/
On 24 On 24

On 24 - PowerPoint Presentation

alexa-scheidler
alexa-scheidler . @alexa-scheidler
Follow
364 views
Uploaded On 2017-04-06

On 24 - PPT Presentation

th amp 25 th September 2013 at PUSA Complex New Delhi National Conference on Agriculture for Rabi Campaign 2013 Govt of West Bengal Department of Agriculture WEST BENGAL AN OVERVIEW ID: 534321

2013 amp west 2012 amp 2013 2012 west lakh target bengal seed farm rabi 000 total production area farmers

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "On 24" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

On 24

th

& 25th September, 2013 at PUSA Complex, New Delhi

National Conference on Agriculture for Rabi Campaign – 2013

Govt. of West Bengal

Department of AgricultureSlide2

WEST BENGAL : AN OVERVIEW

PART-I

Geographical Area

88752 sq. Km.

Nos. of Agricultural Districts

18

Nos. of Agricultural Blocks

335Nos. of Gram Panchayets3354Nos. of Mouza / Village40782Population (2011 Census)9,15,94,000Population Density(2011 Census)1029 / Sq. Km.Agro-Climatic Zones6 Nos.Gross Cropped Area(2011-12)9352952 haCultivable Area (2011-12)5700848 haNet Area Sown(2011-12)5198146 haIrrigated Area62% of Net Cropped AreaTotal Nos. of Agricultural holdings7123000 NosSize of average Land Holding0.77 ha / Holding

2Slide3

3

WEST BENGAL : AN OVERVIEW

PART-II

Cropping Intensity (2011-12)

179.93

Total Food Grains Production (2011-12)

160.09 Lakh MT

Estimated Total Food Grains Production (2012-2013, 4th Advance Estimate)165.11 Lakh MTTarget of Total Food Grains Production (2013-2014)172.30 Lakh MTSummer Rice Productivity (2011-12)3174 Kg / haEstimated Summer Rice Productivity (2012-13)3372 Kg / haTarget of Summer Rice Productivity (2013-2014)3425 Kg / haSlide4

West Bengal : Placing Issues in Perspective

Has 8% of India’s population with 2.7% of the total area,

Population Density (1029 per Sq. Km) puts tremendous pressure on land & Natural Resources,Marginal and small farmers constitute nearly 96% of the 71.23 lakh holdings,

(2010-11 census)

4Slide5

West Bengal Agriculture : Significant milestones

1

st position in Rice productionFirst position in Vegetables Production,Second position in Potato Production,Third in Flowers and seventh in Fruits Production,

Cropping intensity of 179.93% (2011-12)

5Slide6

Estimated Requirement of Crops in West Bengal

During 12th Plan Period – Part-A

Year

Population

(Lakh)

Rice

CerealsPulsesFood Grains2013-14915.94144.89166.9512.87179.822014-15923.89146.15168.4112.98181.392015-16931.98147.43169.8813.10182.982016-17940.35148.75171.7013.21184.61

In Lakh MTSlide7

Estimated Requirement of Crops in West Bengal

During 12th Plan Period - Part-B

Year

Population

(Lakh)

Oil

SeedsPotato2013-14915.9416.5550.982014-15923.8916.6951.432015-16931.9816.8451.882016-17940.3516.9952.34In Lakh MTSlide8

.

Region

June

July

August

September(Upto 15th)NormalActual(% Dep.)NormalActual(% Dep.)NormalActual(% Dep.)NormalActual(% Dep.)201120122013201120122013201120122013201120122013

Sub- Himalayan West Bengal

454

425

(-6)

552

(22)

405

(-11)

635

610

(-4)

641

(1)

531

(-16)

458

454

(-1)

279

(-39)

421

(-8)22174(-67)211(-5)229(4)Gangetic West Bengal256374(46)139(-46)229(-10)318229(-28)303(-5)239(-25)311427(37)225(-28)377(21)135127(-6)173(28)100(-27)West Bengal322391(21)277(-14)288(-11)425356(-16)416(-2)336(-21)360436(21)243(-33)392(9)164109(-34)186(13)143(-13)

Rainfall Analysis (m.m.) for the year 2011 - 2013Slide9

Crops

2012-2013 (4

th

Estimate)

1

st

Estimate

2013-14APYAPYKharif Rice4216.05510881.68325814290.0011203.5002612Kharif Maize40.58896.769238445.00117.002600Kharif Pulses54.09636.86568163.85049.925782Jute576.7098228.161(‘000 bales)14.27

(bales)

550.00

8112.50

(‘000 bales)

14.75

(bales)

Mesta

6.696

82.671

(‘000 bales)

12.35

(bales)

7.00

87.50

(‘000 bales)

12.50

(bales)

Sugarcane

16.077

1685

104808

20.0021000105000A=Area in ’000 ha, P= Production in ’000mt, Y= Yield in Kg/haKHARIF ASSESSMENT – 20139Slide10

Crops

4

th

Advanced Estimates

RABI 2012-2013

RABI PLANNING

(TARGET)’2013-14

APYAPYSummer Rice12104080337215005137.53425Wheat32296028173501004.52870Rabi Maize65320492380400.005000Rabi Pulses168.42171.4921018

200

210.00

1050

Food Grains

1768.38

5482.842

3100

2134

6752.00

3170

Oilseeds

717.339

821.06

1145

750

870.00

1160

Potato

386.607

11598.21

30000

4001820032000A=Area in ’000 ha, P= Production in ’000mt, Y= Yield in Kg/haRABI PLANNING - 201310Slide11

11

Progress on

Kissan Credit Card and Credit FlowYear

Item

Target

Achievement

2012-13KCC (Nos.)10,00,0001000215Credit Flow (Rs. In crore)23500.0017,000.00 (72.3%)2013-14KCC (Nos.)12,00,0001,80,000(1st Qrt)Credit Flow (Rs. In crore)37100.007120 (20%) (1st qtr)Source: Lead Bank - UBISlide12

NATIONAL FOOD SECURITY MISSION

2013-14Slide13

Area of Operation….

13

NFSM – Rice

NFSM – Wheat

NFSM-Pulse

Jalpaiguri

1. Jalpaiguri All the 17 Districts2. Coochbehar 2. Coochbehar 3. Uttar Dinajpur 3. Uttar Dinajpur 4. South 24 Pgrs. 4. Dakshin Dinajpur 5. Purulia 6. Howrah 7. Purba Medinipur 8. Paschim Medinipur Slide14

Fund Statement under NFSM during 2012-13

Component

Approved Outlay

Unspent Balance of

2011-12

As per AUC

Accrued Interest up to 2011-12Fund Released by GOI during 2012-13Total Fund Available during 2012-13Expenditure during 2012-13Unspent Balance of 2012-13 as on 01.04.13NFSM – Rice3662.85336.60280.852840.183457.632601.69855.94NFSM – Wheat831.8489.12--604.57693.69684.788.91NFSM – Pulse897.4992.63--757.05849.68

653.74

195.94

A 3 P

540.00

127.28

--

277.72

405.00

306.49

98.51

Publicity

--

20.58

--

--

20.58

-

20.58

TOTAL

5932.18

666.21

280.854479.525426.584246.701179.88( Rs in Lakh)Slide15

Fund Statement under NFSM during 2013-14

Component

Approved Outlay by GOI

Additional Action Plan for Unspent Balance as on 01.04. 13 approved by GOI

Revised Action Plan approved by GOI during 2013-14

(2+3)

Total Fund Released by GOI till date (1st & 2nd Installment)Expenditure during 2013-14 up to July, 2013Remarks1234567NFSM – Rice3799.98715.964515.942485.861017.608194 DC during Kharif out of 149 DCsNFSM – Wheat721.57187.34908.91672.78-Yet to be startedNFSM – Pulse1291.1685

104.771

1395.939

167.00

2.566

To be conducted during Rabi Summer

A 3 P

898.60

-

898.60

35.89

-

-Do-

TOTAL

6711.3185

1008.071

7719.3895

3361.53

1020.1741

( Rs in Lakh)Slide16

Sl. No.

District

No. of DC @ 100 ha

Seed Requirement (MT)

1

Coochbehar

6

9.02Jalpaiguri1015.03Uttar Dinajpur57.54Purulia1015.05Paschim Medinipur1015.06Purba Medinipur46.07Howrah4

3.0

8

South 24 Parganas

6

9.0

Total

55

79.5

District wise No. of Hybrid Rice Cluster DC during 2013-14 under NFSM-RiceSlide17

Sl. No.

District

No. of Cluster DC @100 ha

WHEAT Seed Requirement

(including Additional DCs)

in MT

Variety

1Coochbehar220.0PBW-3432Jalpaiguri550.0PBW-3433Uttar Dinajpur440.0PBW-3434Dakshin Dinajpur110.0PBW-343Total12120.0District wise No. of HYV Cluster DC during 2013-14 under NFSM-Wheat Slide18

Sl.

District

No. of DCs @ 100 ha

Total Seed Requirement in MT

1

Coochbehar

1

3.02Jalpaiguri2.57.53Uttar Dinajpur2.57.54Dakshin Dinajpur13.05Maldah824.06Murshidabad1648.07Nadia

13

39.0

8

Birbhum

6

18.0

9

Purulia

4.5

13.5

10

Paschim Medinipur

1

3.0

11

Purba Midnapur

1

3.0

12

Bankura

3

9.013Bardhaman6.519.514North-24 Parganas13.015South-24 Parganas26.016Howrah915.017Hooghly26.0TOTAL80.00237District wise No. of HYV Cluster DC during 2013-14 under NFSM-Pulse Slide19

Sl. No.

Crop

District wise No. of Units (@ 100 Ha each) of A3P

Maldah

Murshidabad

Nadia

Birbhum

Purulia Total 1.Black gram 5-17-6282.Lentil 360421021173.Gram-20-

10

2

32

TOTAL

8

80

59

20

10

177

District wise & Crop wise Allotment of A3P units (@ 100 ha each)

under NFSM – Pulse for Implementation in West Bengal during 2013-14Slide20

Bringing Green Revolution to Eastern India (BGREI)

2013-14 Slide21

SLSC APPROVED ACTION PLAN FOR 2013-14

Sl. No.

Intervention

Financial Outlay (Rs. in lakh)

1

Block Demonstration

10027.6554

2Asset Building Activities1412.10003Site Specific Activities2587.24464Marketing Support1100.0000TOTAL15127.0000Slide22

I) Progress of Block Demonstration during 2013-14

Sl. No.

Agro-eco

situation

Targets as approved by SLSC

Achievement

Physical (ha.)Financial (Rs. in lakh)Physical (ha.) Financial (Rs. in lakh)PADDYI. Kharif1Up-land 303002157.513830300-2Shallow Lowland874006192.940486200-3Medium Deep Water9700 687.20629700-II. Boro4

Irrigated HYV

50200

532.1200

-

-

5

Hybrid Rice

3500

70.8750

-

-

Total Paddy

181100

9640.6554

126200

-

B

WHEAT

18000

387.0000

-

-Total (Rice + Wheat) 19910010027.6554126200-Slide23

B. Asset Building Activity

SL. NO.

INTERVENTIONS

PHYSICAL (NO.)

RATE OF ASSISTANCE (Rs.)

APPROVED FINANCIAL OUTLAY (Rs.in lakh)

1

PUMP SETS14121100001412.10C. Site Specific Activity:Sl. No.InterventionApproved Financial Outlay (Rs. in lakh)1Construction of irrigation channel800.00002Electrification of Pump Set @ Rs. 8000/-1687.20003Monitoring & Documentation100.0446TOTAL2568.1150D. MARKETING SUPPORT:SL. NO.INTERVENTIONSPHYSICAL (NO.)UNIT COST (Rs.in lakh)APPROVED FINANCIAL OUTLAY (Rs.in lakh)1KRISHAK BAZAR2

550 (approx)

1100.00Slide24

Rashtriya

Krishi

Vikas Yojana (RKVY)

2013-14

Department of Agriculture

Government of West BengalSlide25

Outlay and Expenditure on Agriculture and Allied Sectors compared to total Annual Plan size.

State: West Bengal

Annual Plan Year

Total State Plan Expenditure (A.E./R.E./B.E.)

Outlay/

Expdt

. for Agric. & Allied sector

(Excluding RKVY)GOI release of RKVY fundExpenditure of Agriculture & Allied Sectors as % of Total Plan Outlay2007-08 (A.E.)9073.09357.8154.933.942008-09 (A.E.)10396.90503.20147.384.842009-10 (A.E.)12121.59597.36147.384.932010-11 (A.E.)11784.94674.95335.985.732011-12 (A.E.)21029.67867.62486.654.132012-13 (R.E.)23029.191137.89374.58*4.942013-14 (R.E.)26674.00**1390.47NA5.21Rs. In CroreN.B.- * GOI Allocation was Rs.464.81 Crore but released Rs. 374.58 Crore including Sub-schemes. ** State Nodal Department has mooted a proposal to Finance Deptt. for enhancement of outlay under Agri & Allied sector to the tune of Rs. 1600 crore in lieu of Rs. 1390.47 crore. Slide26

Allocation, release and U/C of RKVY fund during XI Plan Period and 2012-13

Year

Allocation

Release by GOI

Release by

Deptt

.

UC submitted2007-0854.9354.9354.9354.932008-09147.38147.38147.38147.382009-10147.38147.38147.38147.382010-11476.15335.98335.98335.982011-12486.65486.65486.65486.65Total (11th Plan)1312.491172.321172.321172.322012-13464.81374.58374.58317.01*Figure shown under RKVY includes RKVY (Normal) & Sub-schemes (viz. BGREI,NMPS, NVIUC & INSIMP)State – West Bengal

(Rs. in crore)Slide27

GOI Allocation & Release under RKVY & Sub-schemes during 2013-14 For WEST BENGAL

Sl. No.

Name of the Project/sub-schemesAllocation(Rs. In crore)Released(Rs. In crore) 1RKVY (Normal)

334.10153.08

2

RKVY Sub-scheme

a

BGREI151.2775.64bNVIUC (Vegetable cluster)4.352.18cINSIMP (Nutri-cereal)0.020.01dNMPS 14.407.20Total 504.14238.11Slide28

SYNOPSIS OF RKVY SCHEMES/ PROJECTS (AGRICULTURE DEPARTMENT)

Sl. No.Name of the projects/ schemes (Stream-I) 2013-14

SLSC Approved Outlay (Rs. In Lakh)1Production of quality seeds1325.602Infrastructure development of State Agril. Farms/ Research Stations/ SAU Farms for agricultural development in West Bengal.210.803

Initiatives for Crop Development in West Bengal567.404Support to Plant Protection & Integrated Pest Management21.30

5

Support to Soil Health & Integrated Nutrient Management

432.50

6Farm Mechanization6000.00Total8557.60N.B.- 1st Instalment of fund for RKVY Stream – I projects has been released by GoI, the Nodal Deptt. is expected to release the fund soon. Slide29

SYNOPSIS OF RKVY SCHEMES/PROJECTS (AGRICULTURE DEPARTMENT)

Sl. No.

Name of the project/schemes (Stream – II) 2013-14SLSC Approved outlay(Rs. in Lakh)1Infrastructure Development of Agril. Training Centres & Research Institutes.271.61

2Agri- Research Projects for providing support to growth & development of agriculture and allied sectors in the State.224.98

3

Support to Extension functionaries for facilitating Agricultural Extension & mass campaign in the state of West Bengal

480.57

4Strengthening of Govt. Agricultural Farms for Seed Production1135.2325Integrated Farming system approach-Demonstration cum training center for agriculture and allied sectors. 50.006Comprehensive Development of Kumari Kanan Integrated Farm in Purulia District50.007 Special programme for Agricultural Development of Darjeeling district under GTA.242.50Total2454.89N.B.- 1st Instalment of fund for RKVY Stream – II projects has been released to the implementing agencies. Slide30

INTEGRATED SCHEME OF OILSEEDS, PULSES, OILPALM AND MAIZE (ISOPOM) 2013-14Slide31
Slide32
Slide33
Slide34
Slide35

PROGRESS REPORT ON SOIL TESTING LABORATORIES (STLs) FOR THE YEAR (2013-14) UPTO JULY 2013

Soil Testing Laboratories under:

No. of Laboratories

Annual Analyzing Capacity

No. of samples Analyzed for nutrients

Capacity utilized (%)

No. of Distt. having STL

No. of Distt. not having STLNo. of STL having AASStaticMobile Total1. State Govt.108181040001353313.710972. Public undertaking SectorNil Nil Nil 3. Private SectorNil Nil Nil Total

10

8

18

104000

13533

13.01

10

9

7

Progress of distribution of Soil Health Cards:

Period

No. of cards made available to farmers

Kharif

2013 up to

July

2013

13533

Rabi

2013-14(Target

)

104000Slide36

Progress Report on Fertilizer Quality Control Laboratories for the year 2013-14

(up to July 2013)

Fertilizer Quality Control Laboratory under:

No. of Laboratories

Annual Analyzing Capacity

No. of samples Analyzed

Capacity utilized (%)

No. of FQCL having AAS1. State Govt.3450094921.032. Public Undertaking SectorNilNilNilNilNil3. Private SectorNilNilNilNilNilTotal 3450094921.03Proforma-9Slide37

Hybrid Maize Seed Production: HQPM 1, HQPM 5, Slide38

SEED REPLACEMENT RATE (SRR) OF DIFFERENT CROPS DURING

2012-2013 AND TARGET DURING 2013-2014 IN WEST BENGAL.

Sl. No.

Name of Crop

2011 –

2012 (%)

2012 –

2013(%)2013 – 2014(Target)1.Paddy33.634.035.02.Wheat43.445.747.03.Maize29.030.033.04.Gram26.927.9233.05.Kalai(Urd)35.636.4737.06.

Moong

33.6

33.39

35.0

7.

Khesari

21.1

22.0

50.22

8.

Lentil

29.6

29.8

32.99

9.

Pigeon Pea

45.0

46.0

46.50

10.

Ground-nut

40.441.044.4711.Mustard41.546.1950.012.Sesame34.936.9137.514.Potato26.727.1733.04Slide39

Requirement and Availability of C/Q Seed

for Rabi 2013-14 & Target 2014-15

Sl. No.

CROP

2013-14

Target 2014-15

Requirement

(Q) Production /Availability Deficit/Surplus(Q) Requirement(Q) Production / Availability Deficit/Surplus(Q) 1.Paddy5600005600000563000563000-2.Hybrid Paddy2200160(-)20402300210(-)20903.Maize60006000-

6000

6000

-

4.

Pulses

25735

25740

(+)5

25800

25800

-

5.

Ground-nut

17010

17010

-

19350

19350

-

6.

Wheat

169200160000(-)9200177600177600-7.Potato22800001884000(-)39600026800002000000(-)6800008.Mustard1122016523(+)53031331016850(+)3540 (Quantity In Qtls)* After inclusion of the Pulse D/Cs under NFSM into Certification, the availability during 2014-15 will increase as per area covered.Slide40

Seed CertificationSlide41

Seed Testing Status for 2012-13 & Target for 2013-14

Sl. Number

Type of SeedSeed samples analyzed in 2012-13Target for 2013-141. Service576

10002.Certified1969520000

3.

Official

2816

30004.Total2308724000Slide42

Sl.

No.

Name of the

States

/UTs

2010-11

2011-12

2012-13 (Upto March 2013)2013-14(upto Aug-2014)Sample analyzedMisbranded (%)Sample analyzedMisbranded (%)Sample analyzedMisbranded (%)Sample analyzedMisbranded (%)1West Bengal 5125 (0.98)4173(0.72)71811(1.53)2421(0.41)STATEMENT SHOWING THE STATISTICS OF THE ANALYSIS OFPESTICIDE SAMPLES FOR QUALITY CONTROL INQuality Control & Insecticide Control Laboratory Slide43

PROGRESS OF FARM MECHANISATION SCHEMES DURING 2012-13

Scheme

Target for 2012-13

(Rs. in

Crore)

Up to date Achievement

of 2012-13

(Rs. in Crore)Nos. of FarmMachinery Distributed so farRate of Subsidy(Rs.)RKVY19.071 14.70Tractor-132Power tiller-1517Power reaper-97Zerotillege-2Pumpset-6625Tractor- :45,000/-Power Tiller- :45,000/-Power Reaper- :40,000/-Zero Tillage Machine - :15,000/-Pump set- :10,000/-BGREI53.15 37.59Tractor-249Power tiller-2820Power reaper-190Zerotillege-06Pumpset-21715Name of Scheme :Financial Support scheme for Farm Mechanisation (FSSM)” Slide44

PROGRESS OF FARM MECHANISATION SCHEMES DURING 2012-13

Scheme TARGET Uptodate No. of

Achievement Machinery DistributedNFSM Rs. 8.573 Rs.3.33884 Tractor-11 No. Crore Crore Power Tiller - 179 Pump set - 2382 Power Reaper - 23Slide45

Target for 2013-14

Target for FSSM 2013-14: Rs. 84.77725 CroresTarget for Small Farm Implements:

Rs. 20 CroresSlide46

Budget for Farm Mechanization for 2013-14 under Sub-Mission on

Agricultural Mechanization (SMAM) in West Bengal

Sl No

Scheme/Component

Target for 2013-14

(

Rs. in

Lakh)1Establishment of Farm Machinery Bank for Custom Hiring.6676.002Promotion & Strengthening of Agricultural Mechanization through Training, Testing and Demonstration.a) Demonstration Component693.60b) Outsourcing of Training82.8753Subsidy for selected Agril. Machinery and Equipment7870.004Input Subsidy to small & marginal farmers for adopting suitable Farm Mechanisation3000.005Enhancing farm productivity at village level by introducing appropriate Farm Mechanization in selected villages 600.006Post Harvest Technology & Management 69.65TOTAL18922.475Slide47

Requirement And Availability Of Fertilizers During Rabi,2013 -14

Sl. No.

FertilizersPotential Requirement

Assessed Requirement [Finalized In ‘Zonal Conference Rabi 2013-14]

1.

UREA

8,90,180

8,90,0002.DAP2,84,3632,50,0003.MOP2,16,4402,16,0004.SSP2,92,4744,00,0005.NPK Complexes6,49,3205,50,000TOTAL23,32,77723,06,000IN MTSlide48

Status Of Quality Control Of Fertilizers During 2013-14

Sl.No

No. of LaboratoryAnnual CapacitySamples ReceivedSamples AnalysedFound Non-standard34500

1011927144Slide49

Consumption Of Fertilizers During Rabi 2012-13

Fertilizers

Consumption In MT

UREA

868507

DAP

281571

SSP233111MAP64AS5216MOP136543NPK COMPLEX476992Slide50

Use of bio-fertilizers, organic manures , Compost & green manure during Rabi- 2012-13

BIO-FERTILIZER

ORGANIC MANURE

VERMI -COMPOST

RURAL & CITY COMPOST

GREEN MANURING

1650

MT43.35 LAKH MT23.95 LAKH MT87.7 LAKH MT685100 HASlide51

InMT

Zinc Sulphate

Ferrous Sulphate

Copper Sulphate

Borax/ Boric Acid

Manganese Sulphate

Magnesium SulphateOthers4400175398358529526006491USE OF MICRONUTRIENTS DURING RABI 2012-13 (in MT) Slide52

1

SEWP – 2013-14

IDWG approved SEWP Submitted to GOI

2

Provisional AUC,

2012-13

Submitted to GOI

3Annual Progress Report 2012-13Submitted to GOI 4Cumulative Progress Report up to 31/07/2013Submitted to GOI 5Statement of Expenditure, 2012-13Submitted to GOI Fund for the Year 2013-14 is yet to be released to West Bengal. ATMA –West Bengal: Present Status Slide53

Unspent opening balance as on 01/04/2013

1542.93909

Central Share

1031.23173

State Share

90.55588

Funds received from DAC

NilRelease of State’s Matching Share NilTotal Expenditure as on 31/08/2013968.452Central Share877.89612State Share90.55588Unspent closing balance as on 01/09/2013574.48709Central Share153.33561State ShareNilFund for the Year 2013-14 is yet to be release to West Bengal. Financial Statement: 2013-14 (Up to 31/08/2013) Slide54

Financial Achievement: 2012-13 and Target 2013-14

Sl

No.ACTIVITIESUtilized during 2012-13 (Lakh

Rs.)Proposed for

2013-14 under SEWP

(Lakh

Rs.

)1Training of Farmers489.381164.7102Demonstration81.300377.5203Exposure Visit of Farmers142.080230.4504Mobilization of Farmers’ Groups42.630199.3005Farm Information Dissemination58.640190.0006Agril. Tech. Refinement, Validation & Adoption64.070210.9607Farm School105.500346.8378Innovative Activities55.630173.0009Administrative Expenses638.0082088.8610Farmers’ FriendNil804.0811Developing SREPNil47.50012SAMETI level Activities92.732129.58013State level ActivitiesNil210.130TOTAL1769.9706172.927Slide55

Physical Achievement: 2012-13 and Target 2013-14

Sl

No.ACTIVITIESAchievement during 2012-13Target for 2013-14 under SEWP

1Training of Farmers

57884

mandays

128093

mandays2Demonstration2032 no. DCs6864 no. DCs3Exposure Visit of Farmers3683 mandays38930 mandays4Mobilization of Farmers’ Groups287 groups774 groups5Farm Information Dissemination412 leaflets/ booklets650 leaflets/ booklets6Agril. Tech. Refinement, Validation & Adoption16448 mandays35550 mandays7Farm School315 FSs1038 FSs8Farmers Award210 farmers & 29 groups1029 farmers & 95 groups9Kissan Mela / Exhibition5 nos.19 nos.10Farmers’ FriendNil20102 nos.11Developing SREPNil1912SAMETI level Activities87 courses80 coursesSlide56

Sl.no

.

Name of the post

No.ofpost

Recruitment position

1

State Coordinator

1Not recruited2Project Director, District1816 posts filled up through Secondment3Deputy PD, District3836 posts filled up through Secondment4Accountant Clerk, District1919 posts filled up through Secondment. Process initiated for recruitment 5Computer Programmer, District19Recruited -2 (Coochbehar , Malda) , Advt. published -4 (Burdwan. Nadia, North 24 Paraganas & Howrah)6BTM, Block347Recruited - 57 (12 in Coochbehar, 30 in South 24 Paraganas & 15 in Malda). Advt. published -4 (Burdwan. Nadia, North 24 Paraganas & Howrah)7S M S at Block694Recruited -2 (Siliguri ATMA dist). Advt. published -4 (Burdwan. Nadia, North 24 Paraganas & Howrah)8Deputy Director, SAMETI8Filled up through Secondment9Accountant Clerk, SAMETI1Filled up through Secondment10

Computer Programmer,

SAMETI

1

Process

going on.

11

Farmers Friend at Village

20102

Not recruited.

SPECIALISTS AND FUNCTIONARY SUPPORT, 2013-14

Slide57

Contingent Plan-2013-14

Under post

kharif season, crops like Black Gram,Maize will be grown.Promotion of Khesari, Toria, like crop will also increase area & production of Pulse & Oilseed crops even under rainfed

condition.Rabi crops like Wheat, Mustard, Lentil, Maize, Groundnut & Summer crops like Sesame and Moong are the best suited crops under West Bengal situation.

Slide58

Challenges & Strategies ………..

Challenges:

Departure of rainfall from normal rhythm particularly in rainy months,Reduced span of winter period to grow cold loving Rabi crops resulting restricted VRR,More than 64% of the Geographical Area is under cultivation with 180% cropping intensity & putting pressure on natural resources.

High cost of Phosphatic & Potassic

fertilizer facilitates imbalanced NPK ratio in soil(2.92:1.6:1.0).

Slide59

Strategies:

Under Low area & High productivity Zone, increased C/Q Seed availability from increased Seed Certification

Programme.Under High area & low productivity zone, increased Mechanization with Zero Till machine & use of quality seed.Utilization of potential Rice fallow areas under Relay(poira) cropping of Lentil, Khesari

, Toria & mustard.Integrated Planning for supply of Quality Resources to the production systems.

Increased production of

Vermicompost

, other low cost indigenous nutrient sources & increased employment generation,

Reducing the Gap of IPC & IPU.Better income realization by farmers with market linkageSlide60

‘Area Expansion’.

Strategic Technological Tools :Farm Mechanization with Zero/Minimal seed-drill to utilize residual moisture for timely sowing of Wheat, Pulses & Oilseeds. Extension of Intercropping, Mixed cropping, Relay cropping of Pulse, Oilseed & Maize to low lying Rice Fallow & upland field during Early/Rabi and Rabi season respectively,

Expansion of irrigation potential & reducing the gap between IPC & IPU through micro irrigation, Reduction of conveyance loss, Soil & Water conservation and Dry land & rainfed farming

, & to convert cultivable Waste land to cultivated Land.

Research

with new crops & varieties & under diversified soil and changing climatic condition for

improved SRR & VRR. Slide61

‘‘Vertical Expansion’ through ‘Productivity Augmentation’.

Strategic Technological Tools

:Increased Seed &Variety Replacement rate.Expanding SRI Boro Area & with saved water resources, increasing irrigated Wheat, Pulse, Oilseed & Maize cultivation.

Training ,Extension & e-Governance. Farm mechanization : Electrical pumps, Zero till seed drill, Tractor, PowerTiller, Drum Seeder ,Delivery Pipe etc.

Soil Health Management & Soil Test based nutrient Management, INM & IPM,

Resource conservation technology:

Mulching

, Efficient irrigation Conveyance , to holding size of the farmers.Slide62

Better income’ realization by farmers

Providing alternative input production capacity to farmers through:Azolla/Vermi/Compost/Green/Leaf

manuring.Demonstration & research on Integrated Farming System with livelihood support,

Selection of popular market crops and varieties,

Better provision of Storage and linking post harvest processing to Agro-Industries in PPP mode for value addition

.

Reducing cost of production: Stress on location specific technology development integrating the ITKs. Providing bio-fertilizers, bio-pesticides etc to combat high cost P & K Fertilizers &synthetic pesticides.Slide63

Prioritised Issues of West Bengal

Due to Climatic aberration during Kharif & Rabi, early Duration Rabi Varieties of Wheat, Lentil, Mustard, Khesari (

Lathyrus), Groundnut, Sunflower with high yield potentiality under the region and availability of Quality/Certified seeds and it’s integration with Seed Rolling Plan.Intensified Mechanisation programme with funding support as per choice of farmers for high area with low productivity zone.Resource conservation technology with Zero Till/FIRB or other technological Tools for Rabi crops like Wheat, Rice, Maize, Pulses & Oilseeds.Marketing infrastructure for increased price realizationMicro-Irrigation facility with rational subsidies under all the Departments.Value addition through Intensified Post Harvest Management Programme including Food Processing. Establishment of Custom Hiring Service for farm mechinaries. Slide64

Thank You

Related Contents


Next Show more