Gabriele Carcassi 10112010 IRMIS3 modules Module name Goal Status Infrastructure Components Lightweight inventory Cabling eLog Lattice Save Restore Magnet measurement PV Crawler Epics ID: 336688

maintainer production tbd requirements production maintainer requirements tbd covered module prototype ability gabriele carcassi distribution api data edit model

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "IRMIS3 Status and Plans" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

IRMIS3 Status and Plans

Gabriele Carcassi

10/11/2010Slide2

IRMIS3 modules

Module name

Goal

StatusInfrastructureComponents(Lightweight) inventoryCablingeLogLatticeSave RestoreMagnet measurementPV CrawlerEpics DB generation

Nothing

Prototype

Alpha

Beta

ProductionSlide3

Infrastructure

Requirements

Build/packaging – production

Logging – productionSecurity (AuthZ/AuthN) – prototypeTBDImprove loggingNot coveredNothing that we are awareAvailable in the distribution with general supportMaintainer: Gabriele CarcassiSlide4

Component module

Requirements

Ability to edit component types – production

Ability to edit components (installations) in hierarchy – productionTBDFinal UI touchesNot coveredNothing that we are awareAvailable in the distribution with general supportMaintainer: Gabriele CarcassiSlide5

Cabling module

Requirements

Ability to edit cable types – production

Ability to edit cable tray/partition/paths – productionAbility to edit cables – productionTBDLoad test (missing data)UI consolidationNot coveredNothing that we are awareAvailable in the distribution with general supportMaintainer: Gabriele CarcassiSlide6

Lightweight inventory module

Requirements

Ability to track parts – production

Ability to install/uninstall parts – productionTBDInstallation/uninstallation history – will export to the eLogNot coveredShipping and receiving – not plannedComponents lifecycle – not plannedTravelers – not plannedAvailable in the distribution with general supportMaintainer: Gabriele CarcassiSlide7

eLog module

Requirements

Data model – prototype

UI – prototypeAPI – nothingTBDRequirement verification and implementationNot coveredNot availableMaintainer: Don DohanSlide8

Lattice module

Requirements

Data model – prototype

PVAccess service/API – prototypeTBDRequirement verification and implementationNot coveredMultiple lattices using different “as-built” parametersNot availableMaintainer: Don DohanOld version available in the distribution as isMaintainer: Gabriele CarcassiSlide9

Save restore module

Requirements

Data model – prototype

PVAccess service/API – prototypeTBDRequirement verification and implementationNot coveredNot availableMaintainer: Don DohanSlide10

Magnetic measurement module

Requirements

Data model – prototype

TBDRequirement verification and implementationNot coveredNot availableMaintainer: Don DohanSlide11

PV Crawler module

Requirements

PV Crawler – production in IRMIS2

API – alphaUI – nothingTBDTest and bundle the crawler with IRMIS3, finalize API and implement UINot coveredNothing that we are awareNot availableMaintainer: ?Slide12

EPICS db generation module

Requirements

Channel description for component types – prototype

Control hierarchy can be mined to guide/validate db?TBD??Not covered???Not availableMaintainer: ????