Operational Safety Guideline  No. 11 Operational Safety Guideline  No. 11

Operational Safety Guideline No. 11 - PDF document

alexa-scheidler
alexa-scheidler . @alexa-scheidler
Follow
403 views
Uploaded On 2016-07-10

Operational Safety Guideline No. 11 - PPT Presentation

Authorised By Ass Dir Infrastructure Planning Compliance Issue Date September 2013 Last Reviewed September 2013 Next Review Date September 2014 Page Number 1 of 2 THIS DOC ID: 398963

Authorised By: Ass. Dir.

Share:

Link:

Embed:

Download Presentation from below link

Download Pdf The PPT/PDF document "Operational Safety Guideline No. 11" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Operational Safety Guideline No. 11 Authorised By: Ass. Dir. Infrastructure Planning & Compliance Issue Date: September 2013 Last Reviewed: September 2013 Next Review Date: September 2014 Page Number: 1 of 2 THIS DOCUMENT IS UNCONTROLLED WHEN PRINTEDDO NOT use this machine unless you have been trained in its safe use and operation. Description of Work:Using a Plunge Router Potential Hazards: Exposed moving parts and electrical hazard with the potential to cause harm through entanglement, impact and cutting, exposure to noise, dust, projectiles and sharp objects. Personal Protective Equipment (PPE) Required Gloves Eye Mask Protection Safe Work Checklist: 1. PRE-Operation: Task (e.g. Drawings, instructions, specifications etc) is clearly understood. Ensure appropriate guarding is in place. Choose the desired router bit and ensure it is securely installed. Operational Safety Guideline No. 11 Authorised By: Ass. Dir. Infrastructure Planning & Compliance Issue Date: September 2013 Last Reviewed: September 2013 Next Review Date: September 2014 Page Number: 2 of 2 THIS DOCUMENT IS UNCONTROLLED WHEN PRINTED Competent Persons(The following persons are authorised to operate the equipment). Name: Contact Details: