Phase BULLDOG DRIVE PROJECT LIMITS Bulldog Drive ultimately will be widened from a 2lane undivided rural typical section to a 4lane divided urban typical section with a landscape median The interim phase will be a 2lane reconstruction with turn lane stormwater system improvements tu ID: 179522
Download Presentation The PPT/PDF document "Construction" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
Construction
Phase
BULLDOG
DRIVESlide2
PROJECT LIMITSSlide3
Bulldog Drive ultimately will be widened from a 2-lane undivided, rural typical section to a 4-lane divided, urban typical section with a landscape median. The interim phase will be a 2-lane reconstruction with turn lane, stormwater system improvements, turn lanes and signal replacement on SR100, and improvements at high school site due to improvements on Bulldog and SR100.PROJECT SUMMARYSlide4
Stormwater Improvements (reduce flooding of school site)Improve safety for vehicles and pedestrians.Shift main high school entrance west to alleviate back-ups into the bulldog drive/SR100 intersection.Provide right turn lanes on SR100 onto Bulldog Dr. and high school entrances.Provide turn lane on Bulldog for left turn into high school site.Provide a 10-foot sidewalk along the west side of
Bulldog Drive.Reconstruction of Bulldog/SR100 intersectionReplace string pole signal with a new mast arm signal.Roadway improvements for the ultimate configuration:
Right turn lane on bulldog onto SR100 and two left turn lanes onto SR100.Extend existing left turn lane on SR100 onto Bulldog Drive.
Extension of street lighting.Enhanced Landscaping and re-use irrigation.PROJECT BENEFITSSlide5
Short-Term vs. Long Term NeedsShort Term:Current Safety
IssuesSchool Circulation
Intersection & Turning
Movements (SR100 & Bulldog)Stormwater Issues (Flooding)
Long-Term:
(
Growth
Not Occurring as Anticipated)Additional Roadway Capacity Solution = Phased ApproachPhase 1: (Address Current Safety & Stormwater Issues
)
School Circulation
Intersection & Turning Movements
Stormwater
Issues
Phase
2 – (Address Capacity Issues) 4 Lanes at Later Date – TBD
PROJECT PHASINGSlide6
PROJECT PHASINGSlide7
PROJECT LAYOUTSlide8
CITY COUNCIL ACTIONConstruction Inspection (CEI) Change OrderStantec
$ 263,630.08FPL Street Light Agreement (Not-To-Exceed)
Street
Light Agreement $ 300,000.00Construction Contract
P&S Paving
$ 4,267,620.69
Contingency $ 200,000.00Slide9
CITY COUNCIL ACTIONRight-of-Way Map for Bulldog DriveSlide10
CITY COUNCIL ACTIONEasement for Town Center CDD (2,077sf)Slide11
CITY COUNCIL ACTIONEasement for FPL UtilitiesSlide12
CRA BudgetSlide13
CONSTRUCTION PHASE FUNDING