10k x 6k overview 4k x 4k overview Caravan ABI Delivery 2 62113 1 Delivery 2 Caravan Movie 600 frames 10hz 1280x720 05m pixels with 925 adaptive samples and truth ABI Delivery 2 ID: 602630

sumo delivery caravan abi delivery sumo abi caravan road osm cityengine vehicle integration lot dirsig added nodes issues radiometry

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Delivery 2: Scene Overview" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Delivery 2: Scene Overview

10k

x

6k overview

4k

x 4k overview

Caravan

ABI Delivery 2

6/21/13

1Slide2

Delivery 2: Caravan Movie

600 frames @10hz; 1280x720 0.5m pixels with 9-25 adaptive samples and truth

ABI Delivery 2

6/21/132

caravanSlide3

Delivery 2: Radiometry Improvements

Finished work on the new “simple

radiometry

solver that drives high fidelity radiometry very quickly

Resolved issues with specular lobe falloff modeling that created artifacts in Delivery 1ABI Delivery 2

6/21/133Slide4

Delivery 2: CityEngine Integration

driveway/access nodes for lot design and SUMO

integrated sidewalks, road verges, crosswalks, driveways, curbs, and shoulders

correct lanes

for OSM and

SUMO

integration

Resolved issues with OSM/SUMO/

CityEngine

lane integration

Added road context modeling in

CityEngine

, adding parking/breakdown lanes, gutters, verges, driveways, curbs and sidewalks

Driveways and shoulder space will act as nodes for SUMO integration using edge ID and position information extracted from

CityEngine

Regional variation still limited by buggy attribute mapping in

CityEngine

-- attempting to switch to scripting

ABI Delivery 2

6/21/13

4Slide5

Delivery 2: SUMO

Meeting with MITRE on Monday to learn more about SUMO usageDelivery has a trip/route for an 8 vehicle caravan with a midway split (2 vehicles leave caravan)

Caravan mechanics (lead/trailing car and “following” behavior) are hacked in using lane restrictionsHad to reduce number of cars to 1000Need better vehicle articulation/placementIntent is to link trip start/end locations to driveway nodes and add non-networked simulation data for parking lot motion

ABI Delivery 2

6/21/13

5Slide6

Delivery 2: Added DIRSIG Tools

Added addition population distribution tools allowing arbitrary discrete distributions of object geometry and sub-object material variantsAlso added a simple (static) temporal variant tool that allows objects to be turned on/off on a daily time schedule (e.g. on between 2 and 3pm)

ABI Delivery 2

6/21/13

6Slide7

Lessons Learned: Workflow Modifications

Running up against many issues maintaining the integrity of road networks across parallel workflows with final integration in DIRSIG

Vehicle

motion

Road

geometry

SUMO

routes

CE

shapes

OSM

SUMO

network

CE

graph

DIRSIG

Vehicle

motion

Road

geometry

SUMO

routes

CE

shapes

OSM(1)

SUMO

network

CE

graph

DIRSIG

OSM(2)

Future

approach is to use the

CityEngine

generated graph and shapes to generate a new OSM file that matches what is modeled

ABI Delivery 2

6/21/13

7Slide8

Scene Fidelity Improvement: 
• Texture improvements for buildings and roads• Lot design and better building models

• Linking node data to lot design• Road signage/lights and general clutter• Additional attributed vehicle models•

Additional tree species and distributions Dynamic Scene Content:• More sophisticated traffic modeling• Significant increase in population size• Un-animated node start/stops

General Tool Development and ManualFuture Work

ABI Delivery 26/21/13

8