Clock jitter tests Clock jitter tests

Clock jitter tests - PowerPoint Presentation

stefany-barnette
stefany-barnette . @stefany-barnette
Follow
400 views
Uploaded On 2017-05-10

Clock jitter tests - PPT Presentation

222012 Goal monitor clock jitter during ramping BEAM1 clock more than 10 ramps done different CORDE delay ranging from 44ns to 10ns PbPb 2011 delays were 44ns 67ns also blowup applied a slow change of frequency roughly in the middle of the ramp ID: 546713

corde clock ramps jitter clock corde jitter ramps magnetic 4ns delay applied field magnets ramping 2012goal tests blow

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Clock jitter tests" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Clock jitter tests

2.2.2012Goal: monitor clock jitter during ramping BEAM1 clock more than 10 ramps done different CORDE delay ranging from 4.4ns to 10ns. PbPb 2011 delays were 4.4ns - 6.7ns. also blow-up applied (a slow change of frequency roughly in the middle of the ramp)

13.2.2012Goal: repeat test with magnetic field, blow-ups not applied now several ramps without magnetic field or during ramping magnets CORDE delay: 6670ps solenoid on (-) from 12:50, dipole on (-) from 13:28 last 2 ramps with both magnets on (negative) CORDE: 4390ps from 12:35 CORDE: 8000ps from 13:53

Clock jitter, monitored with scope in persistence mode all the time, was not observed.Slide2

Clock jitter tests