Chapter Topics Placing concrete directly from trick mixers Manual or motorized buggies Crane and bucket Concrete conveyors Concrete pumps Placing Directly from Truck Mixers Most economical placing method ID: 680059

placing concrete conveyors pumps concrete placing pumps conveyors mounted bucket pump chapter avoid boom inch discharge mixer placements crane buckets motorized manual

Share:

Link:

Embed:

Download Presentation from below link

Download Presentation The PPT/PDF document "Placing Equipment Chapter 5" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.


Presentation Transcript

Slide1

Placing Equipment

Chapter 5Slide2

Chapter Topics

Placing concrete directly from trick mixers

Manual or motorized buggies

Crane and bucket

Concrete conveyors

Concrete pumpsSlide3

Placing Directly from Truck Mixers

Most economical placing methodMinimal handling; minimizes segregation

With chute extensions up to 20 ft

Deliver 8 to 10 cy and weigh up to 80,000 lbs

Avoid cracking sidewalks and driveways

Avoid open excavations or walls

If wall 6 ft deep, stay 6 feet away

Take advantage of mixer-mounted conveyorsSlide4
Slide5
Slide6
Slide7
Slide8

Manual or Motorized Buggies

Transport from mixer to

deposit

Walk-behind or

riding

Some can fit through 36 inch

doorways

Placing capacity ranges from 15 to 20

cy/hr

Consider costs

Buggy may need temporary ramps

Can’t run over reinforcingSlide9
Slide10

Crane and Bucket

Lift concrete bucket to desired

location

Typically for small placements:

columns

Two buckets increase

production

Buckets

Different sizes: 1/3 to 3 cy

Different attachments: rubber discharge chutes Slide11
Slide12

Conveyors

Mounted to ready mix truckSeparate conveyors

Can discharge concrete quicklySlide13
Slide14
Slide15

Concrete Pumps

Trailer pumpsGeneral purpose: 20 to 35 cy/hr

Pump up to 250 ft vertically

Pump up to 1000 ft horizontally

4 to 5 inch diameter pipelines

Labor intensive for pipeline placing and removalSlide16
Slide17

Concrete Pumps

Boom-mounted pumpsMost efficient method for large placements

Consider these factors

Delivery output

Pump layout and boom length

Site conditions

Number of pumps neededSlide18
Slide19