Download presentation
1 -

PERATING NSTRUCTIONSVERFILL ENSOR


BAMO IER GmbH Pirnaer Str 24 D-68309 Mannheim GermanyPhone 49 0621 84224-0 Fax 49 0621 84224-90 wwwbamode SU3558edoc 07/14 Installation initial start-up and maintenance may only be performed by

elina's Recent Documents

Engineering in Society
Engineering in Society

1Engineering in SocietyMinor Code - U144Program RequirementsThe Engineering in Society minor is offered to students within West Virginia University excluding those in the Statler College The minor is

published 0K
PAP Cleaning  Resupply Schedule
PAP Cleaning Resupply Schedule

It is important to follow the replacement and cleaning recommendations below to ensure e31ective treatment and avoid damage to equipmentFor replacement supplies please contact your DME Company

published 0K
Catharanthus roseus  Periwinkle
Catharanthus roseus Periwinkle

gOctober 1999Figure 2 Shaded area represents potential planting rangGrowth rate moderateFruit cover dry or hardTexture mediumFruit color greenFoliage Leaf arrangement opposite/suboppositeLeaf type sim

published 0K
The British Mission
The British Mission

by Dennis C FakleyNews of the discovery in early1939 of neutron-induced fissioninuranium immediatelyprompted ideas in the UnitedKingdom and elsewhere not only of a con-trolled fission chain reaction b

published 0K
EIGHTEENTH JUDICIAL CIRCUIT SEMINOLE COUNTYCIVILFAMILY DIVISION ADMIN
EIGHTEENTH JUDICIAL CIRCUIT SEMINOLE COUNTYCIVILFAMILY DIVISION ADMIN

1HEARINGSSCHEDULINGPlease review the Court146s policy regarding mandatory meet and confer before scheduling your hearing see page 11 and 12All hearingsexcept for residential mortgage foreclosure cases

published 0K
The views stated here are my own and do not necessarily reflect the vi
The views stated here are my own and do not necessarily reflect the vi

Federal Trade CommissionAntitrust Section ConferenceSeptember 8 2007NTRODUCTIONWith the issuance of the Statement of Objections to Intel and on the eve of the much-anticipated decision in the Micro

published 1K
July 2018 Cassandra D Owens Madelyn Glickfeld Regional Water Quality
July 2018 Cassandra D Owens Madelyn Glickfeld Regional Water Quality

evidenced by the fact that the plant only ran 120 days at 6-8 hours/day over the past few years and the circulation was sufficient New pumps can also be solar-powered Oxnard and its harbor residents

published 0K
LEGISLATURE
LEGISLATURE

CONFHEA04-22-16htmCONFHEA04-22-16htmCONFHEA04-22-16htmTHE TWENTY-EIGHTHREGULAR SESSION OF 2016NOTICE OF CONFERENCE COMMITTEE MEETINGDATEFriday April 22 2016TIME1030 amPLACEConference Room 329State Cap

published 0K
Download Section

Download - The PPT/PDF document "" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.






Document on Subject : "PERATING NSTRUCTIONSVERFILL ENSOR"— Transcript:

1 PERATING NSTRUCTIONSVERFILL ENSOR BAMO
PERATING NSTRUCTIONSVERFILL ENSOR BAMO IER GmbH Pirnaer Str. 24 D-68309 Mannheim, Germany Phone: +49 (0)621 84224-0 Fax: +49 (0)621 84224-90 www.bamo.de SU3558e.doc 07/14 Installation, initial start-up and maintenance may only be performed by trained personnel! The device may only be connected to power which complies with the specifications included in the technical data and on the serial plate! The device must be disconnected from all sources of power during installation and maintenance work! The device may only be operated under the conditions specified in these operating instructions! Functions Description The MAXIMAT CX compact overfill sensor is used as a fill-level limit switch for permanently installed containers for the storage of non-flammable, water endangering liquids. Applications The fill-level sensor is suitable for liquids with an impedance of less than 5k, or a mutual capacitance to earth of greater than 50pF. Stored liquids may not tend to precipitate insulating or conductive sediments. Technical Data Functional principal: Capacitive high-frequency, fail-safe Ambient temperature: -20 to +60C Operating pressure: Atmospheric, 0.8 to 1.1bar PBT, IP65 protection per EN 60 529 Process connection: See order information Supply power: 15 to 27V DC Power consumption: W Safety Precautions PERATING NSTRUCTIONSVERFILL ENSOR BAMO IER GmbH Pirnaer Str. 24 D-68309 Mannheim, Germany Phone: +49 (0)621 84224-0 Fax: +49 (0)621 84224-90 www.bamo.de SU3558e.doc 07/14 Technical Data (continued):Outputs: Floating reed relay contact (contact opens in case of alarm) for extra-low voltage, max. 50V AC / DC, max. 0.5A, max. 10VA e.g. for operating coupling relays or PLC, TC4 signalling device or CST supply power isolatorObserve protective measures for reed relay contacts (see instruction leaflet SU3104)2-wire alarm evaluation with MAXIMAT SHR C measuring transducerNote: Simultaneous use of both outputs is not possible. Screw terminal for wire cross-sections of up to 2.5mm For external test button (connection to terminals T and C) Test button contact closed = test alarm is triggered Note: The function test executed with the test button does not replace the ope

2 rating test specified in ZG-S, section
rating test specified in ZG-S, section 6.2, which must be conducted for all probes on a regular basis at least once a year. Indication: LED (green) on the connector PCB (variant KL only): Run: LED illuminated Alarm / error: LED off Measuring circuit cable length: Max. 300m, min. wire cross-section: 0.5mm CE Mark In accordance with low-voltage directive RL 2006/95/EC and EMC directive 2004/108/EC Approvals DIBt (Germany)-Approval no. Z-65.13.494 for overfill inhibitors in accordance with WHG 19 SVTI ASIT (Switzerland)-Approval no. KVU-No. 302.019.14 for overfill inhibitors inVlarem II (Corcon bvba Belgium), Prototypekeur certificaat nr.: CP0914/3072-HCC001GOST- Clearance Certificate (Russia)42 1300 / 9026 10 290 0 Function Test: Before Installation and Initial Start-Up, and During Inspection Fill a bucket (plastic or metal) with original liquid or water (at least 5 litres) and set it onto the floor. Immerse and remove the measuring probe several Examine the switching status of the measuring circuit Fill a bucket (plastic or metal) with original liquid or water (at least 5 litres). Earth the liquid in the bucket with a cable/wire. Grasp the bucket with your hand from the outside. Immerse a finger into the liquid. At the same time, immerse and remove the measuring probe several times. Examine the switching status of the measuring circuit(refer to the respective operating instructions to this end) PERATING NSTRUCTIONSVERFILL ENSOR BAMO IER GmbH Pirnaer Str. 24 D-68309 Mannheim, Germany Phone: +49 (0)621 84224-0 Fax: +49 (0)621 84224-90 www.bamo.de SU3558e.doc 07/14 Electrical Connection voltage probe digital-inputPLC ALARM = 0 power supply 15 ...27V DC mains probe Coupling Relays or PLCMAXIMAT TC4 Signalling Device probe mains measuring transducerMAXIMAT SHR CS mains CST Supply Power IsolatorMAXIMAT SHR CS External Measuring Transducer PERATING NSTRUCTIONSVERFILL ENSOR BAMO IER GmbH Pirnaer Str. 24 D-68309 Mannheim, Germany Phone: +49 (0)621 84224-0 Fax: +49 (0)621 84224-90 www.bamo.de SU3558e.doc 07/14 Trigger Point, Non-Adjustable Trigger Point, Adjustable MAXIMAT CX40 K ... N MAXIMAT CX40 K ... V MAXIMAT CX20 K ... N MAXIMAT CX20 K ... V

3 PERATING NSTRUCTIONSVERFILL ENSOR BAM
PERATING NSTRUCTIONSVERFILL ENSOR BAMO IER GmbH Pirnaer Str. 24 D-68309 Mannheim, Germany Phone: +49 (0)621 84224-0 Fax: +49 (0)621 84224-90 www.bamo.de SU3558e.doc 07/14 Dimensions: Trigger Point, Non-Adjustable Trigger Point, Adjustable MAXIMAT CX40 K ... N MAXIMAT CX40 K ... V MAXIMAT CX20 K ... N MAXIMAT CX20 K ... V PERATING NSTRUCTIONSVERFILL ENSOR BAMO IER GmbH Pirnaer Str. 24 D-68309 Mannheim, Germany Phone: +49 (0)621 84224-0 Fax: +49 (0)621 84224-90 www.bamo.de SU3558e.doc 07/14 Electrical Connection voltage probe digital-inputPLC ALARM = 0 power supply 15 ...27V DC mains probe Coupling Relays or PLCMAXIMAT TC4 Signalling Device probe mains measuring transducerMAXIMAT SHR CS mains CST Supply Power IsolatorMAXIMAT SHR CS External Measuring Transducer PERATING NSTRUCTIONSVERFILL ENSOR BAMO IER GmbH Pirnaer Str. 24 D-68309 Mannheim, Germany Phone: +49 (0)621 84224-0 Fax: +49 (0)621 84224-90 www.bamo.de SU3558e.doc 07/14 Technical Data (continued):Outputs: Floating reed relay contact (contact opens in case of alarm) for extra-low voltage, max. 50V AC / DC, max. 0.5A, max. 10VA e.g. for operating coupling relays or PLC, TC4 signalling device or CST supply power isolatorObserve protective measures for reed relay contacts (see instruction leaflet SU3104)2-wire alarm evaluation with MAXIMAT SHR C measuring transducerNote: Simultaneous use of both outputs is not possible. Screw terminal for wire cross-sections of up to 2.5mm²(connection to terminals T and C)Test button contact closed = test alarm is triggered Note: The function test executed with the test button does not replace the operating test specified in ZG-ÜS, section 6.2, which must be conducted for all probes on a regular basis at least once a year. Indication: LED (green) on the connector PCB (variant KL only): Run: LED illuminated Alarm / error: LED off Measuring circuit cable length: Max. 300m, min. wire cross-section: 0.5mm² CE Mark In accordance with low-voltage directive RL 2006/95/EC and EMC directive 2004/108/EC Approvals DIBt (Germany)-Approval no. Z-65.13.494 for overfill inhibitors in accordance with WHG §19 SVTI ASIT (Switzerland)-Approval no. KVU-No. 30

4 2.019.14 for overfill inhibitors inVlare
2.019.14 for overfill inhibitors inVlarem II (Corcon bvba Belgium), Prototypekeur certificaat nr.: CP0914/3072-HCC001GOST- Clearance Certificate (Russia)42 1300 / 9026 10 290 0 Function Test: Before Installation and Initial Start-Up, and During Inspection Fill a bucket (plastic or metal) with original liquid or water (at least 5 litres) and set it onto the floor. Immerse and remove the measuring probe several Examine the switching status of the measuring circuit Fill a bucket (plastic or metal) with original liquid or water (at least 5 litres). Earth the liquid in the bucket with a cable/wire. Grasp the bucket with your hand from the outside. Immerse a finger into the liquid. At the same time, immerse and remove the measuring probe several times. Examine the switching status of the measuring circuit(refer to the respective operating instructions to this end) PERATING NSTRUCTIONSVERFILL ENSOR BAMO IER GmbH Pirnaer Str. 24 D-68309 Mannheim, Germany Phone: +49 (0)621 84224-0 Fax: +49 (0)621 84224-90 www.bamo.de SU3558e.doc 07/14 Installation, initial start-up and maintenance may only be performed by trained personnel! The device may only be connected to power which complies with the specifications included in the technical data and on the serial plate! The device must be disconnected from all sources of power during installation and maintenance work! The device may only be operated under the conditions specified in these operating instructions! Functions Description The MAXIMAT CX compact overfill sensor is used as a fill-level limit switch for permanently installed containers for the storage of non-flammable, water endangering liquids. Applications The fill-level sensor is suitable for liquids with an impedance of less than 5k, or a mutual capacitance to earth of greater than 50pF. Stored liquids may not tend to precipitate insulating or conductive sediments. Technical Data Functional principal: Capacitive high-frequency, fail-safe Ambient temperature: -20 to +60°C Operating pressure: Atmospheric, 0.8 to 1.1bar PBT, IP65 protection per EN 60 529 Process connection: See order information Supply power: 15 to 27V DC Power consumption: W Safety Precauti