Inspection of Inspection of

Inspection of - PDF document

byrne
byrne . @byrne
Follow
343 views
Uploaded On 2021-08-20

Inspection of - PPT Presentation

Page 1of 3SarkaghatJahuGhumarwin SH19 on 22ndJuly 2014 Road SafetyInspection on SarkaghatJahuGhumarwin RoadSH19 was carried out from safety point of view only The review was aimed to identify po ID: 867701

safety road condition construction road safety construction condition ghumarwin jahu night emp weather inclement provisions engineer zone contract compliance

Share:

Link:

Embed:

Download Presentation from below link

Download Pdf The PPT/PDF document "Inspection of" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

1 Page 1 of 3 Inspection of Sar
Page 1 of 3 Inspection of Sarkaghat - Jahu - Ghumarwin (SH - 19 ) on 22 nd July , 2014 (Road Safety) Inspection on Sarkaghat - Jahu - Ghumarwin Road (SH - 19 ) was carried out from safety point of view only. The review was aimed to identify potential hazards on this under construction road, which is likely to be completed shortly. The following are submissions: 1 . Widening of s ection from Ghumarwin to Jahu is underway for qu i te some times but condition of this section is not traffic worthy and is very bad for plying of all type of vehicles and movement of pedestrians . The condition of first 3 - 4 kilometres from Ghumarwin end is beyond expectations for such a mega road project. 2 . Engineer to ensure compliance with provisions of diversions as per Contract Agreement. It seems that Environmental Engineer of CSC is not ensuring compliance of Environment Management Plan (EMP). 3 . Although,

2 Contractor has installed cautionar
Contractor has installed cautionary board s for road condition ahead at almost every Km , but it does not relieve him of adhering to various contract provisions for providing traffic worthy road during construction activities . 4 . Construction Zones require road safety interventions and completed portions require parapets , pre - warning signage of road condition ahead . Run off the road c annot be ruled out at critical sections . L ocations where widening is underway, needs to be delineated by way of warning s igns and barricades to avoid accident/ roll - down of vehicles in night and inclement weather. The safe navigation of horizontal curves compound with inclement weather or night driving is an issue for immediate safety improvements at some sites. Delineation is an important safety factor in any condition including night visibility. Retro - reflective m aterial required to be used for night and inclement we

3 ather visibility on delineators. 5
ather visibility on delineators. 5 . Contractor’s storage and work - zones are needed to be in good conditions for movement on foot by his own staff at works. 6 . Construction in Jahu - Sarkaghat Section would invite more public ire, if condition , as witnessed in Ghumarwin - Jahu section would prevail , Engineer need to be more cautious in taking preventive measures as per Contract Provisions. 7 . Effective supervision for compliance of EMP provisions in the C ontract needs to be ensured by Engineer. Page 2 of 3 Construction Zone Safety - enhancement required for night & inclement weather Page 3 of 3 Construction & Work - Zone Safety - EMP Issues Good Practice - Warning signs PWD Bridge at Risk due to bad EMP (at every alternate km.) (Construction Zone - EMP Issues)