FLAT ZONE

SPAN VARIATION DUE TO COLUMN CHANGES AND

SET BACKS

BEAM GRADE MATCHES COLUMN GRADE TO

SIMPLIFY PUMPING

OUTRIGGERS

E-W OUTRIGGER LINK CORE AND COLUMNS AT FLOOR

38-40

3 LEVEL BEAMS LINKED BY MID SPAN POSTS – HELP

RESIST WIND EFFECTSlide17
Slide18

SKY BRIDGE

DOUBLE DECK BRIDGE SPANNING 58.4 m

CONNECTS TWO TOWER AT SKYLOBBY ELEVATOR

TRANSFER STATION

ON FLOOR 41 AND 42

EASY CIRCULATION B/W UPPER TOWER FLOORS

MINIMIZE LIFT USAGE

REDUCES FIRE EXIT REQUIREMENT

GREAT HEIGHT AND SPAN

REQUIRES STEEL FOR LIGHT WEIGHT AND EASY CONST.

TWO HINGED ARCH SUPPORTS THE SPAN

SELF CENTRING ACTION FROM RESTRAIN AT ARCH

CROWN AND SPHERICAL PIN AT SUPPORTSSlide19
Slide20
Slide21

PINNACLE

EACH TOWER CROWNED BY- 73 m TAPERING TOP

ACCOMMODATES – BUILDING MAINTENANCE

MACHINE , AVIATION LIGHTING AND LIGHTING

PROTECTION

DUE TO STEEP SLOPING COLUMN

CONCRETE CONSTRUCTION IMPARACTICAL

STEEL USED THROUGHOUT

LOWER PINNACLE- 8 STRUCTURAL STEEL FRAMES

UPPER PINNACLE – SINGLE MAST OF TAPERING CIRCULAR

CROSS SECTION

Slide22

PINNACLE ELEVATIONSlide23
Slide24

DYNAMIC STUDIES

CROSS WIND EFFECTS ON STRUCTURE AND USER COMFORT

ANALYTICAL MODELLING :

3D MODELLING USING SAP90

INCLUDING PERIMETER BEAMS, COLUMNS, CENTRAL

COLUMN REPRESENTING CORE & OUTRIGGER SYSTEM

COLUMN GROSS CROSS SECTION PROPERTIES USED-

COMPRESSIVE STRESSES DOMINANT

ELASTIC MODULI ‘E’ VALUES VARIED WITH STRENGTH

ACCORDING TO ACI318

‘E’ VALUES NOT REDUCED FOR CREEP- SHORT TERM WIND

LOADING

BEAMS ASSUMED TO BE ‘CRACKED’- AVG. STIFFNESS I/2Slide25

WIND MODELLING

DESIGN WIND 35 m/s ASSUMED AT 10m ELEVATION

RETURN PERIOD 50 YEARS

FORCING FUNCTION DETERMINED USING IT

ANALYSIS FOR DYNAMIC FORCE AT 1-2% DAMPING

RESULTS REVEALED

2% DAMPING REDUCES BASE SHEAR

VALUES WELL BELOW LIMITS

NO REQIREMENT OF TUNED DAMPERS

SIMILAR DYNAMIC MODELLING DONE FOR SKY

BRIDGE,PINNACLE

SKY BRIDGE REQIRED TUNED MASS DAMPERS-3 EACH

LEG Slide26

CONCLUSION

MIXED CONSTRUCTION FOR COST AND USABILITY

BENEFIT

USE OF HPC – REASONABLE SECTIONS, LOW COST ,

MORE SPACE

CONCRETE CONSTRUCTION- SIMPLE EQUIPMENTS

LESS SKILL , EASY CONNECTION

CONCRETE – BENEFITS WIND BEHAVIOUR –INHERENT

STIFFNESS AND DAMPING

STEEL – FAST AND FLEXIBLE ERECTION- PEMITS LAST

MINUTE CHANGE

WIND EXCITATION –BENIFICIAL FOR–SIZE 55mm to .3mSlide27