My Bridge Design By, Jireh Alberto 3rd period My
1 / 1
My Bridge Design By, Jireh Alberto 3rd period My - slide 1 of 6 My Bridge Design By, Jireh Alberto 3rd period My - slide 2 of 6 My Bridge Design By, Jireh Alberto 3rd period My - slide 3 of 6 My Bridge Design By, Jireh Alberto 3rd period My - slide 4 of 6 My Bridge Design By, Jireh Alberto 3rd period My - slide 5 of 6 My Bridge Design By, Jireh Alberto 3rd period My - slide 6 of 6
Description: My Bridge Design By, Jireh Alberto 3rd period My Design Cost Dennis H. Mahan Memorial Bridge Project ID: 00055A- Iteration 32 (Thu, 7 Feb 2013, 10:42:45) Iteration 32 (Thu, 7 Feb 2013, 10:42:45) Type of Cost Item Cost Calculation Cost

Related Topics

Download Presentation

"My Bridge Design By, Jireh Alberto 3rd period My" is the property of its rightful owner. Permission is granted to download and print the materials on this website for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.

Presentation Transcript

slide1. My Bridge Design By, Jireh Alberto
3rd period<br>
slide2. My Design<br>
slide3. Cost Dennis H. Mahan Memorial Bridge
Project ID: 00055A-
Iteration #32 (Thu, 7 Feb 2013, 10:42:45)
Iteration #32 (Thu, 7 Feb 2013, 10:42:45)
Type of Cost Item Cost Calculation Cost
Material Cost (M) Carbon Steel Hollow Tube (5187.4 kg) x ($6.30 per kg) x (2 Trusses) = $65,360.71

Connection Cost (C) (21 Joints) x (500.0 per joint) x (2 Trusses) = $21,000.00

Product Cost (P) 4 - 100x100x5 mm Carbon Steel Tube (%s per Product) = $1,000.00
6 - 120x120x6 mm Carbon Steel Tube (%s per Product) = $1,000.00
2 - 130x130x6 mm Carbon Steel Tube (%s per Product) = $1,000.00
7 - 140x140x7 mm Carbon Steel Tube (%s per Product) = $1,000.00
17 - 170x170x8 mm Carbon Steel Tube (%s per Product) = $1,000.00
2 - 180x180x9 mm Carbon Steel Tube (%s per Product) = $1,000.00

Site Cost (S) Deck Cost (10 4-meter panels) x ($5,150.00 per panel) = $51,500.00
Excavation Cost (18,000 cubic meters) x ($1.00 per cubic meter) = $18,000.00
Abutment Cost (2 standard abutments) x ($4,000.00 per abutment) = $8,000.00
Pier Cost (1 20-meter pier) = $31,500.00
Cable Anchorage Cost No anchorages = $0.00

Total Cost M + C + P + S $65,360.71 + $21,000.00 + $6,000.00 + $109,000.00 = $201,360.71<br>
slide4. Bridge Materials<br>
slide5. Overview Lost Pratt Through truss bridge Overview Lost Pratt Through truss bridge over Cache Creek on CR 57LocationYolo County, California Status Replaced by new bridge History Built 1932; rehabilitated 1955, replaced 2010DesignSteel Pratt Through truss Dimensions Length of largest span: 140.1 ft. Total length: 347.1 ft. Deck width: 12.1 ft. Vertical clearance above deck: 14.3 ft. Approximate latitude, longitude+38.82778, -122.18278 (decimal degrees) 38°49'40" N, 122°10'58" W (degrees°minutes'seconds")Approximate UTM coordinates10/570936/4297982 (zone/easting/northing)Elevation346 ft. above sea levelUSGS topographic mapGuindaInventory numbersCA 22C-74 (California bridge number) BH 11739 (Bridgehunter.com ID)Inspection (as of 12/2008)Deck condition rating: Serious (3 out of 9) Superstructure condition rating: Serious (3 out of 9) Substructure condition rating: Poor (4 out of 9) Appraisal: Structurally deficient Sufficiency rating: 2.0 (out of 100) Average daily traffic (as of 1978)50<br>