3 TeV Many new agreements for Xband development and machines recently One new coll inst Canadian Light Source Saskatoon WEB pages Nikos Kokkinis has taken over as responsible from ID: 783902
Download The PPT/PDF document "CLIC: from 380 GeV up to" is the property of its rightful owner. Permission is granted to download and print the materials on this web site for personal, non-commercial use only, and to display it on your personal computer provided you do not modify the materials and that you retain all copyright notices contained in the materials. By downloading content from our website, you accept the terms of this agreement.
Slide1
CLIC: from 380 GeV up to 3 TeV
Many new agreements for X-band development and machines recently
One new coll. inst. (Canadian Light Source, Saskatoon)
Slide2WEB pages
Nikos Kokkinis has taken over as responsible from Anastasiya
Safronava (who did a great job getting our WEB pages in a good state – many thanks)
Nikos also covers LCC WEB pages and LC news (moved from
Fermilab
to CERN)
Will move to common intro page for CLIC (will become
clic.cern
) for acc. and
phys
/
det
:
link
)
Slide3Various meetings LCWS in Strasbourg in October
Asian LCWS in Japan late May Next International LCWS will be in the Americas in the Autumn 2018
ICFA seminar in Ottawa early November –
CLIC presented by Phil
ECFA meeting CERN mid November
–
CLIC presented by Lucie
Again a reminder about the implementation meetings (typically on Friday 9-11)
Slide4CLIC week in January – register now
Goto:https
://indico.cern.ch/event/656356/overview
Slide5CLIC week in January – now registered ?
Slide6Main accelerator document for Strategy
Two main documents; this one and one about what is needed for 2020-2026 (will describe the second more next time)
Slide7CLEAR (no talk today but …. )
Link: https://indico.cern.ch
/event/681488/
Slide8~3 GeV X-band linac and SPS for physics
Non collider physics workshop 21-22.11 – introduced e-beams at CERN
The physics case
(light dark matter):
https
://indico.cern.ch/event/644287/contributions/2762531/attachments/1561974/2459592/CERN_Nov2017_Schuster.pdf
(page 35 onwards most relevant
)
Use “LDMX type” of beam as reference (~1016 electrons/year at around 10 GeV, in bunches of 1-10e per 5-25ns)Accelerator possibility
at CERN
:
https
://indico.cern.ch/event/644287/contributions/2758574/attachments/1563035/2461801/e-beams.pptx
Many possibilities for physics - and accelerator R&D (see links above
–
more being considered)
Slide9e-beam facility at CERN Accelerator implementation at CERN of LDMX type of beam
X-band based 60m LINAC to 3 GeV in TT4-5. Fill the SPS in 2s (bunches 5ns apart) via TT60
Accelerate to ~10 GeV in the SPS Slow extraction to experiment in 10s as part of the SPS super-cycle
Experiment(s) considered in UA2 area or
–
better - bring beam back on
Meyrin
site using TT10/TT2, two options at the end of TT10 now considered
Slide10Today
Drink/light food outside for the survivors at the end
Several more suggestions for talks received
–
> CLIC WS and future PMs