148 th MPP 19052017 Sune Jakobsen EPUAT on behalf of ATLASAFP AFP Interlock validation outline Sune Jakobsen ATLASAFP interlock validation 148 ID: 796490

interlock afp roman validation afp interlock validation roman 2017 atlas test pot 148 mpp sune jakobsen beam user lvdt

Share:

Link:

Embed:

Download Presentation from below link

Download The PPT/PDF document "ATLAS-AFP interlock validation" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

ATLAS-AFP interlock validation

148

th

MPP 19-05-2017

Sune Jakobsen

(EP-UAT

) on behalf of ATLAS-AFP

Slide2

AFP Interlock validation - outline

Sune Jakobsen

ATLAS-AFP interlock validation

148

th

MPP

19-05-2017

Test of USER_PERMIT and automatic extraction as a function of all input flags

Test of the LVDT-bypass box

2

/12

Test of hardware and software buttons

Test of Injection Permits

Conclusion of interlock tests

Test of response to the LVDT-to-limit comparison

Reminder of settings for 2017

New in 2017

Outline Injection Permits LVDT-to-limit comparison Reaction to flags LVDT-bypass box Buttons Conclusion Settings for 2017

Slide3

AFP Interlock validation – Injection Permits

Sune Jakobsen

ATLAS-AFP interlock validation 148

th

MPP 19-05-2017

1. All Roman Pots at HOME position.

2.

Observe

that the AFP inputs to the ATLAS injection permit are TRUE.

3/12

3. Move in the Roman Pot to be tested.

Purpose: Check that the Injection Permit is removed if a Roman Pot is out of garage position.

4. Observe that

the AFP to the ATLAS injection

input for the correct beam is FALSE.

Test sequence:

5. Move the Roman Pot to be tested to HOME.

6

.

Observe

that the AFP inputs to the ATLAS injection permit are TRUE.

1

3

4

5

Slide4

AFP Interlock validation – Injection Permits result

Sune Jakobsen

ATLAS-AFP interlock validation 148

th

MPP 19-05-2017

4/12

Test performed separately on each Roman Pot on 15-05-2017 (details in collimation logbook).

All worked correctly.

Summary table:

Slide5

AFP Interlock validation – LVDT-to-limit comparison

Sune Jakobsen

ATLAS-AFP interlock validation 148

th

MPP 19-05-2017

Not possible to move to illegal position, therefore:

1. Move

in the Roman Pot to be tested.

5/12

2. Make position illegal by changing limit.

Purpose: Check of the automatic extraction and loss of USER_PERMITs when a limit is violated.

3. Observed automatic extraction and (not for WARNING) loss of USER PERMIT for the beam affected.

Test sequence:

4. When extracted beyond the limit, observe the return of the USER PERMIT.

1

2

3

4

3

5. “Ringing” observed for several Roman Pots (not a problem for safety, but not nice for the log).

5

5

Slide6

AFP Interlock validation – LVDT-to-limit comparison result

Sune Jakobsen

ATLAS-AFP interlock validation 148

th

MPP 19-05-2017

6/12

Test performed separately on each Roman Pot on 15-05-2017 (details in collimation logbook).

All worked correctly.

Summary table:

“Ringing” for the USER PERMIT observed for several Roman Pots

Slide7

AFP Interlock validation – Reaction to flags

Sune Jakobsen

ATLAS-AFP interlock validation 148

th

MPP 19-05-2017

1. Cycle though STABLE_BEAM, UNSTABLE_BEAM and ADJUST and observed extraction and loss of USER PERMITs.

7/12

2.

Observe correct behavior to LVDT-to-limit comparison in all relevant combinations.

Purpose: Check of the reaction to SMP flags and the override key.

3.

Repeat with OVERRIDE in place.

Test sequence (simplified):

STABLE BEAM

ADJUST

Slide8

AFP Interlock validation – Reaction to flags

Sune Jakobsen

ATLAS-AFP interlock validation 148

th

MPP 19-05-2017

8/12

Test performed for one Roman Pot per beam on 15-05-2017 (details in collimation logbook).

All worked correctly.

Summary table on the right:

“Ringing” for the USER PERMIT observed for several Roman Pots.

Slide9

AFP Interlock validation – LVDT-bypass box and results

Sune Jakobsen

ATLAS-AFP interlock validation 148

th

MPP 19-05-2017

TEST1: Failure with AFP Roman Pots inserted.

Beam dump and then insure LHC operation without AFP Roman Pots.

9/12

TEST2 (The forbidden use case): Problem with AFP Roman Pot inserted. Recovery without beam dump.

Purpose: Check that the LVDT-bypass box force the LVDT comparison TRUE while simultaneously disabling the motors.

TEST3 (Holiday mode): Insure LHC operation without AFP Roman Pots when manpower is not available to react fast.

Fake situations (full definitions in EDMS note):

PXI OFF

TEST4: Failure with AFP Roman Pots in garage.

Beam dump and then insure LHC operation without AFP Roman Pots

PXI OFF

Result: All worked correctly.

Test performed for one Roman Pot per beam on 15-05-2017 (details in collimation logbook).

Slide10

AFP Interlock validation – Test of buttons

Sune Jakobsen

ATLAS-AFP interlock validation 148

th

MPP 19-05-2017

Hardware emergency extract: Hardware disable of power to all motors => Extraction (no change in USER PERMITs).

10/12

Software extract per Roman Pot: Extraction via DCS command to PXI (no change in USER PERMITs).

Purpose: Check functionality of hardware and software buttons.

Tests:

ATLAS SLIMOS hardware panel

Result: All worked correctly.

Test performed for one Roman Pot per beam on 15-05-2017 (details in collimation logbook).

Slide11

AFP Interlock validation – Conclusion

Sune Jakobsen

ATLAS-AFP interlock validation 148

th

MPP 19-05-2017

11/12

Some “ringing observed” on the USER PERMITs, but has no influence on safety aspects.

Full serious of all the test originally performed for TOTEM and ALFA has now also been performed for the final AFP movement and interlock systems.

All is working correctly.

Does the signature list need updating?

EDMS note

in preparation: 1808750

Slide12

Reminder for setting for 2017

Sune Jakobsen

ATLAS-AFP interlock validation 148

th

MPP 19-05-2017

12

/12

Extra margin for new system for startup phase:

TCT + 3

σ

nominal

+ 0.3

mm + 0.5 mm

= 12

σ

nominal

+

0.8 mm

Previously agreed settings:

General Roman Pot setting: TCT + 3

σnominal + 0.3 mm = 12 σ

nominal + 0.3 mm

Settings for AFP in startup phase:

Minimum 1.5 mm (not relevant for AFP).

Ultimate settings for AFP:

Suggested margin to WARNING LIMIT: 0.2 mm.

Suggested margin to DUMP LIMITs: 0.3 mm.

AFP suggests to move to the ultimate settings in the middle of the summer (e.g. after MD2).