FOR THE YEAR 200607 Tezu PW Division is one of the oldest divisions in Arunachal Pradesh and it covers the 44 Tezu Assembly Constituency segment This division was established initially ID: 853368

100 division repair tezu division 100 tezu repair nos completion 2006 completed laying works mtr mtrs pipeline lakhs head

Share:

Link:

Embed:

Download Presentation from below link

Download Pdf The PPT/PDF document "ADMINISTRATIVE REPORT OF TEZU DIVISION P..." is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

1 ADMINISTRATIVE REPORT OF TEZU DIVISION P
ADMINISTRATIVE REPORT OF TEZU DIVISION P.W.D., A.P FOR THE YEAR 2006-07 :- Tezu P.W. Division, is one of the oldest divisions in Arunachal Pradesh and it covers the 44- Tezu Assembly Constituency segment. This division was established initially as Lohit Frontier Division with its head-quarters at Sadiya in Assam in 1947. It was later renamed as Lohit C.P.W Division and its head-quarters were shifted to Tezu. Afterwards it was further

2 renamed as Tezu and extends upto the bo
renamed as Tezu and extends upto the boundary of Lohit and Anjaw districts. To the South, its jurisdiction extends to the Lohit river and to the boundary of Lohit and Lower Dibang Valley districts to the North. At present this division has two P.W.Sub-divisions viz Tezu Sub-division and Sunpura P.W.Sub-division. The sub-With its well established organizational set up, this division undertook and completed many prestigious projects in Lohit distr

3 ict over the years since its establishme
ict over the years since its establishment, thereby contributed in a big measure to the socio-economic growth of the area and its people. Many valuable govt. assets have been created through the agency of this division. The assets created over the years include roads, bridges, suspension bridges, culverts, residThe division is entrusted with the responsibility of tenance of these assets also. And the division continues its march contributing

4 to the all round development of the area
to the all round development of the area and its Executive Engineer : Er. K.Yirang Asstt. Surveyor of works : Er. A.K. Sen (upto 15-1-2007 ) Er. Kamal Ghosh (w.e.f.16-1-2007) Asstt. Engineer, P.W.Sub-division, Tezu : Er. A.K. Sen Asstt. Engineer, P.W.Sub-division, Sunpura : Er. N. Singh. Brief descriptions of the activities of the 1) In all 33 prelimi

5 nary estimates were to be submitted unde
nary estimates were to be submitted under State P.W.D plan heads. 18 were under 5054 (P), 8 Nos under 4216 Housing , 2 Nos under 4059 P.W.(P), 1 No under 5054 Road (ACA) and 4 Nos under 2059 (TFC). All were submitted promptly and sanctions were also obtained on Annexure-A In all 18 Nos preliminary estimates were submitted under different Non-PWD heads of 2. 5475 GENERAL ECONOMIC SERVICES. C/O Office building for District Statistical bl

6 dg 100% Building completed TARGETS AND
dg 100% Building completed TARGETS AND ACHIEVEMENTS MADE A few deposit works under Kendriya Vidyalaya Sangathan, Central School for Tibetans, M.L.A.L.A.D. etc. were also gets were achieved against these Name of Scheme Target Achievement 1. K.V.S. Schemes Spl. Repair & maint. of school bldg. at K.V. Tezu Special repair of T-IV-1 No, T-III-8 Nos, T-II-8 Nos T-I=4 Nos quarter 100% completion. Repairing of Toilets of School building 100% com

7 pletion. Repair of overall school buildi
pletion. Repair of overall school building 100% completion. C/O RCC slabs and Laboratory components 100% completion. Repair of Bachelor barrack 100% completion. Special repair of T-IV-1 No, T-III-8 Nos, T-II-8 Nos , T-I=4 Nos quarter completed. Repairing of Toilets of School building completed. Repair of overall school building completed. C/O RCC slabs and Laboratory components, completed. Repair of Bachelor barrack development works at Cycle

8 stand 100% completion. Drain 330 Mtrs,
stand 100% completion. Drain 330 Mtrs, culvert-1 Mtr span-2 Nos, Guard room 100% completion. Chain link fencing and footpath 100% completion. Improvement of drinking water supply system 100% Cycle stand 100% completion. Drain 330 Mtrs, culvert-1 Mtr span-2 Nos, Guard room 100% completion. Chain link fencing and footpath 100% completion. Improvement of drinking water supply system 100% completion. Providing lift water supply system at K.V.Comple

9 x at 100% Completion Procurement of CGI
x at 100% Completion Procurement of CGI Sheet and hardware items for water pump house. C.S.T. Schemes Development of rain water harvesting system nearby twp toilets in CST RCC staging 2 mtr height - 2 Nos., Sintex tank-2 Nos. (5000 ltr capacity), Laying of G.I pipeline 25 mm Q=200 mtr, G.I. Sheet gutter- 136 mtr, Pipeline laying 15 mm Q= RCC staging 2 mtr height - 2 Nos., Sintex tank-2 Nos. (5000 ltr capacity), Laying of G.I pipeline 25 mm

10 Q=200 mtr, G.I. Sheet gutter- 136 mtr,
Q=200 mtr, G.I. Sheet gutter- 136 mtr, Pipeline laying 15 mm Q= 25 mtr.- 100% Completed. Addition/ Alteration in kitche/bathroom to old qtrs. at CST Tezu. RCC kitchen slab, AC sheet ceiling in kitvhen, CC water storage tank, CC flooring in kitvhen, wooden shelves in kitchen, whitewashing, painting replacement of sunshade, replacement of glass panes in RCC kitchen slab, AC sheet ceiling in kitvhen, CC water storage tank, CC flooring in kitvhen,

11 wooden shelves in kitchen, whitewashing,
wooden shelves in kitchen, whitewashing, painting replacement of sunshade, replacement of glass panes in window shutters.- 100% Completed. facilities at CST Tezu. Sintex tank 1 No.- 10000 ltr capacity, Laying 50 mm dia pipeline- 550 mtrs, Laying 25 mm dia pipelie-283 mtrs, Laying 40 mm dia pipeline-228 mtrs, Laying 15 mm dia pipeline- 68 mtrs. G.I. Iron push cock -1 Sintex tank 1 No.- 10000 ltr capacity, Laying 50 mm dia pipeline- 550 mtrs, Layi

12 ng 25 mm dia pipelie-283 mtrs, Laying 40
ng 25 mm dia pipelie-283 mtrs, Laying 40 mm dia pipeline-228 mtrs, Laying 15 mm dia pipeline- 68 mtrs. G.I. Iron push cock -1 0 Nos.- 100% the annual requirement for the salaries and wages of W/C and Casual staff, maintenance & repair of T&Ps etc. This has taken its toll upon many original schemes. If adequate fund is not allotted under maintenance heads in the year 2007-08 also, possibilities are great that the original schemes against which

13 also allotments are meagre, could be mad
also allotments are meagre, could be made casualties. And this division will not be able to pay be salaries and wages of W/C and Casual staff for many months in the year 2007-08. Therefore, it is urged that adequate funds may be allotted under maintenance heads and more original works included during 2007-08. It is also urged that henceforth, the full requirement of fund for wages of W/C and Casual staff be allotted under maintenance and repair

14 heads in order to solve the recurrent pr
heads in order to solve the recurrent problem of No effort was spared to avoid creating liabilities and to clear as much pending liabilities as possible. As a result, no liabilities were created. However, inspite of best and relentless efforts, liabilities to the tune of only Rs. 3.56 Lacs could be cleared owing to acute shortage of fund. The of liabilities is given as Annexure-E. The statement showing the details is given as Annexure-F. No

15 C.S.S.A bill (Out going) was cleared by
C.S.S.A bill (Out going) was cleared by any division, inspite of repeated reminders. The effort for their clearance will be The statement showing the details is enclosed as Annexure-G. No. CSSA bills (Incoming) could be cleared by the division due to acute shortage of fund. Specific allocations are On the average this division spends Rs.7.50 lakhs per month towards the payment of salaries and wages of W/C and Casual staff. Thus, the annua

16 l requirement for salaries and wages of
l requirement for salaries and wages of W/C and Casual staff comes to Rs.90.00 lakhs. In addition to this a minimum of Rs.15.00 lakhs is A’s and Bonus of W/C & Casual staff as per admissibility. Which means that annually an amount of Rs.105.00 lakhs is spent on the W/C & Casual staff of this division. But the total allotment under the three maintenance heads of 3054(R&B), 2216 Sl.No. Name of Work Fund allotment durin g 2006-07 3054 R&B Annua

17 l repair and maintenance of various road
l repair and maintenance of various roads, bridges, porter tracks and suspension bridges. Rs.36.00 Lakhs 2. Payment of terminal benefit to retiring W/C staffs i/c leave salaries and TTA. Rs. 3.00 Lakhs 3. Renewal of surfacing of roads under Tezu Division (Length 2.35 Km). Rs. 8.00 Lakhs 4. Maintenance of T&P during 2006-07 Rs. 3.00 Lakhs 5. Maintenance of Directorate Office. Rs. 4.50 Lakhs 6. Payment of Bonus to Casual and W/C Staff. Rs. 2.7

18 5 Lakhs ANNUAL ADMINISTRATIVE REPORT OF
5 Lakhs ANNUAL ADMINISTRATIVE REPORT OF TEZU P.W.D DIVISION FOR THE YEAR 2006-07 ANNEXURE ‘A (1) Head of AccountTotal No. of PEP.E. submittedP.E. sanctionedP.E. un-sanctionedRemarks123456 p 44Nil4331211Nil1221111Nil1111Nil11Nil111Nil144Nil4 TOTAL :-1818315 STATUS OF P.E's UNDER TEZU DIVISION DURING THE YEAR 2006-07 (NON-PWD HEADS) Head of AccountTotal No. of RER.E. submittedR.E. sanctionedR.E. un-sanctionedRemarks1234561. 4202

19 Education111Nil STATUS OF R.E's UNDER TE
Education111Nil STATUS OF R.E's UNDER TEZU DIVISION DURING THE YEAR 2006-07 (NON PWD HEADS) Sl. No.Sub-Head/ItemUnitFin.Phy.Fin.Phy.12345678Target for 2006-07Achievement for 2006-07 %T-IV-2 Nos. for GA Deptt.- Mat. ProcurementProc. of material & development of site%Spl. Repair (5 unit) = 72% completionRepair works 72% compltd.%Spl. Repair B/Bk- 20 unit = 17% spl. repair work17% special repair works done%Spl. Repair of govt. qtr of PWD & GA.= 10%

20 spl. repair work10% special repair work
spl. repair work10% special repair works done%Re-C/o septic tank = 20% re-construction work20% re-construction works done%Sp. Repair of Resdl. Bldg. at Nirman Sadan = 10% spl. repair work10% special repair works done54059 P.W 24.0024.00Boundary/compound wall = 614 mtrs614 mtrs compltd. sitedevelopment Proc. of material & development of site62216 Maint/Minor work s 12.5612.56Specific maint. Under Tezu Division 100%Specific maint. works done as

21 per TSPayment of Bonus 100%Payment of B
per TSPayment of Bonus 100%Payment of Bonus made Sl. No.Sub-Head/ItemUnitFin.Phy.Fin.Phy.12345678Target for 2006-07Achievement for 2006-07 125475 GENERAL ECONOMIC SERVICES C/o office bldg. for District Statistical officer at Tezu.5.00Statistical office bldg. 100% compln.5.00Building completed upto roof level.134210 MEDICAL & PUBLIC HEALTH (ONE TIME A.C.A) 157.7 3 158.7 7 8 beded isolation wardC/W- 177.6 9 compltd.E/W- 2.3 1 3) Renovation of

22 existing buildingRenovation of existing
existing buildingRenovation of existing bldg.of District Hospital Tezu.completed4) WaterpPump houseWater pump house completed 5) Compound/ Boundary957 mtr 100% completed(length= 1.50 km)BC- 1.50 km7) RCC slab culvertS/C 10 Nos. 100% compld.8) Drainage systemDrain 1200 mtr 100% completed % 10) Office equipmentProcurred 100%(5 Nos. Computer,1 Xerox machine &Improvement of Dist. Hospital at Tezu.1) 8 beded isolation ward Sl. No.Sub-Head/ItemUnitFin

23 .Phy.Fin.Phy.12345678Target for 2006-07A
.Phy.Fin.Phy.12345678Target for 2006-07Achievement for 2006-07 c)Providing lift water supply system 100% completionProcurement of CGI Sheets and hardware i G-14Page 1(Revised Return) Annexure-E BillsCSSAWMC TEOTotalBillsCSSAWMC TEOTotalBillsCSSAWMC TEOTotalBillsCSSAWMC TEOTotalBillsCSSAWMC TEOTotal12345678910111213141516171819202122232425262728A.PWD PLAN HEAD 15054 R&B (P)1.320.86----2.18....................0.42......0.420.900.86----1.7625054 Bri

24 dge1.21------1.21.......................
dge1.21------1.21..............................1.21------1.2133054 R&B (P)5.18------5.18....................1.75......1.753.43------3.4344216 H (P) 1.300.29----1.59....................0.08......0.081.220.29----1.5152216 H (M/A)2.82------2.82....................0.19......0.192.63------2.6362059 M/A29.292.357.17--38.81..0.720.7228.572.357.17--38.0974059 H(P) (EFCR)16.15------16.15....................0.40......0.4015.75------15.7584059 PWD1.73------

25 1.73..............................1.73--
1.73..............................1.73------1.73 HEAD 59.003.507.1769.673.563.5655.443.507.1766.11 S/No.Head of Account.Liabilities as on 1-4-06Progressive clearance of pending Liabilities cleared upto the end of the Qtr. against the liabilities cleared drg. the finanncial year 06-07 upto 31/3/07.TEZU DIVISION P.W.D. AP FOR THE QUARTER ENDING MARCH/2007. A nnexure-F O.B.C.B.as onAs on 01-01-0731-03-0712345671EE, Store Division, Banderdewa.1773

26 50.00NilNil177350.002EE, (Power) Elect,
50.00NilNil177350.002EE, (Power) Elect, Division, Roing.90214.00NilNil90214.003EE, PWD, Jairampur150895.00NilNil150895.004EE, RWD, Roing (Civil)138181.00NilNil138181.005EE, RWD, Tezu.3891.00NilNil3891.00560531.00NilNil560531.00 Name of Division/DepartmentClaim recd. drg. A nnexure-F O.B.C.B.as onAs on 01-01-0731-03-071234567 Name of DivisionClaim recd. drg. 11Director of Accounts, Cabinet Sec. New Delhi.7928.00----7928.0012Controller of Defence

27 Gelibar Maidan, Patna.17353.00----17353
Gelibar Maidan, Patna.17353.00----17353.00261006.00----261006.0014Deputy Commkissioner, Lohit District,Tezu.32432.00----32432.0015Deputy Commissioner, Anini.180.00----180.0016S.P. Lohit District, Tezu.37340.00----37340.0017Assistant Director of S.B. Dibrugarh.299028.00----299028.0018Dist. Edn. Officer, Lohit Dist. Tezu (Now DDSE)4958.00----4958.0019Regilonal District of Naa Calcutta.806793.00----806793.002913220.002913220.00 ANNEXURE I’ Sl.No.C

28 ate g or y of PostSanctioned stren g th
ate g or y of PostSanctioned stren g thPresent positionVacanc y 123451Executive Engineer11Nil2Asstt. Surveyor of works.11..3Asstt. Engineer22--4Head Asstt.11--5Divisional Accountant1Nil16Junior Engineer.99..7Draughtsman Grd-I11--8Draughtsman Grd-II ......8Draughtsman Grd-III11--9Stenographer Grd.III11--10Upper Division Clerk55--11Lower Division Clerk77..12Driver32113Duftry11--14Peon/Chowkidar99--43412 POSITION OF REGULAR STAFF UNDER TEZU DIVISIO