/
TECHNICAL BULLETIN TECHNICAL BULLETIN

TECHNICAL BULLETIN - PDF document

abigail
abigail . @abigail
Follow
364 views
Uploaded On 2021-06-17

TECHNICAL BULLETIN - PPT Presentation

AWP and Insulated Concrete Forms ICFs Refer to Nichihacomresources for the latest installation guides and technical bulletins as such information is subject to changeNichiha USA 6465 East Johns C ID: 844386

technical fero icf nichiha fero technical nichiha icf icfs product vertical support ferocorp awp ties concrete veneer johns insulated

Share:

Link:

Embed:

Download Presentation from below link

Download Pdf The PPT/PDF document "TECHNICAL BULLETIN" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

1 TECHNICAL BULLETIN AWP and Insulated Con
TECHNICAL BULLETIN AWP and Insulated Concrete Forms (ICFs) Refer to Nichiha.com/resources for the latest installation guides and technical bulletins as such information is subject to change.Nichiha USA 6465 East Johns Crossing, Suite 250, Johns Creek, GA 30097Nichiha.com Nichiha products may not be installed directly over Insulated Concrete Forms (ICFs). Past product performance issues related to ICF installations led to this overall policy. Further, our product/building code evaluations, testing, and certi�cations do not However, an Architectural Wall Panel (AWP) installation on ICFs coupled with can be viewed as a standard application to metal framing/furring. The FERO ICF-Masonry Veneer Ties must be embedded into the ICF prior to the concrete being poured. Therefore, this limits AWP applications to new construction in progress as the approach cannot apply to already-completed ICFs. The FERO ICF-Masonry Veneer Ties must be arranged to support the vertical 16 gauge metal angles offered by FERO. The vertical spacing of the ties is determined by FERO in consideration of engineering requirements (cladding dead loads and project/site WP. For AWPin a vertical orientation, please contact the Nichiha Technical Department.Please review the following document and contact FERO for questions about their product(s): https://www.ferocorp.com/technical_notes/Cladding_Support.pdfTelephone: 780-455-5098Technical Support: 1-877-703-4463salesdesk@ferocorp.comengineering@ferocorp.com