PROCEDURE FOR PREPARATION OF WILDLIFE CONSERVATION

Published  . 0 views
↓ Download
PROCEDURE FOR PREPARATION OF WILDLIFE CONSERVATION
1 / 1
PROCEDURE FOR PREPARATION OF WILDLIFE CONSERVATION - slide 1 of 11 PROCEDURE FOR PREPARATION OF WILDLIFE CONSERVATION - slide 2 of 11 PROCEDURE FOR PREPARATION OF WILDLIFE CONSERVATION - slide 3 of 11 PROCEDURE FOR PREPARATION OF WILDLIFE CONSERVATION - slide 4 of 11 PROCEDURE FOR PREPARATION OF WILDLIFE CONSERVATION - slide 5 of 11 PROCEDURE FOR PREPARATION OF WILDLIFE CONSERVATION - slide 6 of 11 PROCEDURE FOR PREPARATION OF WILDLIFE CONSERVATION - slide 7 of 11 PROCEDURE FOR PREPARATION OF WILDLIFE CONSERVATION - slide 8 of 11 PROCEDURE FOR PREPARATION OF WILDLIFE CONSERVATION - slide 9 of 11 PROCEDURE FOR PREPARATION OF WILDLIFE CONSERVATION - slide 10 of 11 PROCEDURE FOR PREPARATION OF WILDLIFE CONSERVATION - slide 11 of 11
Description: PROCEDURE FOR PREPARATION OF WILDLIFE CONSERVATION PLAN (WCP) AND ITS SUBMISSION STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY (SEIAA) RAJASTHAN Introduction Wildlife Conservation Plan (WCP) is designed to mitigate project impacts

Related Topics

Download Presentation

"PROCEDURE FOR PREPARATION OF WILDLIFE CONSERVATION" is the property of its rightful owner. Permission is granted to download and print the materials on this website for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.

Presentation Transcript

slide1. PROCEDURE FOR PREPARATION OF WILDLIFE CONSERVATION PLAN (WCP) AND IT’S SUBMISSION STATE LEVEL ENVIRONMENT IMPACT
ASSESSMENT AUTHORITY (SEIAA)
RAJASTHAN<br>
slide2. Introduction • Wildlife Conservation Plan (WCP) is designed to
mitigate project impacts on wildlife and their
habitats.
• Prepared under the Environment (Protection)
Act, 1986 and Wildlife (Protection) Act, 1972.
• Ensures development is aligned with biodiversity
protection goals.<br>
slide3. Importance in EC • Integrates ecological protection into development
planning.
• Helps maintain biodiversity and prevent habitat
fragmentation.
• Ensures compliance with environmental norms.
• Promotes sustainable mining and industrial
activities.<br>
slide4. Legal Framework • Mandatory requirement for projects near
Protected Areas or Wildlife Corridors.
• Governed by MoEF& CC and State Forest &
Wildlife Department guidelines.
• Requires approval from the State Chief Wildlife
Warden (CWLW).<br>
slide5. Components of a WCP • Baseline study of flora and fauna.
• Identification of project impacts on wildlife.
• Conservation and mitigation measures.
• Budget allocation and implementation schedule.
• Monitoring and reporting mechanisms.<br>
slide6. Institutional Roles • Project Proponent : Prepares and funds the WCP.
• Forest/Wildlife Department : Reviews and approves
WCP.
• SEIAA/SEAC : Evaluates adequacy during EC
appraisal.<br>
slide7. Terms of Reference (ToR) for EIA Studies in Mining Conduct detailed biological study of core and 10 km buffer zone
10 km radius of periphery of the mine lease
Record flora and fauna details of core & buffer zone separately
Include information on endangered, endemic and RET (Rare, Endangered and Threatened)
Species clearly indicating Schedule of Fauna present in the study area duly authenticated<br>
slide8. Terms of Reference (ToR) for EIA Studies in Mining PP shall prepare a Conservation Plan if Schedule – I species present in the study area.
Plan shall be prepared in consultation with State Forest & Wildlife Department.
Adequate funds must be allocated within the project cost for implementing the WCP.
Proof of submission of WCP to the CWLW should be provided.<br>
slide9. Procedure to be followed as per SEIAA Order 03.11.2025 Conduct a study to identify Schedule-I flora and
fauna in the study area.
Get the list authenticated by the Deputy
Conservator of Forests (DCF).
If Schedule-I fauna are found, prepare a Wildlife
Conservation Plan with budgetary provisions.<br>
slide10. Procedure to be followed as per SEIAA Order 03.11.2025 Consult the State Forest & Wildlife Department
while preparing the plan.
Include the budget in the Environmental
Management Plan (EMP).
Submit proof of submission of the plan to the
Chief Wildlife Warden (CWLW), Rajasthan.<br>
slide11. SEIAA HELPLINE NO :
0141-3500181 Thanks for Watching For any details contact<br>