Update on Junction Box Design Update on Junction Box Design

Update on Junction Box Design - PowerPoint Presentation

mojartd
mojartd . @mojartd
Follow
343 views
Uploaded On 2020-08-03

Update on Junction Box Design - PPT Presentation

Edyta Pilorz Cracow University of T echnology Page 1 06072016 Updated PampID of the whole system Page 2 Components for Junction Box Page 3 LP Component Supplier Supplier number ID: 796176

page vcr valve inch vcr page inch valve junction box design components pressure checked fraction gas welded bar collected

Share:

Link:

Embed:

Download Presentation from below link

Download The PPT/PDF document "Update on Junction Box Design" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Update on Junction Box Design

Edyta Pilorz

(Cracow University of Technology)

Page 1

06/07/2016

Slide2

Updated P&ID of the whole system

Page 2

Slide3

Components for Junction Box

Page 3

LPComponentSupplierSupplier numberNumber on P&ID

Type of connection VCR - component

Additional informationModel collected

1Pressure transmitterGEPTX5072-TC-A2-CA-HO-PEPT3010,PT3012,PT3B30,PT3036integrated male VCR pressure range: 0-150 bar

YES

 

maximum pressure: 200 bar

2

Filter

Swagelok

SS-8TF-V20-LE (body)

FL3010

1/2 inch VCR male (VCR not integrated but welded) YESSS-8F-K4-15 (filter itslef) 3Temperature transmitterJUMODtrans T100TT3012,TT3B30,TT3B31,TT303612mm, cover welded to TEEexisting with the special coverYES4Burst discSwagelokSS-RTM8-F4-1BD3012,BD3036to be checked if exists with VCR - by Andreato be checked if exists with the VCRYES5Carel ValveCarel CV3B201/2 inch VCR gland, welded to the valve  YES6Manual valveSwagelokSS-43GEHLVCRMV3B30probably 6mm but to be checked when model grabbedit has a special joint for CO2 solutionsYES7Electric heater Firerod 1306SN37H-4450EH3B30 VCRYES8Thermal SwitchFarnell-TS3B30 to small to put it into the design-9Pneumatic valves on the inletSwagelok6LV-HBVBW4-CPV3010,PV3B14,PV3A14,PV3C141/4 inch, VCR not integrated but weldedto be discussedYESSwagelokSS-6UW-V19PV3010,PV3B14,PV3A14,PV3C141/2 inch VCRwe would rather go for these; model of cryogenic extension neededYES but without VCR, with VCR has to be collected from the supplier10Pneumatic valves on the returnRotarexHP 9012PV30361/2 inch, VCR not integratedwe would rather go for theseYESSwagelokSS-12UW-TW or SS-12UAW-TWPV30363/4 inch, VCR not integratedto be discussedYES

Slide4

Beginning of testing the components

for Junction Box

Page 4Rotarex Valve – conditions for the test:

- the valve was tested on the return pipe (liquid/gas mixture)- three different temperatures were settled:-25 o

C0 oC15

oCfour different loads were settled:0 kW2 kW5 kW7 kWGoal of the test: to check pressure drop across the valve in different vapour quality conditions

Slide5

Beginning testing the components for Junction Box

Page 5

The measurements of pressure and temperature were made:at the entrance of the manifold,before and after the valve.The values which were calculated:vapour quality – the mass fraction of the gas in two phase flow,

void fraction – the volume fraction of the gas in two phase flow. Plots obtained:

Slide6

Constraints for Junction Box

Page 6

- available space in the alcove:length: 1560 mmheight: 1000 mmwidth: 181 mm to be hanged in the alcove

to be updated!

Slide7

The very preliminary design

Page 7

It doesn’t contain all the components yet, will be working on that in the next

weeks.Preliminary design - for September.

Slide8

Page 8

Thank you for the attention!