April 2016 April 2016 This presentation contains forwardlooking statements that are subject to significant risks and uncertainties including statements related to the future operating and financial performance of the Company Although the Company believes that the expectations reflected in it ID: 767435

cadiz water acre project water cadiz project acre land 2016 million acres valley 000 years year amp pipeline contracts

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "April 2016 April 2016" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

April 2016

April 2016 This presentation contains forward-looking statements that are subject to significant risks and uncertainties, including statements related to the future operating and financial performance of the Company. Although the Company believes that the expectations reflected in its forward-looking statements are reasonable, it can give no assurance that such expectations will prove to be correct. Cadiz Inc. Safe Harbor Agreement

Renewable resources company (NASDAQ: CDZI) with diverse land and water assets – 45,000 acres of land w/ abundant groundwater resourcesAgriculture is permitted use on all properties, with AG approvals on 9,600 acres in Cadiz Valley25+ year farming history. Approved state and county permits to implement new water supply project in Southern California. About Cadiz

Cadiz Assets in Southern California

Market Overview – California 4 th year of drought with a moderate El Nino condition. Mandatory rationing - 25% of urban use cut through 2016. Traditional water infrastructure/imports not able to meet ag & urban demand. Agriculture heavily dependent on groundwater sources during drought. Limited locations with reliable groundwater supplies. Water rates and Ag land pricing reflect surging demand. Water Rates have increased approx . 6%/yr. over last 25 years. Market prices for reliable supply $1,000 - $2,000 per acre-foot in 2015. Short-term Ag water contracts over $1,500/AF Ag land pricing has escalated +6%/year over last 10 years.

Cadiz Water Resources 1,300 sq. mile watershed - size of Rhode Island. Approx. +20 MAF in storage, comparable to Lake Mead. Estimated average natural recharge 32,500 af/year.Cadiz Inc. only significant overlying land user.Water that is not pumped by Cadiz Project or used by Ag will be lost to evaporation from hyper-saline dry lakes.

Cadiz Valley Water Project Innovative and Sustainable Water Source for Southern CaliforniaPhase 1 – Conservation & Recovery Expand existing well-field and manifold system on Cadiz Inc. property to create “picket fence” to intercept and conserve water.Recover 2.5 million acre-feet of water over 50 years, transport it through a 43 mile pipeline to the Colorado River Aqueduct and then throughout So. Cal.NO adverse environmental impacts from Project operations Creates reliable supply for 400,000 people, retailers in 6 So. Cal. Counties would receive water.

Cadiz Valley Water Project - Phase 2 Once hydraulic barrier established in Phase 1 to limit loss of water to evaporation, Project can store imported water in wet years and return it to the system when needed in dry years .Facilities – Additional pipeline, pump station and spreading basins.Total storage capacity = 1 million acre-feet.Larger than most surface reservoirs in So. Cal.

Project Interconnects w/ Major CA Water Infrastructure

Construction & Contracts Phase 1 build-out costs estimated at $250M, includes pipeline, expanded wellfield , ancillary facilities, including CR6 treatment & ROW improvements. Project fully subscribed, with contracts and options to deliver 50,000 AFY @ approx. $960/AF . Storage reservations starting at $1,500/AF.

Water Project Next Steps BLM ROW Resolve dispute with BLM over access to Railroad right-of-way for 43-mile water pipeline.Pursuing administrative, legislative and legal remedies in 2016. CEQA March 2016 - Appeals Cases oral argument.Ruling expected in Q3 2016. Participating AgenciesFinalize contracts with Water Providers.MWD Providers conclude water transportation arrangements with MWD of So. Cal .

Cadiz Agricultural Development 45,000 acres of land held in fee simple with water rights all zoned to be developed for Ag.9,600 acres under conditional use permits for agriculture. 2,100 acres under 99-year lease to develop various crops and associated infrastructure. Feb 2016 payment of $12 million. Options to lease additional 7,500 acres in 2016 for $43 million. Agriculture to be developed consistent with Water Project permits and wellfield design. Leases contain buyback provision to be exercised when Water Project implemented.Comps at $7 - $11K/ acre, and have been steadily increasing.

Cadiz Agricultural Development Potential crops include: Fruits & Vegetables (dates, vineyards, citrus, squash)Field crops (alfalfa, wheat, sudan grass, Bermuda grass)Biofuels (camellia, sweet sorghum and soybean).Property benefits: Hot desert climate with moderate chill period in winter.No other overlying land uses in surrounding area (good soil quality). Access to major highway and rail transportation to reach variety of markets.

14 2015 CalASFMRA Western Ag Professionals Trend Report Imperial Valley: Good Adaptability (Produce)Imperial Valley: Average Adaptability (Alfalfa) Palo Verde Valley: Irrigation Field Crops Imperial Valley: Limited Adaptability$ / Acre $ / Acre $ / Acre $ / Acre Agricultural Land Value

Financials @ 12/31/15Shares Outstanding18 MillionMarket Capitalization$92 MillionCash$2.7 Million Debt – Sr. Secured *$44 MillionDebt – Convertible**$64 MillionEnterprise Value$200 Million* Senior Secured Mortgage - $44M: 8% Interest PIK, Maturity September 2017 ** Convertible Notes - $4M Convert at $8.05/share, 7% Interest PIK, Maturity March 2018. $60M Convert at $6.75/share, 7% Interest PIK, Maturity March 2020.

More information Website: www.cadizinc.com Email: IR@cadizinc.com Twitter: @ Cadiz_Inc